RailCorp Engineering

Request for Review of RailCorpEngineering Standard

Engineering Standards have been published on the Internet to assist those undertaking engineering activities for or on behalf of RailCorp. RailCorp recognises that there may be a range of views within industry on the appropriate approach under different circumstances. RailCorp has a very large asset base to manage and needs to consider a range of factors when adopting or altering a standard. Factors in selecting particular standards include the performance of the equipment, its fit for the current asset base, training, logistics, installation and ongoing support, cost and safety.

In order to ensure the requests for review of engineering standards can be processed and managed RailCorp requires the requests and supporting information to be submitted in the standard format below.

The requests can be submitted via email to by mail to:

Engineering Standards and Configuration Unit

Chief Engineers Division

RailCorp
Locked Bag 25

Haymarket NSW 1238

RailCorp will notify the requestor within 2 weeks of receipt of a request, the plan of action for addressing the request.

1Requestor details

Name / Mobile / Telephone
Organisation
Position & level of Engineering Authority
Email address
Postal address
Your organisation’s interest in RailCorp engineering standards, e.g. supplier, designer, construction
Railways related projects your organisation have been undertaking or have an interest in
2Request details
Type of request (Please tick the appropriate box)
New proposal: Review of existing standard:
RailCorp engineering standard(If the request is for a review of an existing standard please detail here the relevant sections)
Description of proposal(Describe here in detail the proposed changes to existing standard or the scope of the new proposal)
Justification for proposal(Describe the deficiencies found on the existing standard or the reason for requesting of a new standard)
Supporting evidence (Describe the supporting evidence available for the justification of the proposal. Please submit all relevant information together with this form)
Is the standard in use elsewhere, either in Australia or overseas? (Provide details of the standard or a copy of the document.)
Other interested parties (Please nominate any other interested parties in this proposal)
3Supporting information
Details of supporting information (Please provide details of information submitted or location of information that supports the request)
No additional documents
Files attached to this emailNumber of additional files:
Information published on internet
List of web addresses:Date accessed
Other location
List reference documents:
4Checklist
Please check that the requested information has been provided.
1Name and organisation
Contact details
Interest details
2Request details
Supporting evidence and reasons
3Supporting information
Attachments to email
Other references
When checklist and information is complete, forward form and attachments to
5Administration
This section is for RailCorp use only
Registry No: / Date:
Registered by:
Acknowledged: / Date:
Referred to:
Actioned: / Date:

© RailCorpPage 1 of 3

Issued July 2011UNCONTROLLED WHEN PRINTEDTMA 410 FM 01 v2