Request for Changes to Property

Reserve At Thousand Oaks

Managed by

REPM Association Management

Request for changes to Property

Please e-mail this completed request to:

Reserve At Thousand Oaks

C/O REPM Association Management

11230 West Avenue Suite 2201

San Antonio, TX 78213

(210) 775-8234

– email address

Date: Owner’s Name:

Physical address of property:

Mailing address, if other than physical address:

Home Telephone: Work Telephone

E-mail address:

Who will do the improvement? ______

Briefly describe the improvement your propose: ______

______

Type of Improvement:

___Stain Fence (Color - Sample Required)

___Paint Exterior (Color - Sample Required)

___ Porch Railing

___ Play Structure (Height, Width and Length and Color of Tarp

___ Permanent Gazebo

___ Temporary Gazebo

___ Wall Art/Outside Décor

___ Sprinkler System (Show location of lines and heads on site plan)

___ Deck

___ Replace Roof (Sample/Warranty Year Required)

___ Gutters

___ Room Addition

___ Storage Building (Height, Width and Length and Colors)

___ Landscaping

___ Replace Door

___ Screen/Storm Door

___ Walkway/Sidewalk

___ Stain/Paint Driveway (Color - Sample Required)

___ Solar Screens/ Window Treatments

____ Patio/Patio Cover/Extend Patio – Rear of Home ONLY

____ Arbor/Trellis

Location of Improvement:

____ Front of dwelling ____ Back of dwelling ____ Side of dwelling

Materials to be used for the improvement:

___ Brick – Color ______

___ Wood – Type ______

___ Iron – Fence Color ______

___ Paint – Color (sample) ______

___ Hardi-Plank – Color ______

___ Siding (type/color) ______

___ Cement – Top Finish ______

___ Stucco – Color ______

___ Flagstone – Color ______

___ Stain – Color (sample) ______

___ Rock/Stone – Color ______

___ Other (explain) ______

Requirements exhibits and supporting documents are to accompany this application. (An application submitted without all the required information will be considered incomplete)

A) Time for Completion – Any dwelling or other structure or building, once commenced, shall be completed with reasonable diligence and, in all events, shall be completed as to its exterior within 6 months from the commencement of construction. No building materials of any kind shall be placed or stored upon any lot until the lot owner is ready to commence construction.

Attach to all applications:

1)  A drawing or representation (builder floorplan) of the structure including width, length and square footage along

2)  Copy of official site plan

SAMPLE ONLY

No construction shall begin until the following items have been completed:

1. All Property Owners Association dues are paid in full.

2. Written approval from the RTO Board of Directors to begin construction

I understand that the Committee will act on this request within the date specified by the association name above and contact me in writing regarding their decision. I agree not to begin construction/installation without written approval from the Committee. I understand all construction shall meet City/County code, and that Committee approval does not override City/County codes, but rather, is intended to work in conjunction with them.

______/______

Homeowners Signature Date

______/______

Estimated Start Date Estimated Completion Date

1 | Page