Permit Application #2002.3Fireworks Permit – Manufacture, Storage, Transport
submit by hand, mail, fax, or e-mail to: o be completed by the Permit Applicant (type in the grey box or print out and complete)
Business Information
Date: / Federal Tax ID:Business Name: / UBI:
Address: / Street: / City: / State: / Zip:
Site Address: / (if different from above)
Contact Name:
Phone: / () / Alternate Phone/Cell: ( )
E-mail Address:
City of Tacoma
Business License:
Comments:
Please include a check made payable to the CITY OF TACOMA TREASURER, or request an invoice.
Check this box to have applicant invoiced for the permit fee.FPB OFFICIAL USE ONLY
Approved By: / Date:Denied: / Reason for Denial:
Site Inspection: / Approved: Corrective Measures: 1. 2.
Permit Number:
Permit Fees: / Date Received: / Receipt Number: / Check Number:
See attached documentation for description of conditions that must be met prior to the issuance of this permit.
- Fireworks -
PERMIT CONDITIONS #2002.3Fireworks Permit – Manufacture, Storage, Transport
All of the following conditions must be met prior to the issuance of a permit.
1. Time Lines
- Permit must be obtained prior to commencement of construction, or not less than 180 days prior to intended date of moving fireworks into an existing building
2. Regulatory References
a. Tacoma Municipal Code 3.12.030
b. InternationalBuilding Code
c. International Fire Code Chapter 33
d. NFPA 1124 Manufacture, Transportation, Storage, and Retail Sales of Fireworks and Pyrotechnic Articles
e. 49 CFR part 171 & 397.9b
3. Required Submittals
a. Tacoma Fire Department permit application
b. City of Tacoma business license (enter on application)
Manufacturing or Storage
a.Fireworks Manufacture, Storage or Transportation Information Sheet
b.Follow requirements for submission of Building Permit for new construction or Change of Occupancy
c.Emergency and Evacuation Plans in accordance with International Fire Code, Section 404
Transportation
a.Fireworks Manufacture, Storage or Transportation Information Sheet
b.Turn by turn directions for the intended route
c.Legible map of route
d.List of products to be transported
4. Inspection Requirements
a.Construction of a new building must be completed and all inspections final prior to moving fireworks into the building
b.Storage in an existing building requires a Building Permit for change of occupancy from current use to H-1 for Division 1.3G fireworks, or to H-3 for Division 1.4G fireworks if building does not currently meet those requirements
c.Construction pursuant to a change of occupancy shall be completed and all inspections final prior to moving fireworks into the building
5. Requirements
a.Manufacture or store in accordance with IFC Chapter 33 and NFPA 1124
b.Transport in accordance with NFPA 1124
Fireworks Manufacture, Storage or
Transportation Information Sheet
Transport Company: ______
Address:______
City:______State:______Zip Code______
Phone: ______Fax: ______
Transport Beginning Point:
Address: ______
City: ______State:______Zip Code______
Transport Ending Point:
Address: ______
City: ______State:______Zip Code______
Storage location address: ______
Phone______Fax______