07873842920
Pravat Kumar Nayak, BE (Elect), Chartered Engineer, Energy Manager
----
JOB OBJECTIVE
Seeking a challenging career in spearheading Project Managementas well as facility management functions with an esteemed and leading organization in a dynamic environment that would help me cultivate and nurture my skills to the fullest with an opportunity to display my talent and become an asset to the organization.
KEY SKILLS
Responsible for managing multi-functional Engineering Activities including execution, coordination of MEP & HVAC system, Liasioning with state statutory authorities, Planning & Execution of services in IT park, Hospitals (AIIMS Cancer Hospital, New Delhi & Regional Hospital in Kandhar) residential, commercial and industrial projects. Well experienced in MEP projects, Infa & FacilityManagement, design verification. Ability to work under adverse circumstances, meet timeline and having an excellent team building spirit. Have rich experience in energy auditing, energy saving, Building management system(Automation) and safety management.
KEY RESULT AREAS
Experienced in Project management, Facility Management(Hospital & datacenter),Liasioning, vendor management andcost control and having analytical and problem-solving skills with proficiency inEquipments like:
Installation, testing commissioning of HVAC system Up to 800 TR capacity, complete distribution, piping network, AHU system, air washer system, split & window AC, FCU, Precision AC & HT/LT panel,DG sets,UPS,Transformers, BMS
Coordination with Lifts & escalators agencies for installation and testing & commissioning of the system.
Coordination with STP, WTP agencies for the smooth execution, testing & commissioning.
Water & Pumping network, Fire Fighting System, Steam Boiler, complete plumbing system, Rain water harvesting, and water body system.
Energy & Safety audit, DG set & AMF panel, Switchyard, Transformer, LT Power distribution, Circuit Breakers, Feeder & Bus bar, Surge protection, Earthing, UPS, SMPS, Battery Bank etc.
Project Management & Facility Management:
Vendor Finalization / Development, coordination with technical consultants and architect .Installation and commissioning of Utility Equipments and building services including lifts, STP, WTP, HT/LT installations, transformers, water pumps.
Project “resource optimization”, to identify and rationalized the surplus inventory,
Ability to manage outsource workforce and manage with in-house team, Verification of design and specs, detailing of specs, approval of drawings, Adherence to Safety compliance,
Proposal making, Estimation and forecasting,
Ensure removal of hurdles / obstructions and bottleneck for speedy work,
Delegation of work and progress monitoring.
Ensuring that work comply with contract documents including drawings and specifications
Ensure the project is completed in time, incase of delays same to be notified and valuation of cost associated with delays
Prepare progress and financial mgt report
WORK EXPERIENCE
Organization:-EFS Facilities services India Ltd (Infra & Facility Management Division)
Designation: - Chief Manager (Operation & Technical services)
Duration: - 1stSept’2015 to present
Nature of Job:-
Infra & Facility Management Site:- Nxtra Data centre, Infocity, Bhubaneswar, Odisha
BMS system management :-Automation of Building operation with Integration of CCTV, FDA, HVAC equipment, Electrical equipment, Access control system, DCS & VESDA system,FM-200 system.
Electrical system management: -
33 KV switch yard, 33/433V HT installation, Transformer (33KV/433V, 3MVA)-03 nos, 2000KVA DG-5 nos,PLC panel, DG synchronization panel,HT panel,LTpanel,MCC panel,bustrunking,Lighting,earthing,cabling.
UPS (500 KVA, 120 KVA), Capacitor panel, FDA system.BMS system, PA system, networking system,
Data Centre Management: - Project management & Facility management of 360 Racks Data centre.
HVAC:-Air cooled Screw chillers,110Tr:-03 220TR-07nos, AHUs, PAHU,
Vendor Management & Liasioning, Audit compliance:-
Vendor management for facility & utility operation ,service deliverables as per Service level agreement and Effective liasioning with statutory Deptts.like Electricity board, State Development authority,Municipal corporation, FireDeptt, pollution control board,explosive Deptt100% audit compliance i.e.physical safety & security audit,physical Asset audit,Business continuity management system audit , statutory audit & energy audit.
Responsible for making Data centre energy efficient and adherence to zero breakdown.Managing DC Operations with team of 35 sub-ordinates, OPEX & CAPEX management also meeting the internal customer’s service level satisfaction. Initiated opex saving availing TOD incentives from CESU in Electricity bill, Energy auditing for system and saving of Rs.2mn per annum.
WORK EXPERIENCE
Organization:-ICICI Bank(Infra & Facility Management Division)
Designation: - Zonal infra and facility Head
Duration: - 18th Dec’2013 to 25th Aug’2015
Nature of Job:-
Heading the responsibility of project works execution in megabranches/ commercial complexes, Data center,adherence to quality, cost optimization, designed to energy optimizationwith efficient project management. Also responsible for managing Infra facility maintenance for over 200 branchesacrosszone and 45000 sqft area Data centre.
Data center Utility & Operation Management:-
Heading MEP project execution & Operation, Maintenance & facility management (45000 sqft area) of company owned Data center in Hyderabad.
Operation management of BMS system, Electrical system 11/.433KV substation, 2.5MVA transformers, 2000KVA DGsets, 500KVA UPS, HVAC system:-300Tr chillers, AHU,STP system, WTP system, Firefighting system & also energy saving management.
Responsible for making Data centre & Commercial complexes energy efficient and adherence to zero breakdown.Managing Infra issues with, team of 10 managers, adherence to legal obligations, statutory compliance, OPEX & CAPEX management premisesoptimization and vendor management & also meeting the internal customer’s service level satisfaction.
Achievements: -Achieved PUE of 1.7 in Data centre with effective energy management and also achieved the targeted nos of opening of commercial complexes/branches across the zone adhering to budget, energy efficiency, time line and statutory compliant.
Achieved the Energy saving of Rs.6.5mn, zero breakdown in 90% of branches, opening of 35 new branches, nil senior management escalation, nil legal & rental escalation, 10000 sqft of premises optimisation and rental negotiation saving of Rs.1.5mn.
M/s Honeywell Automation Ltd.
Duration: - Wef Sept’2010 to Dec’2013
Position: - Chief Manager (Infra & Facility operation)
Nature of Job:-
Infra &Facility Management Site: -Bharti airtel Data centre, Bharti House, Bhubaneswar, Odisha
BMS system management :-Automation of Building operation with Integration of CCTV, FDA, HVAC equipment, Electrical equipment, Access control system, DCS & VESDA system.
Electrical system management: -
33 KV switch yard, 33/433V HT installation, Transformer (33KV/433V, 3MVA)-03 nos, 2000KVA DG-5 nos,PLC panel, DG synchronization panel,HT panel,LTpanel,MCC panel,bustrunking,Lighting,earthing,cabling.
UPS (500 KVA, 120 KVA), Capacitor panel, FDA system.BMS system, PAsystem, networking system,
Data Centre Management: - Project management & Facility management of 260 Racks Data centre.
Mechanical & plumbing system : -
HVAC:-Air cooled Screw chillers, 220TR-05nos, AHUs, PAHU,
Fire fighting: -Hydrant system, sprinkler system,
Lift: -passenger lift, Service lift
Plumbing: -Water Treatment Plant and treated supply water networking system
STP:- STP plant and recycling of treated water supply
Vendor Management & Liasioning, Audit compliance:-
Vendor management for facility & utility operation ,service deliverables as per Service level agreement and Effective liasioning with statutory Deptts.like Electricity board, State Development authority,Muncipal corporation, FireDeptt, pollution control board,explosive Deptt100% audit compliancei.e.physical safety & security audit,physical Asset audit,Business continuity management system audit, statutory audit & energy audit.
Achievements:-Time bound completion of project adherence to quality & safety,Efficient infra and facility management with Implementation of Energy saving activities and savings of Rs.1.20Cr PA, Liasioning with Electricity board for reduction of MD within shortest time period, Implementaion of RTGS payment of Electricity bill with saving 1% on monthly bill. Maintaining Uptime for EB supply with effective liasioning with EB.Received appreciation for CAPEX saving and effective liasioning with EB from Client Bharti Airtel and Received Bravo star award from M/s Honeywell for excellent service and capex saving at Bharti house site.Also received appreciation from client as well as M/s Honeywell for maintaining the Data centre smooth operation uptime 100%during cyclone”Phailin”.
M/s Sterling & Wilson ltd.
(A Group of Shapoorji Pallonji Group)
Duration: -Wef sept’2008 to sept’2010
Position: - Project Manager
Nature of Job & Projects:- Project management,Vendor liasioning,Liasioning with Statutory authorities.
IT/Cyber park project (SP infocity,20 lakh sqft,Gurgaon):-
Installation, testing and commissioning of 11KV substation, Transformer (7x2100KVA), HT panel, Bus trunking/Rising main LT panel, PLC panel, HT/LT cabling, PCC/MCC panel,DG sets(3x2000KVA),Internal/external Electrification & lighting , Chemical earthing,FDA system, Data cabling,Ligtning protection.BMS.
I/T/C of centrifugal chiller (2x800TR), ducting, AHU, FCU, Piping works, Pumps. Starterpanel, coolingtower, fresh air fans, exhaust fans.
I/T/C of Jockey pump, hydrantpump, hydrantsystem, sprinklersystem, control cabling, panels.sweragesystem, plumbing system.
Pharmaceutical plant (Client- Baxter Intl, Gurgaon):-
I/T/C of 11 KV transformers, HT/LT panel, HT/LT cabling, 1x750 KVA DG set, PCC/MCC panel, Internal and external electrification & lighting, Race way.BMS
66/11 KV substation/switch yard (Client: - HSIIDC)
I/T/C of 2x 20MVA,66 KV transformer,11 KV,250 KVA station transformer ,ht/lt,control panel.sf6cb,switch yard eqpts, including erection of towr, gantries, cabling and overhead wiring.
Responsibility:-
a) Project management of time bound project independently within budget.
b) Coordination management with Contractors, Architects/consultants, Project construction team and Client
c) Giving feedback about project progression to top mgmt and tracking progress in comparison with base line schedule & Sub contract negotiation.
d) Co-ordination with Civic bodies, statutory dept.for obtaining NOC,
e) Co-ordination at backend regarding design, accounts and billing
f) Preparing QC plan, supervising quality control procedures and Engineers
M/s Contrack International Inc.Arlington, Afghanistan
Duration:-.December-2006 to August’2008
Position:- Assistant Manager(QC/Production)
Nature of job & Projects:-
Residential Quarters project (3.5 mn sqft, client:-Afghan national Army):-
Internal and external electrification, HT, LT cabling, conduiting, earthing, Installation, testing and commissioning of Substations, transformers 11KV transformer,DG Power plant(10MW), HT, LT panels, MCC,PCC panel.,Window ACs
ANA Bulk fuel depot (Kabul Air port): -
Internal and external electrification, HT, LT cabling, conduiting, earthing, Installation, testing and commissioning of 11 KV (Pad mounted) transformer, DG set, HT/ LT panels, MCC, PCC panel, control cabling for fuel pumps.
RegionalHospital (MegaHospital)
Internal and external electrification, lighting, lightning protection, HT, LT cabling, conduiting, earthing, Installation, testing and commissioning of 11KV transformer, DG set, HT, LT panels, MCC, PCC panel, FDA system, Nurses call system, BMS,Telephone system, PA system,Central chiller, AHU, ducting works. Sprinkler system, hydrant system,
Responsibility:-
1). Total execution of project, independent responsibility, Site supervision.
2). Preparing QC plan, conducting preparatory meeting, progress meeting with client and responsible for preparing submittals and getting approvals, inspection of materials, Inspection of working procedures (initial, follow up, final), checking daily progress report of QC engineers& finally handing over of project to client adhering to best quality standard
4) Give feedback about project progression, interaction with Contractors, Architects, Project Management Team, Clients, Labourers and Supervisors
5). Handling labour on site, implementation of Manpower plans, Taking feedback from site engineers, Local procurement, Material management: Store & Inventory mgmt
6) Co-ordination at backend regarding design, accounts and billing
Achievements:-Successfully handled all above mentioned projects and completed in time adhering to quality standard. Got appreciation from Core of USA army Engr. Saved around $1, 00,000/ for Company suggesting using single core cable in place of three core cables.
M/s ITC Limited (IBD Division)
Duration: -Wef March’2005 to Nov-2006
Position: -Sr.Electrical Engineer (Assistant Manager, Level-5)
Nature of job & Projects:-Project Management, Vendormanagement, Liasioning with State statutory authorities.
- Multi storey Commercial building, shopping malls and residential complex at Mhow, Sehore,Vidisha MP
- Multi storey Commercial building, shopping malls at Hathras, UP
a)Independently responsible from conceptual, designing stage to execution of projects in all sorts of electrical works like installation of Generators, Transformers 11KV,HT, LT panel, MCC, cabling, internal and external electrification, Lighting, lightning protection, earthing, FDA system, CCTV system,PA system,Data cabling,Fresh air AHU,ducting, piping, sprinkler system,hydrant system, plumbing work
b)Responsible for time bound completion of project ensuring quality, safety standard strictly followed at site, Contracting, negotiation, Liasioning with state Electricity Deptt. for availing power supply and with DRDA,MP , coordination with contractor and consultant, Billing, Preparing progress report and daily reporting to H.O,
Achievements: -Successfully handled and completed all above projects independently and got increment twice in a year.
M/s Simplex Infrastructure Ltd
Duration: -Wef Jan’98 to March’2005
Position: -Sr Engineer.
Nature of job & Projects: -
AIIMSCancerHospital:-
- Installation, testing and commissioning of Transformer, Substation 11KV,Generator (750KVAx2 nos), HT/LT panels, AMF cum synchronized panel, motor control centre, internal and external electrification work, lighting, lightning protection, bus trunking and cabling, earthing
- Installation and commissioning of both analogue and addressable type Fire detection system, dish antenna system, EPABX (Tata telecom), Public addressing system. Nurses call system
- I/T/C of Central chiller, VAM m/c, HSD tank, AHUs, FCUs, pumps, ducting, piping and fire fighting works (sprinkler and hydrant system)
- Coordination with client, contractor, consultant, Liasioning with Electricity board, Pollution board, Explosive deptt. Daily progress reporting to Project manager, anticipate contingencies at site and make effective co-ordination and mobilization of man and materials so as to complete Project as per schedule without waste of material and time. Responsible for Client and contractor billing, Inspection of materials at Factory with client. To ensure execution of works as per effective cost control IS standard and safety and client Satisfaction.
DMRC Project, Dwarka: -
- Installation, testing and commissioning of 250 KVA Transformer, Generator HT/LT panels, Motor control centre, internal and external electrification work, lighting, lightning protection, bus trunking and LT cabling, earthing wire ways, raceways, and data cabling.
RBIBuilding, Lucknow: -
- Installation, testing and commissioning of Transformer 11KV,Generator (500KVAx2 nos), HT/LT panels, Motor control centre, internal and external electrification work, lighting, lightning protection, bus trunking and cabling, earthing
- Installation and commissioning of both analogue and addressable type Fire detection system, dish antenna system, EPABX (Tata telecom), Public addressing system. Data cabling
- Responsible for time bound completion of project ensuring quality, safety standard strictly followed at site, Contracting, negotiation, Liasioning, coordination with contractor and consultant, Billing, Preparing progress report and daily reporting to H.O,
Achievements: Successfully completed all above projects with in time frame independently and our organization that was initially into other infra projects was awarded several high-rise commercial and residential building projects after we completed AIIMS project and RBI building successfully.
Personal details
Date of Birth : 15.01.1974
Marital Status : Married
Educational Qualification :Passed Matriculation in first Division (85%)
Passed Intermediate (Science) in first division with (82%)
Passed Graduation in Electrical Engineering in first division (1993-97) from IGIT, Sarang (Govt Engg college under BPUT university,Odisha)
Certificate course in PLC from Indo-Danish Vocational institute, Okhla and Automation training from M/s Prolific limited PLC (Allen bradely, Siemens), drive (Altivar), Instrumentation, SCADA(touch ware),DCS
Energy management from Bureau of Energy Efficiency from power ministry, Govt.of India
Address : Royal Garden, House no;-82,Patia, Chandrasekharpur
Odisha
Language Proficiency : English, Hindi,Odiya
Place:- Bhubaneswar
Date:- Pravat Kumar Nayak