R17 Soakaway, septic tank and sewage treatment units

R17 SOAKAWAY, SEPTIC TANK AND SEWAGE TREATMENT UNITS

To be read with Preliminaries/ General conditions.

PRODUCTS

R17/305 BELOW GROUND DRAINAGE SYSTEMS – PRODUCTS

- Products generally: As section R12.

R17/315 MODULAR PLASTICS SOAKAWAY UNITS

- Manufacturer: SEL, Stormer Hill Works, Tottington,

Bury, Lancashire, BL8 4AT, Telephone: 01204 885555, Fax: 01204 885533,

E-Mail: , Web: www.selel.co.uk

- Product reference: SEL HPSC System: High performance soakaway system that is intended to be installed at shallow depths.

Refer to Drawing numbers: 998(2-)04 CI & 998(90)06 CI

System To include the following:

·  SEL High Performance Soakaway Conduit (HPSC) Specification: Product Code: SELW13101

Material: Polypropylene core and polypropylene geotextile surround

Volumetric void: 92%

Effective perforated surface area: 59%

Short term compressive strength: 715 kN/m2

Nominal size: 2124 x 354 x 300mm deep

Weight: 18kg

·  Saddle connection to allow secure fixing of drainage pipework:

Product Code: SELW06502

·  315mm Ø Rainwater downpipe filter chamber: Product Code: SELW13202

·  500mm Ø dissipation chamber: Product Code: SELW05038

System to be fully designed and warrantied by manufacturer.

- Installation: All in accordance with manufacturers recommendations.

R17/335 PIPES, BENDS AND JUNCTIONS – CLAY PERFORATED

- Material and standard: Vitrified clay to BS EN 295-5, Kitemark certified.

R17/350 PIPES, BENDS AND JUNCTIONS – PVC-U – SOLID WALL PERFORATED

- Standard: To BS EN 1401-1 with flexible joints.

EXECUTION

R17/605 BELOW GROUND DRAINAGE SYSTEMS – EXECUTION

- Execution generally: As section R12.

R17/625 SOAKAWAYS – GRANULAR FILL

- Geotextile membrane: Line bottom and sides of pit.

- Jointing: Overlap 300 mm.

- Inspection and distributor pipes: Insert as required.

- Fill: Granular material – rubble.

- Height: Up to invert level of inlet pipe.

- Top of fill: Cover with geotextile membrane.

- Backfill: As-dug material.

- Access covers: Bed and haunch continuously in 1:3 cement:sand mortar.

R17/647 LAYING CABLE DUCTS

- Drawlines: Thread through during laying.

R17/650 BACKFILLING WITH AS-DUG MATERIAL

- Material: As excavated from the trench.

- Placing and compaction: Maximum 300 mm thick layers, up to finished ground level. Compact each layer before placing the next.

- Heavy compactors: Do not use before there is 600 mm of material over pipes.

COMPLETION

R17/910 COMMISSIONING OF SEWAGE TREATMENT UNITS

- Testing: Test the operation of all pumps, valves, controls, sensors and the like to verify correct operation, and make good if necessary.

- Hand over at completion:

- Manufacturers’ operating and maintenance instructions.

- Tools for operation, maintenance and cleaning, including keys for access covers.

Page 2 of 2