APPENDIX “A”

CITY OF RED BUD, ILLINOIS

SEWER INSPECTION REPORT

(SECTION 38-2-28(A))

Property Owner

Address

Address of Property Checked

Occupants Name

The sewer lateral installation at the above address has been checked by me and at the time of the inspection did ( ) did not ( ) comply with the rules and ordinances of the City of Red Bud, IL for the above-named system.

Check Date , 20 Recheck Date , 20

OK ( ) Reject ( )

Employee

Remarks

SEWER INSPECTION CHECKLIST

1. Tee, wye or riser provided in public sewer for tap Yes No N/A

2. Saddle installed per manufacturer specifications Yes No N/A

3. Schedule 40 PVC pipe used Yes No

4. Pipe on firm surface to have full pipe bearing Yes No

5. Backfill to top of pipe with aggregate 7/8” or less Yes No

6. Pipe laid at minimum 1% grade Yes No

7. All fittings factory produced & designed for sewer use Yes No

8. Maximum deflection does not exceed 40 degrees

at any 1 fitting Yes No

9. Clean-out(s) installed Yes No N/A

10. Paved surfaces, curbing, sidewalks repaired Yes No N/A

If any of the above is checked “no”, please explain reason to approve or disapprove.


APPENDIX “B”

CITY OF RED BUD, ILLINOIS

APPLICATION FOR CONNECTION TO PUBLIC WATER SYSTEM

(SECTION 38-3-1 OF CITY CODE)

Approximate Date of Installation

No.

Date

, hereby makes application for permission to connect with the City Public Water System of Red Bud, Illinois, at the following described property:

Address Phone

Subdivision or Location Lot No.

and remits a connection fee of $ , the receipt of which is hereby acknowledged.

Class 1 Water Connection Charge: Class 2 Water Connection Charge:

(A) ¾” Service Connection $600.00 (A) ¾” Service Connection $1600.00

(B) 1” Service Connection $900.00 (B) 1” Service Connection $1900.00

(C) 1 ½” Service Connection $4000.00 (C) 1 ½” Service Connection $5000.00

(D) 2” Service Connection $4500.00 (D) 2” Service Connection $5500.00

The service connection fee for water customers that require a larger service connection shall be determined by the Superintendent per ordinance.

1. Type of building to be served

2. Service is for New , replace existing , addition to , building?

3. Permit to dig in street (if necessary) has been obtained

4. Size of water service line and meter requested

5. Approximate date inspection desired

As an inducement for the City of Red Bud to accept this application, the applicant:

1. Agrees to pay for all water used on said premises at the rates provided by the ordinances of the City.

2. Agrees to abide by all applicable ordinances, rules and regulations of the City, all of which are available at City Hall.

3. Hereby grants an easement over said premises in favor of the City of Red Bud, IL for the purpose of, repairing, replacing meters and reading same.

4. J.U.L.I.E. (1-800-892-0123) shall be contacted to determine location of existing service lines (utility, telephone and cable) BEFORE excavating commences.

5. Applicant must furnish pipe from connection to meter, do all excavating and trenching, assume responsibility for all existing underground utilities, backfill all trenches located in streets or roadway with Grade 8 stone.

6. All rules and regulations as found in “Standard Specifications for Water and Sewer Main Construction in Illinois” AND “The State of Illinois Department of Public Health Illinois Plumbing Code” as amended shall be followed.

APPLICANT UNDERSTANDS AND AGREES THAT UPON CONNECTION TO THE PUBLIC WATER SYSTEM, THIS APPLICATION AND ALL OF ITS TERMS AND CONDITIONS CONSTITUTE A CONTRACT BY AND BETWEEN THE APPLICANT AND THE CITY OF RED BUD.

APPLICANT /OWNER

Dated:

City of Red Bud

(Ord. No. 1295; 02-04-13)


APPENDIX “C”

CITY OF RED BUD, ILLINOIS

APPLICATION AND PERMIT FOR PRIVATE SEWAGE DISPOSAL SYSTEM

(SECTION 38-4-4 OF CITY CODE)

, hereby makes application for permission to construct a private sewage disposal system (“System”) at the following described property.

Address Phone No.

Subdivision Lot No.

1. Type of building to be served

2. System – New , replace existing , addition to

3. Nearest public sewer: feet

4. A fee of $50.00 is submitted with this application.

5. Approximate date Inspection desired

The undersigned agrees to comply with all rules and regulations, deposits, Zoning and Sewer Ordinances of the City of Red Bud, if application is accepted, and further understands that:

1. J.U.L.I.E. (1-800-892-0123) shall be contacted to determine location of existing service lines (utility, telephone and cable) BEFORE excavating commences.

2. Applicant shall do all excavating and trenching, assume responsibility of all existing underground utilities and backfill all trenches.

The above provisions are hereby accepted this day of , .

Permit Issued: ,

Signature of Applicant

Superintendent of Utilities


APPENDIX “D”

CITY OF RED BUD, ILLINOIS

APPLICATION AND PERMIT FOR SEWER CONNECTION

(SECTION 38-4-4, 38-4-5 AND 38-4-6 OF CITY CODE)

, hereby makes application for permission to connect with the City Sanitary Sewer System of Red Bud, Illinois, at the following described property.

Address Phone No.

Subdivision Lot No.

Payment of $ is acknowledged by City.

Type of Connection Requested: ( ) Class 325; ( ) Class 625; ( ) Class 1500;

( ) Class 325 – Mobile Home Park; No. of Lots x $325.00=

1. Type of building to be served

2. Service is for New , replace existing , addition to building?

3. Type of construction: Slab Basement Other

4. Will there be a basement drain , Backflow preventor , grease trap

5. Permit to dig in street (if necessary) has been obtained

6. City’s “Connection Fee” has been paid – ( ) Yes; ( ) No. Amount $

7. Name, address and telephone number of plumber performing work

8. Approximate date inspection desired

The undersigned agrees to comply with all rules and regulations, deposits, Zoning and Sewer Ordinances of the City of Red Bud, if application is accepted, and further understands that:

1. It shall be unlawful to run or allow to run any surface water, downspouts, seeptile, window wells, water accumulation from construction or basements and new lateral sewers into the sanitary sewer system.

2. J.U.L.I.E. (1-800-892-0123) shall be contacted to determine location of existing service lines (utility, telephone and cable) BEFORE excavating commences.

3. No taps shall be made into the City Sewer System except by a licensed plumber or City certified personnel.

4. All sewer pipe shall be no less than four (4) inches in diameter and shall be PVC Schedule 40, solvent cement joint can be used for pipe and fitting. All rules and regulations as found in “Standard Specifications for Water and Sewer Main Construction in Illinois” and “The State of Illinois Department of Public Health Illinois Plumbing Code” shall be followed.

5. Before any backfill is placed, the Utility Department must be notified and a Sewer Inspection performed.

6. All trenches in streets and alleys must be backfilled with aggregate 7/8ths inch or less in size. Sidewalks and cubs shall be restored by the undersigned at the undersigned’s cost, to original or better condition.

7. All discharge into the sewer system will be controlled by Federal and State Environmental Protection Agency regulations and City Ordinances and anyone violating these laws will be subject to a fine, disconnection or both.

The above provisions are hereby accepted this day of , .

Permit Issues:

Signature of Applicant – Owner

City of Red Bud

By:


APPENDIX “E”

CITY OF RED BUD, ILLINOIS

APPLICATION FOR ELECTRIC SERVICE

Approximate Date of Installation

No.

Date

NAME

ADDRESS

SUBDIVISION LOT #

Phone #

Hereby applies for a connection with the Electric System of the City of Red Bud, IL and remits a connection fee of

$ the receipt of which is hereby acknowledged.

Fee – Standard 120/240-Volt Single-Phase 3 Wire Service:

200 AMP OH Tap $1,100.00

200 AMP URD Tap $1,100.00

300 AMP URD Tap $1,700.00

300 AMP OH Tap $1,700.00

400 AMP OH Tap $2,200.00

400 AMP URD Tap/URD Service Area $2,200.00

400 AMP URD Tap/OH Service Area $2,200.00

Installation of 100 AMP meter base and breaker $1,300.00

Installation of 200 AMP meter base and breaker $1,300.00

Temporary service 120/240V 3-wire $ 50.00

Non-standard service – description

Request to upgrade electric service – To be billed at the City’s cost plus 10% on materials.

It is understood that there will be no additional charge for the installation of the service line wire (up to 100 feet, $3.00 per foot over 100 feet—Rev. Code 38-2-31). HOWEVER, applicant will furnish all wiring, installed to meet the latest standards of the National Electric Code (NEC NFPA 70) and the National Electric Safety Code (NISC ANSI C2) and requires all applicants for electric service to conform to these codes (a copy of this being on file in the City Utility Office). Contact the City Utility Department for additional installation requirements.

As an inducement for the City of Red Bud to accept this application, the applicant:

1. Agrees to pay for all electric used on said premises at the rates provided by the ordinances of the City.

2. Agrees to abide by all applicable ordinances, rules and regulations of the City, all of which are available at City Hall.

3. Hereby grants an easement over said premises in favor of the City of Red Bud, IL for the purpose of laying, maintaining, metering, repairing and replacing the electric line servicing the premises or the adjoining premises per drawing thereof on the reverse side of this application.

4. Specifications and meter socket shall be obtained from the Utility Department.

APPLICANT UNDERSTANDS AND AGREES THAT UPON INSTALLATION OF THE SERVICE BY THE CITY, THIS APPLICATION AND ALL OF ITS TERMS AND CONDITIONS CONSTITUTE A CONTRACT BY AND BETWEEN THE APPLICANT AND THE CITY OF RED BUD.

( ) Central Air APPLICANT OWNER

( ) Cooking

( ) Water Heating Receipt of $ Connection fee acknowledged

( ) Electric Heat

( ) Heat Pump By:

(Ord. No. 1295; 02-04-13)
OVERHEAD SERVICE

100 AMP OR 200 AMP – 1/0 – 3 WIRE – RESIDENTIAL

1. A permit must be obtained for any service, new or upgraded. Applications may be obtained at City Hall, 200 E. Market St., Red Bud, IL 62278.

2. Socket is furnished by the City and may be obtained at the Utility Office, 525 Power St., Red Bud, IL 62278. To be installed by customer.

3. Conduit size to be 2” galvanized for 200 amp service, and 1 ¼” for 100 amp services. 1 ¼” conduit may not be used above the roof. Aluminum conduit can be used above ground only, but not above roof as part of mast. Neither can a coupling be installed in conduit above as a part of the mast.

4. Conduit extending through roof must have take-off insulator for attaching service wire.

5. Grounding bushings are required in meter socket and distribution panel.

6. Neutral wire may be one size smaller and must be continuous from entrance to panel.

7. Ground rod to be driven in undisturbed soil at least 6” below grade, and left open for inspection. Elbow to be run past overdig into undisturbed soil.

8. Ground wire to be protected with conduit or suitable guard.

9. Inquire at Utility Office as to location of meters and other information concerning installations not mentioned here.

WIRE SIZES

With no more than 3 conductors in raceway or conduit.

100 AMP Service 200 AMP Service

Aluminum – 2 ground wire size Aluminum – 4/0 ground wire size

Copper – 3 #6 bare copper Copper – 3/0 #4 bare copper

Ground Rod Size Ground Rod Size

5/8” x 8’ copperclad 5/8” x 8’ copperclad


UNDERGROUND SERVICE

100 AMP OR 200 AMP – SINGLE PHASE – 3 WIRE – RESIDENTIAL

1. A permit must be obtained for any service, (new or upgraded). Applications may be obtained at City Hall, 200 E. Market St., Red Bud, IL 62278.

2. Socket is furnished by the City and may be obtained at the Utility Office, 525 Power St., Red Bud, IL 62278. This socket is to be installed by customer.

3. Conduit size to be two (2) inch galvanized or PVC for 100 or 200 amp services. Aluminum conduit can be used above ground only. Conduits shall be supported with hangers. This also is to be installed by the customer.

4. Grounding bushings are required in meter socket and distribution panel.

5. Ground rod to be driven in undisturbed soil at least six (6) inches below grade and left open for inspection.

6. Ground wire to be protected with conduit or suitable guard.

7. Inquire at Utility Office as to location of meters and other information.

WIRE SIZES

With no more than 3 conductors in raceway or conduit.

100 AMP Service 200 AMP Service

Aluminum – #2 Aluminum – 4/0

Copper – #3 Copper – 3/0

Ground Wire - #6 bare copper Ground Wire - #4 bare copper

Ground Rod Size - 5/8” x 8’ copperclad Ground Rod Size - 5/8” x 8’ copperclad


APPENDIX “F”