Multi-target Sputterer – Instructions for use
- Changing targets (as needed)
 - Bring load lock and main chamber up to atmospheric pressure
 - Close valve to mechanical pump (must be done whenever coupling the two chambers to prevent oil from being sucked into cryopump)
 - Open isolation valve (turbo pump must be at 100% to do this)
 - Turn off turbo pump (must be off to vent chamber)
 - Open hand-operated N2 valve (behind load lock) to bring chambers up to atmosphere (computer regulated so you can’t break anything)
 - Raise main chamber lid using lift. Pivot to one side
 - Remove shield, collar #1 and collar #2 – note the height setting on second collar
 - Replace target and reassemble in reverse order
 
- Loading sample
 - Ensure isolation valve is closed, turbo is off, and valve to mech. pump is closed.
 - Open N2 valve to bring load lock to atmospheric pressure while preserving vacuum in main chamber
 - Load sample tray (so sample is at the bottom, face-down).
 - Align mark with shiny spot on loading fork
 - Push on right side of tray and make sure it doesn’t bind on the fork
 - Close N2 valve and close lid to load lock
 - Pump load lock down to equalize pressure with main chamber
 - Turn on and open valve to mechanical pump.
 - Turn on turbo pump and allow rpm to come up to 100%
 - Close valve to mechanical pump
 - Alternate – if chambers were both at ATM, isolation valve should be open during pumping process so both chambers are pumped down
 
- Move sample tray into main chamber
 - Ensure sample table is set at red line for loading, valve to mech pump is closed.
 - Open isolation valve and SMOOTHLY crank arm into the chamber
 - Once fully extended, raise table to blue line with top crank.
 - SMOOTHLY crank arm out of chamber and close isolation valve.
 - Continue raising table until ~2mm from top.
 
- Deposition
 - Ensure sample is raised to the top of the worm gear atop the chamber.
 - Open valve on Argon tank (against window)
 - Set Argon flow rates in computer (7sccm for Cr)
 - Turn on flow (three buttons, bottom-to-top, use #4)
 - Hit THRough setting on Cryopump and use CAP MAN to monitor Ar flow rate).
 - Turn on appropriate target gun (targets are on magnetized tags and, from top-to-bottom, are #4, #1, #2, #3).
 - Open viewing glass to ensure plasma is being generated
 - Open shutter for desired period of time
 - Close shutter
 - Turn off gun
 - Hit ‘open’ on the Cryopump
 - Turn off Ar flow (three buttons, top-to-bottom)
 - On ‘vacuum’ page, turn off the CAP MAN, which monitors Ar flow rate
 
