NOTE: SC Chairs are to use this form to covey action item/resource requests to the CSOEM on priority standards – routine subcommittee activity should be included as annex.

Date: January 22, 2016

Subcommittee:SC10

Membership:174SC10 full roster listing

On Roster which is a change Up or Down of:??

Last Regular Meeting Date:January 19 - 21, 2016

Location:Austin, Texas

Agenda Items:

WG on API RP 10F Conversion – G. Benge

TG on Cooperative Testing / TG on API Monogram Program / – B. Ulrich

WG on Compressive Strength – G. De Bruijn

Rewrite of Bulletin E3 – J. Reid

WG on Comparison of Conditioning Practices for Cements – L. Padilla

WG on API Spec 10D Revision – J. Hebert

TG on Performance Testing Well Cementing Composites – H. Plack

WG on HTHP Rheology – R. Lukay

WG on Foamed Cement – E. Cunningham

WG on Evaluation of NAF Removal and Water Wetting Spacers –P. Sonnier

WG on Triaxial Mechanical Properties of Cement – A. Bois

WG on Well Abandonment – J. Shine

Rewrite of 10TR1 – G. De Bruijn

SC10 General Meeting - D. Williams

API Citation for Service

- Eric Cunningham

API RP 10B-4 – Preparation and Testing of Foamed Cement Formulations at Atmospheric Pressure, 2nd Edition, October 2015

- Dan Mueller

API RP 10B-3 – Testing of Well Cements Used in Deepwater Well Construction, 2nd Edition, January 2016

- Hank Rodgers

API TR 10TR6 – Evaluation and Testing of Mechanical Cement Wiper Plugs, 1st Edition, July 2015

Major Concerns:

Document Status:

Publication of API Specification 10A “Cements and Materials for Well Cementing” 24th Edition, December 2010

- Document reaffirmed in December 2015

- Auditor findings and comments are being logged, reviewed and discussed. “Special Work Session” on Thursday, January 21st, 2016

Publication of API RP 10B-2 “Testing Well Cements”

- Publication of RP 10B-2, 2nd Edition April 2013. Comments are being logged, reviewed and discussed with set path forward after “Special Work Session” on Thursday, January 21st, 2016

- Future revisions to include: Stirred Fluid Loss Testing, Fluid Loss Screens and elimination of inconsistencies between API Spec 10A and RP 10B-2

- New WG was formed to revise/rewrite Sections 10, 11 & 12, specifically with regards to atmospheric vs HTHP slurry conditioning requirements.

Publication of API RP 10B-3 “Testing of Well Cements used in Deepwater Well Construction” 2nd Edition, January 2016

Publication of API RP 10B-4 “Preparation and Testing of Foamed Cement Formulations at Atmospheric Pressure”, 2nd Edition, October 2015

- Technical Report (TR) on Foam Cement Behavior under Well Conditions is the second phase of this WG charge. Work progressing.

API RP 10B-5, 1st Edition, “Determination of Shrinkage and Expansion of Well Cement Formulations at Atmospheric Pressure”, April 2005

- Document reaffirmed in April 2015.

API RP 10B-6, 1st Edition, “Determining the Static Gel Strength of Cement Formulations”, August 2010

- Document reaffirmed in April 2015. Document revision is underway by Work Group.

Rewrite of API Spec 10D, 6th Edition March 2002 “Bow Spring Casing Centralizers”

- Document reaffirmed April 2015. Review and update API Spec 10D to include performance testing requirements for centralizers that are to be used in applications where they are run through restrictions that are smaller than the hole size in which they are to be set.

API RP 10D-2, 1st Edition, “Recommended Practice for Centralizer Placement and Stop Collar Testing”, August 2004

- Document reaffirmed in April 2015.

Rewrite of API RP 10F, 3rd Edition April 2002 “Performance Testing of Cementing Float Equipment”

- Document reaffirmed in April 2015.

- WG will publish API Specification 10F, 4th Edition which will replace and make obsolete API RP 10F, 3rd Edition. This document will include required specifications and the associated performance testing protocols for the manufacturing of Cement Float Equipment.

- Document was balloted and is currently in comment resolution.

Published Technical Report 10TR6, “Evaluation and Testing of Mechanical Cement Wiper Plugs”, 1st Edition, July 2015

10TR7 on “Mechanical Behavior of Cement”

- Document has been balloted. Ballot results and comments have been resolved and forwarded for recirculation.

API RP 65, 1st Edition, “Cementing Shallow Water Flow Zones in Deepwater Wells”, September 2002

- Reaffirmed 2012, currently being revised by Work Group. Expected publishing date Q1, 2016 as API RP 65-1.

API Standard 65-2, 2nd Edition, “Isolating Potential Flow Zones During Well Construction”, December 2010

- Reaffirmation was expected in December 2015.

API Bulletin E3, 1st Edition, Environmental Guidance Document: “Well Abandonment and Inactive Well Practices for U.S. Exploration and Production Operations”, January 1993

- Reaffirmed 2000, the document will be revised and used as the basis for the newly formed Work Group on Well Abandonment.

SC Officer Succession Plan:

Chair Deryck Williams - Chevron

Vice Chair Erick Cunningham - BP

Items for ECS Action:

1)SC10 contract request from 2015 - Bernard Fraboulet for Master Editing Services is executed

2)SC10 contract request from 2015 - Princeton/API negotiating terms and is not yet executed

Submitted by: Deryck Williams

Subcommittee Chairman