PETROLEUM ENGINEER

First name: zoubir

Family name: souici

Passportnumber:6619857Expires on June 29, 2012

E-mail:

Address: Cité 1850 logts villa 1212

30500Hassi-Messaoud, W.Ouargla, ALGERIA.

Mob:+ 213(0) 661391483or +213 (0) 559 395 675

Objectives:

·  To become a Professional and expert in Development field and exploitation of the oil reservoir.

·  To devote all my scientific capabilities and my knowledge at the service of the company.

·  Make an international and professional career.

Education:

1997 (12 years): General certificate of education (mathematics)Hassi-Messaoud Algeria

2003 (05 years): PetroleumDrilling engineer (University of Boumerdes) Boumerdes Algeria

Professional experience:
Date / Company / Job done
July 27, 2011 up to now
Night Tool-Pusher / Weatherford Drilling
international (Algeria)
Supervision:
International drilling
Integrated services IDIS
Weatherford (Algeria)
Operator :
SONATRCH DF Hassi-
Messaoud (Algeria) / Drilling rig WDI 814 : Drilling & completion operations Hassi-Berkine Area (Algeria)
·  * Varco top drive
·  * Cyber chair ( NOV amphion control)
· 
August, 30 2009 to
July 26 2011:
Night Tool-Pusher / Weatherford Drilling international (Algeria)
Supervision: Integrated drilling services IDSWeatherford (Algeria)
Operator :
SONATRCH DP Hassi-Messaoud (Algeria) / I done the following operations on work Over Rig WDI 804 withCanrig 1035-AC- 500top drive & Rig 805 with Kelly, Rig IDM Telescopic Cantilever joystick break
Rig move: general rigging down, rig down top drive or Kelly, lower derrick, scope in derrick, lower sub-structure, spotting sub-base with well centre, raise sub-structure & dog-house, scope out derrick and pin, raise derrick, rig up top drive or Kelly, level mast to center the stand of DC with rotary table, drill mouse hole and rat hole, supervise general rigging up, Slip & cut drilling line 1 3/8”, Spooling in new 1 3/8" drilling line on hoisting system.
Operations: doing killing the well, change well head( N/D X-Mass-Tree, N/Up THS Adaptor spool, master valve) set BPV and Two way BPV, retrieve completion ( release anchor seal ,retrieve hanger, milling and retrieve packers( Halliburton and Baker packers) ,cut tubing with chemical cutter using RCT( Radial Cutting Torch ), cleaning ,breaching and scratching 7” casing and liner , cementing job, cure week formations with cement plug, logging operations( GR, METT, USIT, Neutron, Density, Resistivity, Caliper), milling liner, wash over operations, set whipstock,set RBP Packer, casing test (FIT ,SBT, Leak off test) drilling sections with OBD( vertical and horizontal sections), and UBD method( crude oil with nitrogen ,drill pipe and annular injection) short radius and medium radius, drill wells with complete losses, use Rhino reamer to enlarge hole from 6” to 7” ,Run & cemented 5 ½” expandable open hole liner, Run & cemented casing and liner ( perforated ,slotted, blinked) run completions with accurate space out, test BOP’s, DST, flow test and build up pressure test , fishing wire line , casing patch, internal and external tubular cut ,cased hole and open hole fishing, retrieve junk, coring 6”hole, Drill 3 ¾” slim hole, etc….
Papers work: calculate the ton-mile, doing daily operations, attachment journal, IDAC daily drilling reports, PTW, SOP, TRA, pre tour meeting, pump hors, drill collar tracking, relive the driller,….etc
January 2009 to July 2009
Junior Rig Manager in Parker Drilling Company (Algeria)
2008 – 2009:
Driller in Parker Drilling Company (Algeria) / Parker Drilling Company (Algeria)
Supervision: Backer (Algeria)
Operator :
SONATRCH DF Hassi-Messaoud (Algeria) 30500 / I done the following operations on drilling rigs Rig 264, Rig 265 with VARCO top drive Rig 2000 HP joystick break
Rig move: general rigging down, rig down top drive , Rig up releasing line lower derricksub-structure with drilling line on drawworks, Lay down derrick, floor, rotary table, doghouse & substructures, spotting sub-base with well centre, Rig up floor, rotary table, doghouse, derrick,reeving drilling line between crown block & travelling block, Raise derrick & floor, Rig up top drive, level mast to center the stand of DC with rotary table, supervise general rigging up, Slip & cut drilling line 1 3/8”, Spooling in new 1 3/8" drilling line on hoisting system.
Operations:doing starting drilling well from 36” (Bit) hole running 30” casing & cementing, Drill 26” (Bit) hole running 18 5/8” casing cementing with stinger& welder baseplate on tub guide, Drill 16” (Bit) hole running 13 3/8” casing nipple up casing head spool, Drill 12 ¼” (Bit) hole running 9 5/8”casing nipple up casing head spool, Drill 8 3/8” (Bit) hole running 7” liner, Pressure test BOPs, Slip & cut drilling line, Core 6” running 4 ¼ liner mill landing collar, float collar & shoe, Perforate 4 ¼” liner,….etc
Papers work: calculate the ton-mile, doing daily operations, attachment journal, IDAC daily drilling reports ,PTW, JSA, pre tour meeting, pump hors, drill collar tracking, relive the driller,….etc
2006 – 2008:
Driller in Sonatrach (ENTP Hassi-MessaoudAlgeria) / National business to workwell (ENTP) (SONATRACH) Hassi-Messaoud Algeria
Operator: DP SONATRACH Hassi-MessaoudAlgeria 30500 / Work Over Rigs TP 196 TP 197 (under balance drilling UBD & OBD) with Kelly: Rig National oil well 1500HP, mud pump 1000hp, rotary table 750HP, derrick Telescopic normal break
Operations: doing killing the well, change well head( N/D X-Mass-Tree, N/Up THS Adaptor spool, master valve) set BPV and Two way BPV, retrieve completion ( release anchor seal ,retrieve hanger, milling and retrieve packers( Halliburton and Baker packers) ,cut tubing with chemical cutter using RCT( Radial Cutting Torch ), cleaning ,breaching and scratching 7” casing and liner , cementing job, cure week formations with cement plug, logging operations( GR, METT, USIT, Neutron, Density, Resistivity, Caliper), milling liner, wash over operations, set RBP Packer, drilling sections with OBD( vertical and horizontal sections), and UBD method( crude oil with nitrogen ,drill pipe and annular injection) short radius and medium radius, drill wells with complete losses , Run & cemented casing and liner ( perforated ,slotted, blinked) run completions with accurate space out, test BOP’s, DST, flow test and build up pressure test, casing patch, internal and external tubular cut ,cased hole and open hole fishing, retrieve junk,
Papers work: IDAC daily drilling reports, PTW,
2005 – 2006:
Assistant Driller in Sonatrach (ENTP Hassi-MessaoudAlgeria)
2004 – 2005: Engineer trainee in Sonatrach (ENTP Hassi-Messaoud Algeria) / Operator: DP SONATRACH Hassi-Messaoud Algeria 30500 / Work Over& drilling rigs TP137 TP 197
I passed in well site from floor-mane, derrick man, assistant driller and driller trainee
2003: Four months graduation training in DF Sonatrach Hassi-Messaoud (Algeria) / 04 month practical training course at the national company of work to wells

CertificatesTraining Courses:

·  Valid IWCF certificate (Supervisor level) Expires date26/01/2012(Red Med)

·  IWCF certificate (Supervisor level) 2008 (Red Med)

·  IWCF certificate (Driller level) 2006 (NAFTOGAZ)

·  Training in first helps with (NAFTOGAZ)

·  Training in HSE level 2(NAFTOGAZ)

·  Hazard Recognition (ENTP)

·  Banksmanslinger Training (Weatherford)

·  Manual Handling(Weatherford)

·  Permit to Work for Supervisor(Weatherford)

·  Gas Testing Certificate(Weatherford)

·  Safe start 1 day 18/11/2009 in Dubai (Weatherford)

·  Rig pass 4 days from 19/11/2009 to 22/11/2009 in Dubai(Weatherford)

·  Safety leadership course(Weatherford)

·  CAP-WDI 7-Hydraulics(Weatherford)

·  CAP-WDI 9 Cementations(Weatherford)

·  CAP-WDI 10- Differential Sticking(Weatherford)

·  CAP-WDI11-Drilling Line & Ton Miles(Weatherford)

·  Mobile elevated working platformcertificates (Genie Boom)(Weatherford)

·  Forklift/ Loader operationscertificates(Weatherford)

Other skills:

·  Computer literate:Manage Software:Ms-Word, Ms-EXEL,Ms-Outlook, Ms-PowerPoint, Adobe Illustrator,

·  Languages:Arabic (Mother Tongue), English French,

·  Drive license category B

Personal details:

·  Date and place of birth: 04-11-1978 in EL-OUED

·  Nationality: Algerian.

·  Gender:Male.

·  Marital status: Married

Interests:

·  Arts: literature, cinema and music

·  Sports: Soccer and swimming

·  Other: Travelling.