GM88 22 / SVQ in Roofing (Construction) atSCQF level 5
To attain the qualification candidates must complete 5-10units in total. This comprises:
5-10mandatory units depending on chosen pathway
2 optional units

Please note the table below shows the SSC identification codes listed alongside the corresponding SQA unitcodes. It is important that the SQA unitcodes are used in all your recording documentation and when your results are communicated to SQA.

Mandatory units: Candidates must complete all units from this group
SQA code / SSCcode / Title / SCQF level / SCQF credits
HL7R 04 / COSVR641v2 / Conform to General Workplace Health, Safety and Welfare / 6 / 12
HL7T 04 / COSVR642v1 / Conform to Productive Work Practices / 5 / 5
HM15 04 / COSVR643v1 / Move, Handle or Store Resources / 5 / 5

PLUS ONE OF THE FOLLOWING ROUTES

Route 1: Roof Tiler Option Route(Total of 7 units required)
HM25 04 / COSVR272v2 / Install Underlay, Battens and Roofing Components / 5 / 11
HM22 04 / COSVR273v2 / Install Pre-formed Weathering Flashings to Roofs / 5 / 10
HM24 04 / COSVR274v2 / Install Single-lap Roof Tiles to a Variable Gauge / 5 / 13
HM21 04 / COSVR275v2 / Install Plain Tile Roof Coverings / 5 / 17
Route 2: Roof SlaterOption Route(Total of 6 units required)
HM25 04 / COSVR272v2 / Install Underlay, Battens and Roofing Components / 5 / 11
HM22 04 / COSVR273v2 / Install Pre-formed Weathering Flashings to Roofs / 5 / 10
HM23 04 / COSVR276v2 / Install Regular Sized Natural Roof Slate to Standard Roof Details / 5 / 25
Route 3: Roof Slater and Tiler Option Route(Total of 8 units required)
HM25 04 / COSVR272v2 / Install Underlay, Battens and Roofing Components / 5 / 11
HM22 04 / COSVR273v2 / Install Pre-formed Weathering Flashings to Roofs / 5 / 10
HM24 04 / COSVR274v2 / Install Single-lap Roof Tiles to a Variable Gauge / 5 / 13
HM21 04 / COSVR275v2 / Install Plain Tile Roof Coverings / 5 / 17
HM23 04 / COSVR276v2 / Install Regular Sized Natural Roof Slate to Standard Roof Details / 5 / 25
Route 4: Heritage Roof Tiler Option Route(Total of 9 units required)
HM25 04 / COSVR272v2 / Install Underlay, Battens and Roofing Components / 5 / 11
HM22 04 / COSVR273v2 / Install Pre-formed Weathering Flashings to Roofs / 5 / 10
HM24 04 / COSVR274v2 / Install Single-lap Roof Tiles to a Variable Gauge / 5 / 13
HM21 04 / COSVR275v2 / Install Plain Tile Roof Coverings / 5 / 17
HM2C 04 / COSVR501v2 / Replace Heritage Roof Coverings / 6 / 27
HM2A 04 / COSVR502v2 / Repair and Maintain Heritage Roof Coverings / 6 / 26
Route 5: Heritage Roof Slater Option Route(Total of 8 units required)
HM25 04 / COSVR272v2 / Install Underlay, Battens and Roofing Components / 5 / 11
HM22 04 / COSVR273v2 / Install Pre-formed Weathering Flashings to Roofs / 5 / 10
HM23 04 / COSVR276v2 / Install Regular Sized Natural Roof Slate to Standard Roof Details / 5 / 25
HM2C 04 / COSVR501v2 / Replace Heritage Roof Coverings / 6 / 27
HM2A 04 / COSVR502v2 / Repair and Maintain Heritage Roof Coverings / 6 / 26
Route 6: Heritage Roof Slater and Roof Tiler Option Route(Total of 10 units required)
HM25 04 / COSVR272v2 / Install Underlay, Battens and Roofing Components / 5 / 11
HM22 04 / COSVR273v2 / Install Pre-formed Weathering Flashings to Roofs / 5 / 10
HM24 04 / COSVR274v2 / Install Single-lap Roof Tiles to a Variable Gauge / 5 / 13
HM21 04 / COSVR275v2 / Install Plain Tile Roof Coverings / 5 / 17
HM23 04 / COSVR276v2 / Install Regular Sized Natural Roof Slate to Standard Roof Details / 5 / 25
HM2C 04 / COSVR501v2 / Replace Heritage Roof Coverings / 6 / 27
HM2A 04 / COSVR502v2 / Repair and Maintain Heritage Roof Coverings / 6 / 26
Route 7: Fully Supported Lead and Hard Metal Roofing and Cladding (Total of 5 units required)
HM20 04 / COSVR327v2 / Install Fully Supported Lead and Hard Metal Roofing, Cladding and Weatherings / 5 / 28
HM29 04 / COSVR328v2 / Repair and Maintain Fully Supported Lead and Hard Metal Roofing, Cladding and Weatherings / 5 / 15
Route 8: Heritage Fully Supported Lead and Hard Metal Roofing and Cladding (Total of 7 units required)
HM20 04 / COSVR327v2 / Install Fully Supported Lead and Hard Metal Roofing, Cladding and Weatherings / 5 / 28
HM29 04 / COSVR328v2 / Repair and Maintain Fully Supported Lead and Hard Metal Roofing, Cladding and Weatherings / 5 / 15
HM26 04 / COSVR687v2 / Prepare and Install Fully Supported Lead and Hard Metal Decorative Roofing and Cladding / 6 / 30
Route 9: Thatching Option Route (Total of 7 units required)
HM27 04 / COSVR116v2 / Prepare Roof Structures for Thatching / 5 / 18
HM28 04 / COSVR117v2 / Prepare Thatching Materials / 5 / 16
HM2D 04 / COSVR118v2 / Thatch Structures / 5 / 38
HL80 04 / COSVR250v2 / Erect and Dismantle Access/Working Platforms / 5 / 11
Route 10: Solar Collector Roofer Option Route (Total of 6 units required)
HL5C 04 / COSVR47v2 / Maintain Slate and Tile Roofing / 5 / 14
HL4F 04 / COSVR298v2 / Install Solar Collectors to Roofs / 5 / 6

Plus one of the following option groups

Group A: Access - 1 unit from this the following
HL80 04 / COSVR250v2 / Erect and Dismantle Access/Working Platforms / 5 / 11
HL56 04 / COSVR252v2 / Utilise Provision of Fall Protection Systems / 5 / 17
Group B Protection/Handover - 1 unit from this the following
HL8D 04 / COSVR360v4 / Install, Maintain and Remove Work Area Protection and Safety Equipment / 5 / 10
HM1Y 04 / COSVR524v2 / Clear Site and Hand Over on Completion / 5 / 12

GM88 22 SVQ in Roofing (Construction) at SCQF level 51