Electrical Installation Condition Report
BS7671:2001 (2011) Requirements for Electrical Installations
Client Name:
Location:
Contract Number:
This Report is for the attention of:
Date(s) of Visit

Contents

1 / Summary and Declaration.
2 / Extent and agreed limitations of the Examination.
3 / Scope of Inspection and Testing.
4 / Origin of Supply and Main Protective Bonding Details.
5 / Distribution Board Details
6 / Other parts of the installation subjected to inspection and test
7 / Observations and Recommendations.
8 / Rectification Log

Section 1: Summary of the Inspection and Testing

Result of Inspection and Test: Choose an item.
General Condition of the Installation: Refer to Section 7 for details of Observations and Recommendations.
This age of this installation is unknown, although much of the installation is of varying age and standard of workmanship.
The installation is in a Choose an item. condition generally, however Choose an item. are in need of renewal or remedial work to bring the installation up to a satisfactory level of compliance with the latest edition of BS7671.
The installation in general has been extended over the years without due regard to the provisions of any electrical regulations, and in some circuits loading and/or diversity.
The level of protection to exposed and extraneous parts Choose an item..
We strongly advise that consideration be given to the renewal of Choose an item..
Note:
For Satisfactory status the defects with timed limitations should receive remedial attention
On completion of the necessary remedial works the Electrical Installation Condition Report can be considered as “Satisfactory” and does not require replacement, however the remedial work will require either an Electrical Installation Certificate or a Minor Electrical Installation Works Certificate.

Declaration

This Electrical Installation Condition Report confirms the condition and status of the installation subject to Section 2 and Section 3 of this report at time of visit.
Name / George Morgan / Instruments Used
Company / Inspection Network Ltd / Multi-Function / Fluke 1652 9355076
Address / Unit 1b
Wallyford Industrial Estate
Wallyford
East Lothian
EH21 8QJ / Loop Impedance / Robin 4141923
Continuity / NA
Insulation / NA
RCD Tester / NA
Date of Inspection / Click here to enter text.
Date of Next Inspection / Click here to enter text.
Signature /
Position in Company / Engineer Surveyor

Section 2: Extent and agreed limitations of the Examination

Extent of Installation covered by this report:
Type of installation: Choose an item.
The premises consist of a Choose an item storey building with production, dispatch, administration and welfare areas.
The installation comprises of XXXXXX distribution boards and/or consumer units, designated as INLXX to INLXX inclusive, and an Origin of Supply situated within the XXXXXX area. The installation was subjected inspection and where necessary testing, except where defined in “Limitations” below.
Limitations:
Scope of Examination “Type B” agreed with client, due to power not being removed from installation.
Refer to “Limitations” in Scope of Inspection and Testing.
No records, drawings or manuals were available at this visit.
Inspection and Testing was restricted to those parts of the installation considered to be Landlord’s Fixtures and Fittings.
High mounted luminaries and equipment were inaccessible and therefore not inspected nor subjected to testing.
Insulation Resistance Testing was not applied to any part of this installation due to the fitting of accessories and equipment sensitive to this test.
A true value of Ze (external earth loop impedance) could not be measured at the origin, as the removal of power would cause interruption to operation and/or production, however the measured value of Zs is satisfactory.
Visual Inspection
Where accessible the fixed electrical installation will be subjected to visual inspection, this inspection will include accessible Distribution Boards and/or Consumer Units, accessible conductors and protective conductors, and upto 10% of socket outlets, switching devices and luminaries.
The visual inspection will also include the requirement for correct labelling.
Supplementary Testing-General
Supplementary Testing may be limited by factors such as incorrectly or ambiguously marked circuits/protective devices and, that the power could not be removed from the installation.
Supplementary Testing-Continuity of Earthing Conductors and Protective Bondings
Continuity Testing of accessible protective conductors to include Earthing Conductors, Main Protective Bondings, Supplementary Protective Bondings where a measurement greater than 0.05Ω will be deemed excessive.
Supplementary Testing-Continuity of Earthing Conductors and Protective Bondings
Accessible Circuit Protective Conductors, and upto 10% of Fixed Equipment and Machinery. A measurement greater than 1Ω will be deemed excessive.
Supplementary Testing-Polarity
Polarity Testing of conductors to ensure correct connection and termination at Distribution Boards and/or Consumer Units, Protective Devices (to ensure fitted to phase conductors only), and upto 10% of fixed equipment and machinery.
Supplementary Testing-Earth Fault Loop Impedance
Earth Fault Loop Impedance testing will be carried out to the Origin of Supply, accessible Distribution Boards and/or Consumer Units, accessible socket Outlets, and 10% of Fixed Equipment and Machinery. A measurement greater than the “75% Rule of Thumb” will be deemed excessive.
Supplementary Testing-Operation of Devices
Where accessible and clearly labelled upto 10% devices and switches will be tested for satisfactory operation
Supplementary Testing-Residual Current Devices (RCD)
All accessible and clearly labelled RCD’s to be tested. A measurement greater than 40ms for final circuits will be deemed excessive.
Supplementary Testing-Prospective Fault Current –
Prospective Fault Current Testing will be carried out to the Origin of Supply and accessible Distribution Boards and/or Consumer Units.
Supplementary Testing-Insulation Resistance Testing
To be carried out at the discretion of the Inspecting Engineer of up to 10% of the accessible circuits.

Section 3: Scope of Inspection and Testing

Inspection Method / To carry out a visual inspection of the electrical installation where accessible.
Electrical
Testing / To supplement the visual inspection with electrical testing as considered necessary for protection against electric shock from direct or indirect contact
Where insulation resistance testing is carried out it will be the duty of the owner/occupier to ensure that all appliances and /or accessories are unplugged before the test and reinstated after the test, and that isolation of the installation to be tested had been agreed. Inspection Network Limited will not be liable for any damage resulting from this test.
Limitations / The inspection and testing will be conducted where practicable at the discretion of the Inspecting Engineer, taking into account installation availability, accessibility and any limitations agreed with the client. High level equipment and luminaries will not be inspected/tested unless safe access facilities have been provided.
Cables concealed within trunking and conduits, or cables and conduits concealed under floors, roof spaces, ceiling voids and generally within the fabric of the building will not be visually inspected.
Supplementary testing will not be carried out on any unidentified, incorrectly identified, or ambiguously marked circuit or distribution board/consumer unit.
Insulation resistance testing will be not carried out on any circuit which contains discharge lighting, electronic or similar sensitive circuitry and accessories, this includes heating and ventilation controls. Similarly Insulation Resistance testing will not be carried out on any unidentified or incorrectly identified part of the installation.
Exclusions / The following specialist areas are subject to separate contract and do not form part of the Periodic Inspection and Test
a.  Emergency lighting systems
b.  Lightning protection systems
c.  Lift installations
d.  Potentially explosive atmosphere installations, which are subject to local authority requirements
e.  Any part of the installation which involves working at heights.
f.  Systems in excess of 1000Volts
g.  Fire, security and door entry systems
h.  Data/telecommunication systems
i.  Heating and ventilation controls and equipment
Report / The Electrical Installation Condition Report reflects the condition and status of the installation at time of inspection and testing.

Section 4: Origin of Supply Details

Supply Details / Main Switch or Circuit Breaker Details
Location / Location
Condition of service cable(s) / Choose an item. / Type of isolation
Condition of service head / Choose an item. / Manufacturing standard
Condition of tails - distributor / Choose an item. / Number of poles / Choose an item.
Condition of tails – consumer / Choose an item. / Rating / A
Labels applied / Choose an item. / Labels applied / Choose an item.
Protective Device and Type / Choose an item.
Supply Protective Device Rating / A
Number of Live Conductors / Choose an item.
Configuration / 3 Phase Neutral & Earth
Nominal Voltage / Choose an item. / V
Nominal Frequency / 50 / Hz
Prospective Fault Current / KA
External Loop Impedance (Ze) / Ω
Main Earthing Conductor Details
Supplier’s Earth Configuration / Choose an item.
Presence and condition of MET / Choose an item.
Earthing Conductor Type / Choose an item.
Earthing Conductor size / Choose an item.
Earthing Conductor condition / Choose an item.
Earth Safety Labels fitted / Choose an item.
Earth Current measurement / A
Main Protective Bonding Details
Cross Sectional Area / Minimum 10mm²
Water Service Continuity / Choose an item. / Choose an item.
Gas Service Continuity / Choose an item. / Choose an item.
Oil Service Continuity / Choose an item. / Choose an item.
Structural Continuity / Choose an item. / Choose an item.
Connections to MET / Choose an item.
Earth Safety Labels fitted / Choose an item.

Section 5: Distribution Board Details

Distribution Board Identification / INL / Switch Details
Distribution Board Location / Type / Choose an item.
Distribution Board Manufacturer / BS or BSEN Type / Choose an item.
Number of Ways / Number of Poles / Choose an item.
Accessibility / Choose an item. / Rating / A
Integrity / Choose an item.
Protective Devices / Choose an item. / Measurements
RCD Details (lΔn) / mA / Prospective FC / KA
Polarity / Choose an item. / Ze/ZS (DB) / Ω
Final Circuit Conductors Condition / Earth Current / A
Final Circuit Identification / Choose an item. / RCD Time / mS
Supply Protective Device
Supply Conductor Configuration / Choose an item. / Notices
Number of Supply Conductors / Choose an item. / Two Versions / Choose an item.
Supply Conductors Condition / Choose an item. / Live Terminals / Choose an item.
Supply Voltage and Frequency / Choose an item. / V / 50 / Hz / RCD Test / Choose an item.
Means of Earthing / Choose an item. / Other Danger / Choose an item.
Distribution Board Identification / INL / Switch Details
Distribution Board Location / Type / Choose an item.
Distribution Board Manufacturer / BS or BSEN Type / Choose an item.
Number of Ways / Number of Poles / Choose an item.
Accessibility / Choose an item. / Rating / A
Integrity / Choose an item.
Protective Devices / Choose an item. / Measurements
RCD Details (lΔn) / mA / Prospective FC / KA
Polarity / Choose an item. / Ze/ZS (DB) / Ω
Final Circuit Conductors Condition / Earth Current / A
Final Circuit Identification / Choose an item. / RCD Time / mS
Supply Protective Device
Supply Conductor Configuration / Choose an item. / Notices
Number of Supply Conductors / Choose an item. / Two Versions / Choose an item.
Supply Conductors Condition / Choose an item. / Live Terminals / Choose an item.
Supply Voltage and Frequency / Choose an item. / V / 50 / Hz / RCD Test / Choose an item.
Means of Earthing / Choose an item. / Other Danger / Choose an item.

Section 6: Other parts of the installation subjected to inspection and test

Others Parts of the installation Inspected and/or Tested / √
X / R2
Ω / P
√ / Zs
Ω / RCD
mS / Comments
(If necessary)
Presence of diagrams, chart or records / √ / - / - / - / -
Presence of Danger and Other Notices / √ / - / - / - / -
Labelling of switches, devices and terminals / √ / - / - / - / -
Visible Supplementary Bonding and Measurement / - / √ / - / - / -
Condition and Polarity of Switching Devices / - / √ / √ / - / -
Condition and Polarity of Isolation Devices / - / √ / √ / - / √
Phase Rotation of 3 Phase Outlets / - / √ / √ / -

For R2 where √ = A resistance measurement of less than 1Ω, and X = A resistance measurement greater than 1Ω

For P where √ = Correct polarity, and X = Incorrect Polarity

For Zs where √ = An Earth Fault Loop Impedance value less than the maximum allowable limit, and X = An Earth Fault Loop Impedance value greater than the maximum allowable limit.

For RCD where √ = A value less than 40 mS at 5xlΔn, and X = A value greater than 40 mS at 5xlΔn

Section 7: Observations and Recommendations.

1 / Observations requiring urgent immediate remedial attention:
None
There is an open entry into the
There are open entries into the
There is an open entry into the distribution board/consumer unit designated as INL1.
There are open entries into the distribution boards/consumer units designated as:
There are blanks missing in the facia of the distribution board/consumer unit designated as INL1.
There are blanks missing in the facia of the distribution boards/consumer units designated as:
The measurement of the main earthing conductor continuity is excessive.
There are terminations and connections without containment throughout the installation.
There are exposed live conductors without insulation throughout the installation.
There are badly damaged outlets and accessories allowing access to exposed conductors and terminations at the following positions:
The following conductive part is now live due to an earth fault:
The following parts have incorrect polarity:
2 / Observations which are potentially dangerous requiring urgent remedial attention:
None
The measurement of the XXXXXXXX protective conductor continuity is excessive.
The means of earthing for this installation is by using utility pipework as an earth-electrode.
There is no RCD protection for this TT system.
An Earth Fault Loop Impedance value greater than the maximum allowable limit required for operation of the protective device has been measured at the following part(s) of the installation:
There are oversized and/or ineffective protective devices supplying the following circuits.