Meraux Refinery Support – Organizational Development and Safety Systems
P.O. #

October 4, 2011 – Planning Outline

Connection to Valero Procedures:

Main --- http://inside.valero.com/irj/portal

Procedures link: http://inside.valero.com/irj/servlet/prt/portal/prtroot/docs/guid/d0fdb5e9-23b5-2c10-4ba1-a1ebc399f045

Safety and Security Projects
# / þ / Description / Comment
1 / q / Finalize Work Permitting -- ?? Remaining – changes??
2 / Hydrogen Sulfide
·  Meraux Outline / ·  Valero H2S Policy PDF
·  Valero H2S Word.doc
·  MER Gen033-0408 H2S Reduction Flare Headers
·  V Work Exposure Assessment\IH WEA.pdf
3 / Hot Tap – Integration with Hot Work Permitting
·  / ·  MER Safety\HotTap
4 / Crane Procedures
·  MER Critical Lift.docx
·  MER NEW SSP MOUSA Mobile Crane / ·  CTEMS 2 2 1 - Crane Standard - 8 24 2011.pdf
·  CTEMS_2.2.1_Crane_Standard_-_Super_Lifts
· 
5 / Emergency Response Plan
·  Fire Plans – Hydrocracker
·  Fire Plans – Benzene Reduction
·  Fire Plans – FCC
·  Integrate Fire plans for Units and Tanks into overall Plan
·  H2S plan Integration / ·  MER Safety\Fire Drawings
6 / Confined Space Entry Procedures
· 
·  MER SSP0015 Confined Space entry kbs.docx
·  MER SSP-0015 Confined Space Entry.pptx
·  / ·  V Confined Space Entry Permiting Standard 11082010.pdf
·  V Inert Entry.pdf
·  V RS-03_Inert_Entry[1].pdf
· 
7 / Permit Audits
8 / Miscellaneous Procedures
·  MER SSP-0006-0911Excavation Permit.docx
·  MER ssp-0011 Personal Protective Equipment.doc
·  MER Safety\JSA
·  MER Safety\Visitors
Business Improvement Teams
# / þ / Description / Comment
1 / Schedule October (17th??)
2 / Identify area of Focus and Participants – Core Team
3 / Clarify Core Team Going forward
4 / IOPT for Mark Stobel – Team?
5
6
7
8
Additional Support
# / þ / Description / Comment
1 / October CAP – Interaction Process?
2
3
4
5
6
7
8

Plant Area Summary – Fire plan checklist for Units

Area 1 – Out of Service / In Progress / % / Area 4 / In Progress / %
1.  #1 FCC (F) / 1.  #2 Fcc
2.  #1 Gas Con (G) / 2.  #2 Gas Con
3.  Area 1 Offsite (Y) / 3.  #2 Alky
4.  Chiller (gas Liquids)
5.  LPG Merox
6.  Area 4 offsite
7.  Alky Prep
8.  C3/C4 Splitter
Area 2 / In Progress / % / Area 5 / In Progress / %
1.  Crude (CR) / ·  #1 Amine
2.  Vacuum (VU) / ·  #2 Amine
3.  NHT / ·  DNT
4.  Reformer / ·  ULSD HT
5.  Platform/Regenerator / ·  #2 Sulfur
6.  Rose / ·  #2 Talk Gas
7.  Area 2 offsite / ·  #3 Sulfur
·  #3 Tail Gas
·  Sour Water Stripper
·  #2 Sour Water Stripper
·  Area 5 Offsite
Area 3 / In Progress / % / Area 6 / In Progress / %
1.  Tank farm / Hydrocracker (HC)
2.  Docks / New Boilers (B)
3.  Wastewater treater / PSA Skid (PS)
4.  Lpg truck rack / Oily Water Stripper (OW)
5.  Offsite utilities / Kero Treating (Q)
6.  Safety / Boilers (B)
7.  Asphaltene handling / Area 6 Offsite (Y)
Console
Page 1 of 3