SAHID MAULANA SUTANTO

Cell phone: +60 17 3276520

Office phone: +60 3 23312675

House phone: +60 3 42518706

Email: ;

Key Competencies / §  Carries out reservoir engineering studies, using black oil simulation and classical reservoir engineering approach, to develop various green and mature fields (both oil and gas field) to achieve optimal recovery.
§  EOR and waterflood projects experience.
§  Reservoir management and surveillance experience.
§  Knowledgeable in production engineering and technology: log interpretation, well-work execution, completion design, artificial lift and nodal analysis.
§  Knowledgeable in petroleum economic and decision analysis.
§  Makes presentation and follow-up on information and studies required, also giving presentations to management and other stakeholders to get project approval.
§  Reviews the result of reservoir engineering studies carries-out by Operators for Field Development Plan, as well as provision for project sanction.
§  Annual reserves and business plan estimate and reporting.
§  Coach junior Reservoir Engineers.
Experience / 2008 – 2010
Senior Reservoir Engineer
Petronas PMU,
Petroleum Resource Development, Field Development
Kuala Lumpur, Malaysia
1.  Performed in-house reservoir engineering study, using numerical simulation, to develop green field (E6 field, oil rim gas cap carbonate reservoir) and mature carbonate gas field (M3 field) to achieve optimal oil recovery, to find the by-passed hydrocarbon and establish optimum off take operations.
2.  Performed in-house reservoir engineering study, using Material Balance and analytical reservoir engineering, to investigate (in term of GIIP and reserves) and screen 15 mature gas fields (Central Luconia) prior embark to detail numerical simulation study.
3.  Reviewed studies carried out by Operators, identify the finding and makes presentation to PMU management prior project sanction approval and commercialization agreement.
4.  Provision to Gumusut-Kakap project (deep water oil field development) sanctions carry-out by Operator to achieve the optimum recovery as per Field Development Plan.
5.  Perform for Reservoir Management Review for various fields under Petronas Production Contract Sharing.
6.  Coach local junior Reservoir Engineers.
2001 – 2008
Reservoir Engineer
Chevron Pacific Indonesia,
Riau, Central Sumatra, Indonesia
1.  Surfactant-Polymer Flooding Project (2006 – 2008).
a.  Built Area A-Minas field sector model using CHEARS IMPES Simulator black oil and performed history match
b.  Focal point for production and completion engineering assessment:
§  Generated basis of design for producer, injector and monitoring wells.
§  Generated construction and completion design for producer, injector and monitoring wells.
§  Artificial lift selection.
§  Generated Remedial Work Plan for Subsurface Risk Mitigation Plan.
2.  Waterflood Projects (2002 – 2006)
·  Pungut Field Waterflood Project and Pinggir South Field Pressure Maintenance Project
o  Performed Reservoir Characterization Evaluation Study (Pressure Transient Analysis, Injectivity / Step Rate Test, Core-flood test and Water Analysis)
o  Updated 3D reservoir simulation (using CHEARS)
o  Generated Uncertainty Management Plan and Risk Mitigation Plan
o  Developed Waterflood Surveillance Plan
o  Snaked with Management and Government to obtain approval
o  Lead well-work/project execution/commissioning
o  Run post- project planning
§  Libo South East field waterflood optimization study
§  Waterflood surveillance and optimization : Pedada Field pattern waterflood (spinner survey, injectivity test and diagnostic plot such as IWR, Hall plot, PVI)
3.  Well-Reservoir Management (2002 – 2005)
§  Field Development Plan studies, including 3D reservoir simulation:
a.  Pungut Field Full Cycle Depletion Plan (FCDP)
b.  Infill Wells Opportunity: Tandun, Cebakan and Pungut Fields
c.  Pungut Deep Exploratory
·  Reserve evaluation/reporting
§  Identified and generated well-work programs for oil wells & injectors:
o  Water Zonal Isolation (cement squeeze, packers)
o  Stimulation: Acidizing, Hydraulics Fracturing
o  Perforation Program: Casing Gun, Deep Penetration Gun, StimGun
o  Horizontal Well Completion and Improvement : ECP designs, lateral cleaning-out
o  Artificial Lift Design and Optimization (Nodal System Analysis, Tubing Pump/ESP Improvement Proposal)
o  Downhole Scale Treatment: ESI (Encapsulated Scale Inhibitor), DSST (Downhole Scale Squeeze Treatment), Annular Injection Treatment, ESP Scale Removal
2001
Jr. Reservoir Engineer
TOTAL E&P Indonesie, Balikpapan, East Kalimantan, Indonesia
§  Monitored 150 gas wells at Tunu North Field
§  Generated static gradient survey program and its interpretation for particular gas well
§  Generated monthly gas reserves and avails
Honor / ·  Presentation in PETRONAS PETROLEUM ENGINEERS FORUM 2009, in Kuala Lumpur, December 2009. The presentation title is: Enhanced Recovery Gas Initiatives through Reservoir Performance Overview and Screening Study of Central Luconia Gas Fields.
·  Presentation in SPE ATW: “The New Paradigm – Transferring Technologies and Field Experiences for Successful EOR Applications”, in Xian – China, 3 – 7 September 2006. The presentation title was: Designing ESP as an Artificial Lift Equipment in Surfactant/Polymer EOR Scheme, Case Study: Minas Field, Central Sumatra.
·  Received 3 Quality Awards from Chevron Pacific Indonesia in November 2005, as part of multidisciplinary team for developing and executing a cost effective waterflood project in Pungut field, mobile well test project and ESI (encapsulated scale inhibitor) implementation.
·  Oral Presentation in Chevron Reservoir Management Forum “Designing a Cost–effective Waterflood for a Small and Mature Field: Pungut Field Case Study”, Houston, Texas, 15 – 18 May 2005.
Publication / R.R.R. Barkah, G.W. Jacobs, J.H.H. Sitorus, S.M. Sutanto: “Reservoir Characterization and Modeling of Bekasap Formation for Waterflood Optimization and Field Development, Case Study Pungut Field, Central Sumatra”, 2006 AAPG International Conference and Exhibition in Perth, Australia.
Education / 1996–2000 Institute of Technology Bandung (ITB), Indonesia
§  B.S., Petroleum Engineering
§  GPA = 3.16 of 4.0
§  Final Project, title:
Gas Lift Requirement and Unit Design for Gas Died Well Start-up Caused By Liquid Loading (Case Study at Tambora Gas Field, East Kalimantan – TOTAL E&P Indonesie)
Training / §  Experimental Design Workshop, Chevron Energy Technology Company, 8 – 9 June 2006.
§  History Matching Workshop, Chevron Energy Technology Company, 5 – 7 June 2006.
§  Applied Reservoir Simulation Workshop, Chevron Energy Technology Company, 9 – 13 May 2005.
§  Applied Waterflood Workshop, PT. CPI, February 2005
§  Coiled Tubing Workshop , Dowell – Schlumberger , February 2004
§  Hydraulic Fracturing School , Halliburton , November 2003
§  Chevrontexaco Project Development And Execution Process (CPDEP) Workshop , PT. CPI, August 2003
§  Horizontal, Multilateral And Sidetrack Drilling And Completion Seminar, ChevronTexaco EPT - PT. CPI, May 2003
§  Merak Software & Petroleum Economic Analysis Workshop, PT. CPI, May 2003
§  Applied Reservoir Engineering, PT. CPI, August 2002
§  Formation Damage And Stimulation - Practices, PT. CPI, June 2002
§  Waterflood Management School – Reservoir Management, ChevronTexaco EPT – PT. CPI, March 2002
§  Cementing Course, Dowell – Schlumberger, February 2002
§  Production Operation, PT. CPI, November 2001
Skills/Software / §  Log interpretation: CBL-VDL, Gamma Ray, Resistivity, Density-Neutron, Cast-V, USIT, CHFR, CO, MRIL Logs
§  Supervise and QC well-work execution: Remedial Cementing, Hydraulic Fracturing, Acidizing, Horizontal Well Lateral Cleaning-out, ECP setting, Step Rate Test, Sand Clean-out with Coiled Tubing, Downhole ESP Scale Removal
§  Simulation: CHEARS and Eclipse 100 Simulator
§  PVTi
§  PETEX Suite (Prosper, MBAL, GAP)
§  WEM 10 SP5
§  Pressure Transient Analysis (PanSys and Saphir)
§  Merak Suite (PEEP, Decision Tree, Volts)
§  Landmark DSS 2000
§  Probabilistic (Crystal Ball)
§  MS Office (Word, Excel, PowerPoint, Visio, Project)
Certificates / Chevron Project Development and Execution Process (CPDEP)
Birth Place/Date / Surabaya (Indonesia)/ November 16, 1977
Nationality / Indonesia
Marital Status / Married
References / Available upon request

1