Reserve At Thousand Oaks
Managed by
REPM Association Management
Request for changes to Property
Please e-mail this completed request to:
Reserve At Thousand Oaks
C/O REPM Association Management
11230 West Avenue Suite 2201
San Antonio, TX 78213
(210) 775-8234
– email address
Date: Owner’s Name:
Physical address of property:
Mailing address, if other than physical address:
Home Telephone: Work Telephone
E-mail address:
Who will do the improvement? ______
Briefly describe the improvement your propose: ______
______
Type of Improvement:
___Stain Fence (Color - Sample Required)
___Paint Exterior (Color - Sample Required)
___ Porch Railing
___ Play Structure (Height, Width and Length and Color of Tarp
___ Permanent Gazebo
___ Temporary Gazebo
___ Wall Art/Outside Décor
___ Sprinkler System (Show location of lines and heads on site plan)
___ Deck
___ Replace Roof (Sample/Warranty Year Required)
___ Gutters
___ Room Addition
___ Storage Building (Height, Width and Length and Colors)
___ Landscaping
___ Replace Door
___ Screen/Storm Door
___ Walkway/Sidewalk
___ Stain/Paint Driveway (Color - Sample Required)
___ Solar Screens/ Window Treatments
____ Patio/Patio Cover/Extend Patio – Rear of Home ONLY
____ Arbor/Trellis
Location of Improvement:
____ Front of dwelling ____ Back of dwelling ____ Side of dwelling
Materials to be used for the improvement:
___ Brick – Color ______
___ Wood – Type ______
___ Iron – Fence Color ______
___ Paint – Color (sample) ______
___ Hardi-Plank – Color ______
___ Siding (type/color) ______
___ Cement – Top Finish ______
___ Stucco – Color ______
___ Flagstone – Color ______
___ Stain – Color (sample) ______
___ Rock/Stone – Color ______
___ Other (explain) ______
Requirements exhibits and supporting documents are to accompany this application. (An application submitted without all the required information will be considered incomplete)
A) Time for Completion – Any dwelling or other structure or building, once commenced, shall be completed with reasonable diligence and, in all events, shall be completed as to its exterior within 6 months from the commencement of construction. No building materials of any kind shall be placed or stored upon any lot until the lot owner is ready to commence construction.
Attach to all applications:
1) A drawing or representation (builder floorplan) of the structure including width, length and square footage along
2) Copy of official site plan
SAMPLE ONLY
No construction shall begin until the following items have been completed:
1. All Property Owners Association dues are paid in full.
2. Written approval from the RTO Board of Directors to begin construction
I understand that the Committee will act on this request within the date specified by the association name above and contact me in writing regarding their decision. I agree not to begin construction/installation without written approval from the Committee. I understand all construction shall meet City/County code, and that Committee approval does not override City/County codes, but rather, is intended to work in conjunction with them.
______/______
Homeowners Signature Date
______/______
Estimated Start Date Estimated Completion Date
1 | Page