sezgin özbilgin
Nationality: Turkish; DOB: 02.06.1983
Country of Residence: Turkey
GSM Oman : +968 965 347 17
GSM Turkey : +90 532 457 28 27
e-mail:
Dear Sir/Madam,
I would like to present my resume for your vacancies regarding project controls/ planning/ scheduling or cost positions.
Regarding project controls, having;
- Bachelor’s degree in Civil Engineering
- Masters degree in Transportation Engineering
- PMI credential certificates for Contract Management Time Management
- Official membership of AACE
- 7 years project control experience in complex Building (High Rise Building, Shopping Mall,5 Star Hotel) and Infrastructure Projects(Roads,Utilities,Dam,STP,Golf Course)
- Considerable Budget Preparation and Earned Value Analysis experience for performance measurement and calculating EV, ATD, ETC, EAC, BAC, VAC on Project Budgets
- Ability to work with remeasurable, lump sum or guaranteed maximum price contract documents
- Deep understanding of FIDIC standard contract conditions (especially Red Book)
- Well rounded experience in all aspects of project controls including planning, scheduling, and performance measurement with utilization of both critical path/chain and earned value analysis’
- Extreme proficiency at the best project planning software available - Primavera Project Planner (Expert level)
has given me an in-depth understanding of the various project control techniques on different type of construction projects.
Regarding claims,
- Having considerable experience on preparetion of direct cost impact claims related to several reasons such as variation orders, changes in law etc.
- Being involved in successful preparation of Detailed Time Extension Claims on a project valued approximately 2 Billion US Dollars from Contractor's end
- Possessing detailed experience of reviewing EoT claims with assistance ofproject facts,contract conditions and recommended practices by S.C.L (Delay and Disruption Protocol) and AACE (Forensic Schedule Analysis)
- Being expert on carrying out Time Impact Analysis with detailed narrative on effect of the delay events (including evaluation of all the associated prolongation costs and unabsorbed overheads)
has given me a sense of seeking fair and reasonable approach while evaluating/preparingclaims.
I kindly request for an interview for your better evaluation,
Kind Regards,
Sezgin Ozbilgin
PROFESSIONAL EXPERIENCE
Aug 2011 -Ongoing ACE,Project Controls Manager
Working as project controls manager in core management team of four seperate large infrastructure network contracts with a construction budget of 300,000,000 USD. Projects are located in the most congested areas of Muscat/OMAN and partially being carried out by micro tunneling methods as well as rehabilitation of existing network.(pipe diameters vary from 100mm-2000mm)
- Supervision of time schedule submittal reviews (Primavera P6)
- Supervision of reviewing and verifying time schedule updates
- Supervision of delay analysis for EoT Claims (Event justification/Critical Path Analysis/Earned Value Analysis)
- Preparetion and monitoring of annual budgets
- Supervision of cost control for the client
- Integration of change orders to original BOQ and Time Schedule(Cost&Time)
- Analysis and evaluation of claims (Cost&Time Impact)
- Preparetion of claim settlement options
- Supervision of entire reporting system(physical progress,financial progress,quality,HSE,customer care)
- Development of productivity improvement methods on site
Oct 2010 -Aug 2011 ACE,Senior Planning Engineer
Worked as senior planning engineer in core management team of four seperate large infrastructure network contracts with a construction budget of 300,000,000 USD. Projects are located in the most congested areas of Muscat/OMAN and partially being carried out by micro tunneling methods as well as rehabilitation of existing network.(pipe diameters vary from 100mm-2000mm)
- Review of time schedule submittals for approval(Primavera P6)
- Review and verification oftime schedule updates
- Analysis of delay events for EoT Claims (Event justification/Critical Path Analysis/Earned Value Analysis)
- Analysisof available resources according to the time schedule
- Analysis of submitted claims (Time Impact Study)
- Preparetion of weekly and monthly progress reports
- Preparetion of productivity reports (Earned Value Anlaysis)
- Tender evaluation
Dec 2008 -Oct 2010 ENKA, Planning&Scheduling Engineer
Worked as a (master) planning&scheduling engineer in a large scale urban development project titled Blue City Project/Oman. Blue City is a 2 billion USD project which consists of 4,000 apartments, 1,000 villas, 3 five star hotels, 18 holes golf course, sewage treatment plant and all related road, infrastructure and landscaping requirements on 35 sqkm area.
- Preparetion and updating time schedules (Primavera P6-80,000 activities)
- Preparetion of claims (cost & time impact study)
- Preparetion ofdetailed weekly and monthly progress reports (Internal & external)
- Quantity surveying for variations
- Preparetion of productivity & efficiency reports (Earned Value Anlaysis)
- Preparetion and updating cash flow charts
May 2008 - Dec 2008 Sistem Yapi,PlanningCost Control Engineer
Worked as planning & cost control engineer in Extension and Rehabilitation of the Sewerage Network Monitoring of the Water Distribution Network of SIBIU/ROMANIA (FIDIC Red Book)-(70 km,13 million euro)
- Preparetionand updating Time Schedule (MS Project)
- Preparetion of IPCs & Subcontractor IPCs
- Daily construction planning
- Preparetion of internal & external monthly ,weekly and daily progress and budget reports
- Preparetion ofsubcontract for the suppliers & subcontractors
- Preparetion of productivity & efficiency reports (Earned Value Analysis)
- Preparetion and updating cash flow charts
- Preparetion of claims (including expense & time impact study)
- Preparetion of necessary drawings to define some elements or locations of the project (for site crews)
- Procurement (including all phases)
Sep 2007-May 2008 Yapı Merkezi, Project Controls Engineer
Worked as project controls engineer in 212 Istanbul Shopping Mall Project (225000 sqm-65 million euro)
- Supervision of mobilization installations (temporary facilities) on site
- Preparetion and updating Time Schedule (Primavera P3)
- Submission of IPCs & Subcontractor IPCs
- Issuing internal & external monthly ,weekly and daily progress and budget reports
- Preparetion of subcontracts for the suppliers & subcontractors
- Preparetion and updating cash flow charts
- Collection of data from site for reporting
- Tracking productivity on site
- Supervision ofconstruction activities on site
- Procurement (including all phases)
Mar 2007-Sep 2007 Samko Engineering, Site Engineer
Worked as site engineer in askyscraper project named “Diamond of Istanbul” in Istanbul valued at 300 million USD.
- Preparetion of Time Schedule which is not on CPM basis,
- Supervision of installation of steel structure on site
- Preparetion of work progress reports
- Coordination of transportation&logistics
October 2002-September 2006 BLUECHIP-Event Management, Part-time position as a Supervisor
Worked on many projects, including international conference organizations, high level VIP groups, vendor meetings, product launches, training meetings and many more similar projects of reputable turkish companies such as Eczacibasi, Dogus, Sabanci, Turkcell, Yapi&Kredi Bank, Toyota, ATV, Show Tv, İddia, ,Betek, etc…
July 2005 – September 2005 Ross Store Distribution Center Merchandise Processor(U.S.A, Pennsylvania)
Worked as merchandise processor in a distribution center of a big textile company which has 4 billion USD revenue and 659 stores throughout the U.S.A.
- Classificitaion of the products on the computer system subject to encoding process
EDUCATION
2006 –2010 Istanbul Technical University, Transportation Engineering MSc.(3.75/4)
2001 – 2006 Istanbul Technical University, Civil Engineering BSc.(2.33/4)
1994 – 2001 Ankara Gazi Anadolu High School.(4.81/5)
LINGUISTIC SKILLS
English (Advanced level)
French (Elemantary level)
COMPUTER SKILLS
Proficient at MS Office, Autocad, Primavera P3, Primavera P6 , MS Project
Good at SAP2000, Netcad,Xsteel
PROJECTS & SEMINARS
June 2006 - Graduation Projectof BSc.– Shrinkage Reducing Admixtures
June 2009 - Graduation Thesis of MSc.- Airport Pavement Design
Attended in many workshops which were ruled by Fazıl Oral, Ufuk Koç, Ege Cansen for leadership, marketing, brand management skills
Attended in many technical seminars within İstanbul Technical University
I.T.U, Engineering Preparation Club, Autocad Course
I.T.U, Engineering Preparation Club, SAP2000 Course
CERTIFICATES
I.T.U Project Management Centre ….Time Planning and Primavera in Project Management
I.T.U Project Management Centre …Basic Principles in Contract Management and International FIDIC Contracts
Kurumsal Iletisim Consultancy...... Project Management with MS Project
Yapı Merkezi…...... ISO9001:2000 Quality Management System
INTERESTS
Travelling, Cars
REFERENCES
Ackey Chrysovulous-ACE, General Manager
Baranalp Rasim Ozgen-ENKA, Project Controls Manager
Baran UNDER-SISTEM YAPI,Planning Coordinator
Rifat DEDEOGLU-YAPI MERKEZI, Technical Office Manager
Semih VAROGLU-SAMKO , Project Manager
Prof. Dr. Abdullah HilmiLav, I.T.U, Thesis Advisor
( All the references are whom i directly reported during my tenure,contact details can be provided upon request )