PROPOSED ODOR ELIMINATION SYSTEM FOR 260 RAILROAD HILL STREET, WATERBURY, CONNECTICUT

AiReactor, Inc. of Maspeth, New York, is to design,build,andinstallamultiplezonesystemtocontrolodorsanddustatthetransferstationlocatedat260RailroadHillStreet,Waterbury,CT.Themultiplezonesystemwillbedivided into3individualzones.Eachzonewillbeservicedbyahighwaterpressurepumpandmotor,vaporizingwater@l000 G.P.M.

Scopeofwork:

(Zone1)-An estimated 10,000sq.feetofthetransferstationwillreceivepaperandcorrugated.Thismaterialwilldevelopfinedustgeneratedbythehandlingandprocessing.Includedinthe10,000sq.feetsectionofthebuildingarethe(3)overhead20'Wx20'Hrollupdoorswhichrecyclingvehicleenterandexitfrom,Dustcontrolwillbeachievedbysecuring(2)100 footestimatednozzlesspanningthetippingfloorfromentranceoverheaddoorstoelevatedpickingline.Atotalof56 estimatednozzleassemblieswillbefittedonbothlinesalternatinginaleftrightpattern.Nozzleswillbeplaced4footoncenterformaximumcoverage.The(3)entranceoverheaddoorswillbefittedwitha"horseshoe"nozzlelinearoundtheframeofeachdoorvaporizingfromsidesandtop,totalof36nozzleassemblies.

(Zone2)-Theestimated20,525feetinteriorofthetransferstationwillbededicatedtoreceivingmunicipalsolidwasteandconstructiondemolition.Thisareawillrequireasystemcapableofcontrollingairborneodorsgeneratedbythereceivingandhandlingofmunicipalsolidwasteandairbornedustgeneratedbythereceivingandprocessingofconstructionanddemolitionmaterial.Sixnozzlelinessecuredtosixroofsteel"I"beamsupportswillspanthe entirereceivingandprocessingandhandlingofthemunicipalsolidwasteandconstructiondemolitionfromthefrontentranceoverheaddoortotherearwallofthebuilding.Estimated 125’feet,a totalestimated 150nozzleassembliesplaced5footoncenteralternatinginaleft/rightpatternwillbeinstalledformaximumeffectonbothodorsanddust.

(Zone3)- The(3)truckaccessoverheaddoorstothetippingfloorofthemunicipalsolidwaste andconstructiondemolitionareasandtheoverheaddoortothetrailerloadareawillbefittedwithnozzleassemblies.A"horseshoe"typenozzlelinewillbeplacedintheoverheaddoorframes,vaporizingfrombothsidesoftheoverheaddoorsandthetopcontrollingodorsanddustfromleavingthebuilding.

Allthreezoneswillbecontrolledbya wirelesshandheldtransmitter;eachzonecanbestarted andstoppedbysimplypressingabuttononthetransmitter(nobiggerthanakeychain ornament).Themaincontrolpanelwallmountedinthe"bunkerbuilding"willhaveamasteron/offswitchtoshutdownallthreezones.

The following is to be supplied by AiReactor, Inc.:

-(3) ZoneelectroniccontrolwallmountedpanelinNEMAEnclosureincludes:

•Masteron/offswitch

•HourMeter

•Pushbutton

•Lightedzonecontrolon/offswitchesforeach3 zones

•Cycletimeronall3zones

- (1)10GPMPumpandMotormodulemountedonaluminumdiamondplatebase,@220-230VAC,3phases@30amps.

-(1)4GPMPumpandMotormodule,mountedonaluminumdiamondplatebase

@220-230VAC,3Phase@20amps.

- (1)3GPMPumpandMotormodule,mountedonaluminumdiamondplatebase

@220-230VAC,3Phase

-Wirelesshandheld3zonetransmitterandreceiver.

- (9)WaterFilterBowls1O"Hx4"WSolidblueplastic.

- (9)WaterFilters,5,20,and30Micron

-Estimated1500'feetof"flextube",doublewalled

-Estimated1500' feetofcoatedAircraftcable.

-Estimated260SolidBrassNozzleTees.

-Estimated260SolidBrassNozzleBodies.

-Estimated26ffStainlesssteelnozzletipswithfilters.

-Estimated520Hydraulicfittingsets.

·- (3)36x30steeladjustablesuppo11tables

- (1)125 foot long plasticcurtain.Curtainwillbesuppliedin10'foot heightx12"Incheswide.The curtainwilldividethefiberreceivingandprocessingany areafromthemunicipalsolidwasteandconstructiondemolition.Thecurtainwillbeheldupbyagalvanizedsteelcable,estimated3/8-5/8inchdiameter.Theplastic1O'Hx12"Wplasticstripswillbeof aheavydutygauge.

-Allhardwaretofinishinstallation.

-4manteamofAiReactortechnicians.

The following is to be suppliedBy F&G, LLC:

-Electricpowersupply220-230V.A.C,3Phase,multipleampcircuitstobunkerbuildingwherepumpandmotorshoused.

-1” Waterlinew/ballvalveshut-offtobunkerbuilding,topumpsandmotors.

-40"Extensionboomwith2menplatform(gasoperated).

1