Mohammed Shahid Rahman

INSTRUMENT ENGINEER

Email-

Kuwait: +965 66702179 / 65854946

India: +919931918870

Resume

Summary

A Professional Instrumentation Engineer with over 17 years’ experience in engineering, projects and commissioning for a number of Oil & Gas (Upstream and Downstream) projects, in the field of Instrumentation and ICSS. Extensive experience in design & upgrade of instrumentation, Control, Safety, Fire and Gas, Hazardous Areas (AS/NZS, IEC, IECEx, ATEX, NEC), HAZOP, SIL Reviews (IEC61508), Factory Acceptance Testing (FAT), Site Acceptance Testing (SAT)

EDUCATION QUALIFICATION:

Bachelor of engineering in Instrumentation and controls, Bangalore University 1993 Oxford Engineering College Bangalore University (India)

SUPPORTING KNOWLEDGE AND SKILLS

·  Hazardous Areas - Selection and Inspection (IEC, IECEx, SA/NZS, ATEX, NEC)

·  IEC61508 Safety Instrumented Systems

·  Foxboro I/A series-10.1 & 6.2.1,/8.1, Emerson Delta V Field bus ,

·  Honeywell TDC 3000 & TDC-3000X, Total distributed control system, Honeywell Field bus ,

·  Honey Well FSC- Fail safe control system (FSC - Honeywell Safety Management Solution), & Fisher Rosemount – RS3, Distributed Control System

·  Several Package Control Systems based on PLC (Modicon). Fiscal Metering System.

Safety HSE Courses

·  PTW: Work Permit System (TOTAL E&P YEMEN)

·  Basic Fire Fighting (TOTAL E&P YEMEN)

·  Safety Regulations, Work at Height, H2S Escape Training, BA Training. (TOTAL E&P YEMEN)

·  Basic First Aid (TOTAL E&P YEMEN)

·  Confined Space (TOTALE&P YEMEN)

·  Near Miss Reporting, PTW, Work at height (CTJV QATAR)

·  Emergency Evacuation Procedure. (TOTAL E&P)

·  Occupational Health & Hygiene, Environment Management

Driving License No:

26935604793: (State of Qatar) 2305222347: (Kingdom of Saudi Arabia)

269081506813: Kuwait

Known languages (and levels)

·  English-Very Good

·  Arabic-A little

·  Hindi-Very Good

COMPUTER PROFICIENCY

Windows 98/07, VISTA, ME, XP, NT,

Microsoft Office 2007/10 (Word, Excel, PowerPoint) (Advanced user)

TOTAL 17 YEARS INSTRUMENTATION EXP.IN OIL & GAS FIELD

EMPLOYEMENT SUMMARY:

Company Name Worleyparsons

Date from 01 Oct. 2013 to 11 Dec. 2014

Position (Lead Inst. Engineer) DCS Specialist

Project WAFRA JOINT OPERATION

Responsibilities

Participates in development of Control Philosophy, system integration, SAFE charts, Alarm Management Plan, Provides design for process control system, ladder logic diagrams, Reviews P & ID’s and ensures logic is aligned with Process Objectives and HAZOP recommendations, Coordinates closely with process Engineers and Operations and maintenance staff to ensure correct control logic
Writes DCS programs, troubleshoots problems, performs engineering changes and assist with installation and commissioning of DCS systems, Designs and implements communication protocol between different manufactures of control systems, Provides detailed documentation of control system and prepares As-built documents, O & M and training manuals.

Company Name TOTAL E&P

Date from 20 Feb. 2012 to 7Aug. 2013

Position Instrumentation & Telecom Supervisor

Project KPP Block-10 Yemen

Responsibilities

Working as an Instrument Supervisor for Power Plant Project Handling of the instrument erection and commissioning activity, Responsible for looking activity done by contractors as per TOTAL Specifications Witness of ICAPS test and Authorize to sign ICAPS form for pre-commissioning and final commissioning of the systems with complete loop check, Handling of the site engineering issues with corrective action. Witness all kind of inspection for construction, pre-com and final commissioning Testing and Commissioning of Fiber optic network Cable.

Company Name Archirodon KSA

Date from April 2011to 14th Feb.2012

Position E&I Engineer

Project Marafiq Yanbu II Power & Water (Saudi)

Responsibilities

I am working as a supply thoroughly experienced in E&I- Project execution involving activities where included Review of Project Drawings, Preparation of Critical Construction related Procedures, Material &Equipment purchase Requisition, Technical Evaluation leading of Procurement of Material Preparation of work methods, Inspection test plan, Manpower Schedule vis-a-vis Overall Project Plan,

Material control, material reconciliation, Supervision of E&I 'Construction activities.

Company name Chiyoda Technip Joint Venture

Date from 27th Oct.2008 to 31st July 2010

Position PMC Instrument Supervisor

Project RGX-6/7 and QCS 6/7 Raslaffan (Qatar)

Responsibilities

Supervising the construction, commissioning and start-up, I have followed construction as an instrument systems Supervisor and owner's representative, supervising the contractor and make field changes necessary to improve or correct design errors or omission. I am also an active participant in Calibration, loop checkout, and starting up pneumatics and electronics instruments and control devices. Involved in the erection, construction, commissioning of 2 units 30 MW, mark V, & mark VI GE SPEEDTRONICS gas turbine control system. Involved the SATs of DCS, ESD, F & G, CMS, Analyzer Houses and other Vendor Package Skids To carry out Instrument Loop checking, Functional testing, Calibration & Stroke check of all Field bus Control valves & Hart type SDV, ESDV, MOV valves & RCS ESDV system & its functionality DCS Control Narratives testing.ESD Cause and Effect testing. Testing of Compressors Sequence Testing of Shutdowns Sequence Pumps and Fans Logic testing Commissioned the Train 2 comprises of 40MW GTGs & STGs, Air Compressors, Nitrogen Package, Fuel Gas Skids, Off Gas Compressor, Boilers and Flare, Condensate Degassing System, Pump motors and Fan Motors, Communicates job safety requirements to ensure that safety of personnel and equipment through compliance with all safety precaution to understand the work objectives. Responsible for various engineering assignments ranging from feasibility studies to the introduction of designs and drawings to manufacturing. To ensure that all documentation are furnished such as P&ID’s, Cause & effect, Logic diagram, interlock narrative, IPS interlock description, sequence details, data sheets, ESD schematics, hook-up, wiring diagrams, Control Narrative and method statements.

conpany name Kharafi National co.wll

Date from May 29th 2007 to 1st SEP.2008

Position Instrument and Control Engineer

Project KNPC Shuaiba refinery

Responsibilities

Checking of the manufacturer Technical documentation, and preparing/Gathering of the needed equipment technical documentation

Have to manage the interfaces between themselves and manufacturer, suppliers, vendors & project staff in particular for the recovery of all documentation.

Preparation of the spare part files / equipment taking into account the most common failure needed spares, Establishing the spare part lists according with the Company form and specification Optimize the references of spare parts by checking the existing Spare Parts references Optimize the quantity of the new spare parts with the affiliate’s existing spare part in stock. Establishing the Preventive maintenance program by defining the needed preventive maintenance frequencies based on their own experience and the manufacturer recommendation taking into account the existing company strategy

company name Petrofac facility management

Date from 4th Sep.2005 to 17th Mar.2007

Position Lead Instrument Tech

Project Project west Kuwait KOC

Responsibilities

Control and Protection System, distribution control systems (DCS), turbine machinery, steam generators, thermal control system and pipelines instrument equipment in the plant. Includes monitoring of work execution and providing guidance to ensure conformity to statutory and Company regulations, deals personally with more complex maintenance, supervises shutdown and turnaround maintenance activities, and executes modifications and commissioning of expansions for new plant activities. Prepares turnaround and modular shutdown plan and material requirement for instrumentation and control systems, plant expansion, modernization and installation/Commissioning of equipments Materials take-off as per hook-up drawings and generate reports for the materials required in the whole instrumentation section of the GC’s KOC Plant. Generates schedule of works to be done in Daily basis, forecast schedule in weekly basis, and generates daily activity reports, as well as weekly progress reports for the Instrumentation section of the GC’s KOC Plant.

Project lead supervisor in the construction, erection and implementation of approved C&I construction drawings for the Instrumentation and process controls of the GC’s KOC Plant. Involved in the quality inspection of erected field instruments and process control devices, recommends and correct process control loop so that efficient control system would be achieved and minimize equipment downtime. Involved in the calibration, pre-commissioning, and testing of field instrument and control system after erection had been completed, Involved in the documentation of as built drawings for the C & I of the whole GC’s Kuwait OIL Company.

company name AL-Suwaidi (sis)

Date from 29th jun.1999 to 1st oct.2004

Position Instrument Engineer

Project Aramco Riyadh Refinery,

Jeddah Refinery Aramco,Uthmaniya gas plant,(Project)Yanpet petrochemical, (Project)

Responsibilities

Check and supervise that the work is performed in compliance with the contract specifications, schedule and assess any deviations requested by the contractor before transmitting it to the Construction Site Manager, Anticipate and make sure that Contractor has at all the time the right set of execution drawings with the right changes/discrepancy, and with available materials on site prior to perform the works.

Manage and Control the construction, pre commissioning activities and work performed by the contractors in close relation with his contractor counterpart at supervision level and the Overhead Line Supervisor Interface with other Electrical, piping, instrumentation, Rotating equipment and QA/QC supervisors as required. Ensure that contractor HSE and quality practices are acceptable, that work permit procedure is closely followed, that proper and safe measures and procedures are being implemented by everyone concerned, and that all risks are evaluated and planned for by the contractor.

Company name Mecon (Doha Qatar)

Date from 27th may 1997 to 1st mar.99

Position Instrument Supervisor

Project L.N.G.Dukhan & Cafco Q.G.P.C. (Qatar)

Responsibilities

Responsible for Installation, Inspection, Testing, Loop Check, Functional Test and Pre-commissioning of Control System like Honeywell Experion DCS, FSC, FGS, BMS, ALMS, AIMS, DAHS, Invensys Triconex ESD, AB SLC 500/ Control logix PLC, Bentley Nevada 3500 VMS and Rolls Royce Compressors. Responsible for calibration, Installation of field Instrument and insuring the field instrument is according to P&ID. Carry out Site Acceptance Test, Loop test, Logic & Functional test with Service Engineer and the Subcontractor. Supporting the contractor for the preparation of loop package and providing all the necessary engineering document & drawings to ensure the loop folder is in compliance with the standards & procedure

COMPANY NAME DOPET (Doha Qatar) DATE from 22nd sep.1996 to 9th mar.1997

Position Instrument Supervisor

Project PS-2 & PS- 3 Offshore (Qatar)

Responsibilities

Ensure that all works are carried out as per the specifications/drawings and in accordance with the requirements and standards. Implement the project QA/QC plan and prepare & submit the necessary records for approval of client. Ensure that safe working methods/standards are practiced and maintained as per the site conditions and as per company’s HSE plan Scheduling the project, project cost monitoring and ensure that the progress of the work is in accordance with the project Plan/Program schedule and as per the estimated cost. Survey of the work progress in accordance with the contractual terms with client and obtain necessary approvals from client representative to prepare the progress or monthly invoices

COMPANY NAME Mecon (Doha Qatar)

DATE from 5th oct.1995 to 1st aug.1996

Position Instrument Supervisor

Project LNG Plant project Ras Laffan

Responsibilities

Instruments Pressure TX, Temperature TX, Level TX, Flow TX, MOV's, ESD&EDP Valves, Control Valves. Installation of Control panels, Power up of panels, completion of wiring, Loop checking and functional testing of all the loops .Installation of Cable ladders/trays, Impulse tubing and Air line tubing. Preparation of Instrument Index from P&ID 's. Preparation of F&G device Index from Location layout. Prepare Engineering packages for instruments, control valves, DCS, ESD etc. Prepare DCS/ESD I/O lists, Instrument lists, MTO etc. Prepare Construction documents like hook-up drawings, logic diagrams, cable schedules, instrument, JB & control room layouts, Instrument loop drawings, interconnection diagrams, interconnection schedules, DCS displays with DCS vendors (Honeywell)

COMPANY NAME L&T LIMITED DATE From 13th feb.1994 to 08aug.1995

Position Instrument Forman

Project ONGC offshore yard Gujarat (India)

Responsibilities

Lead team of Technicians, Inst Fitters and Foremen at site. My Responsibilities is to provide advice on applicable standard to the project team & contractor. Having hands-on experience with Installation and calibration of SMART field Instrumentation, F&G Detectors, Control Valves, ESD valves

PERSONAL DETAILS

Full Name : Mohammed Shahid Rahman

Father’s Name : M. Rahman wazul Haque Mallick’

Religion : Islam

Nationality : Indian

Marital Status : Married

Passport No. : Z-1725227

Date of issue : 02/04/2012

Date of Expiry : 01/04/2022

Place of issue : Patna

Date of birth : 15/08/1969

E-mail ID :

India Contact no. : +919931918870

Address in India At + Post Rais, Via- Pakari Barawan, Dist. Nawadah

State - Bihar Pin 805124 (India)

I Hereby Declare that all the above Details Furnished by Me are true to the Best of My Knowledge and belief,

Yours faithfully

Mohammed Shahid Rahman