General Information: Bids generally take 30-60 days to process from bid opening to contract completion. You may check status on the pages linked in the menu below; however, the status listed at any given time is not "live" data, rather an update. (Please refer to the statement near the bottom of the page: "Page was last updated ----".) Once contract processing is completed, you may obtain information on construction progress from either the project manager (found in the table on each project's page), or from the construction manager in the Field Engineering Section at 513-244-1366.

Bid Results for Contracts
10350015 McKinney Road Local Sewer (HNs 9455-9473)
10180465FD, 2009 Trenchless Technology Manhole Full Depth Rehabilitation Project
10700000B, Contract B, 2009 Closed Circuit Televising and Sonar Inspection of Large Diameter Sewers
10700000A, Contract A, 2009 Closed Circuit Televising and Sonar Inspection of Large Diameter Sewers
10180465C, 2009 Trenchless Technology Manhole Chimney Rehabilitation Project
10270013&10270070_R, Little Miami WWTP Primary & Secondary Tank Rechaining & Little Miami WWTP Primary & Secondary Rotating Trough & Gates Re-Bid
10170081 Montgomery Road and Lester Road Sewer Replacement
10270050 Charlemar Drive Sewer Replacement (Re-Bid)
10370010, 6887-6932 Kenwood Road Local Assessment Sewer
10330010, Sidney Road Local Sewer (House Nos. 5584 & 5588)
10240160 I-75 Sewer Relocation
10270050 Charlemar Driver Sewer Replacement
10280110, Obsolete Lift Station Conversions to Pump Stations-Homelawn Estates, Ponderosa Woods, White Oak Terrace
10340030 Woodburn Avenue Sewer Replacement
10131004, East Branch Muddy Creek CSO Relocations/Eliminations—Demolition of House at 4402 River Road
10270013, Little Miami WWTP Primary & Secondary Tank Rechaining and 10270070, Little Miami WWTP Primary & Secondary Rotating Trough & Gates Replacement
10240300 SSO 568 and 569 Improvements
10180100, 2009 Trenchless Technology Sewers Rehabilitation
10120420 Diamond Oaks, Regency Ridge, and Windmere 3rd Pump Station Eliminations
10240123_R Kemper Lane Sewer Repair
10240215 York Street and Central Avenue Sewer Replacement
10260020, Hartfield Place Sewer Replacement
10230110 Hengehold 2nd Pump Station Elimination
10270014, Oaklawn Drive Sewer Replacement
10141540&10141560, Winton 1 & 2 and Sherwood Pump Stations Consolidation
10230001 Foley Forest Pump Station Upgrade, Dellwood Estates and North Bay Village Pump Station Eliminations Phase 2
10240123 Kemper LaneSewer Repair
10310000, 400-426 Three Rivers Parkway Local Assessment Sewer
10440015, Paul Road Sewer Lateral (HN 4216)
10440010 Pippin Road Sewer Lateral Assessment (HN 11535)
10320010, Northgate-Springdale Local Assessment Sewer
10130680, Harwinton Lane Sewer Replacement
2008 Closed Circuit Televising & Sonar Inspection of Large Diameter Sewers, Contract C
2008 Closed Circuit Televising & Sonar Inspection of Large Diameter Sewers, Contract D
10240211 Metropolitan Sewer District Proposed Assembly Room
2008 Closed Circuit Televising & Sonar Inspection of Large Diameter Sewers, Contract B
2008 Televising and Cleaning of Existing Sewers, Off Road
2008 Televising and Cleaning of Existing Sewers, Contract 1
2008 Closed Circuit Televising & Sonar Inspection of Large Diameter Sewers, Contract A
10240006 Elm Street Tap Replacements
102400020, Mill Creek WWTP Aeration Tanks Diffusers Replacement, Contract 70
10240133,Hageman Avenue Pump Station
10270041, Mt. Washington Pump Station Upgrade
10142440, CSO 191 7601 Production Drive Grating
SS#5743r, CSO 125 Badgeley Run Outfall Badgeley Run RTC Facility Electrical Re-Bid
SS# 5496, Mill Creek WWTP Disinfection Improvements
SS# 5827, Misc. HVAC Repairs Phase I, Mill Creek WWTP
SS#5879, Coleridge Avenue Replacement Sewer
SS#5912r, Trenchless Technology Manhole Rehabilitation Re-Bid
SS#5874, Colette Lane Sewer Replacement
SS#5682, Harvey Avenue Replacement Sewer
SS#5912, Trenchless Technology Manhole Rehabilitation
SS#5710, 562-618 Neeb Road Local Assessment Sewer
SS#5743, CSO 125 Badgeley Run Outfall Badgeley Run RTC Facility
SS#5911, Trenchless Technology Sewer Rehabilitation
SS#4814, Eastern and Delta Avenue Sewer Separation, Phase 1
SS#5771, Lick Run Interceptor Chamber Real Time Control
SS#5723, Glenwood Avenue Sewer Repair
SS#5762 6251-6291 Rocknoll Lane Assessment Sewer
SS#4871 Arrowood Pump Station Elimination
SS#5174_5174A, Sycamore Creek WWTP Phase 3 and 4 Expansion and Upgrade
SS# 3831Br Wesselman Road Interceptor Sewer Phase 1A-3 & 1B
SS#5905 810 Woodlawn Avenue Sewer Lateral
SS#4653r 9783-9858 Union Cemetery Road Local Sewer
SS#5744, CSO 482 Mitchell Avenue Outfall Mitchell Avenue RTC Facility
SS#5291r Patrilla Lane & Plumhill Drive Local Sewer
SS#5709, 1612-1615 Devils Backbone Road Local Sewer
SS#3831B, Wesselman Road Interceptor Sewer Phase 1A -3 & 1B
SS#5712, 4922-5150 Hubble Road Local Sewer
SS# 5466 Mill Creek Interceptor Diversion Chamber
SS#5875 Felicity Drive Main Line Repair
SS#5049 Little Miami WWTP Waste Activated Sludge Thickening
SS#5457, Gideon Lane Local Sewer
SS#5660, Blair Ave. & Erkenbrecher St. Lateral & Mainline Repair
SS#4989r1, Polk Run WWTP Expansion, Phase 3B, Polk Run Pump Station Elimination Sewer Re-Bid
SS#5698, Adams Rd. & Hastings St. Lateral & Mainline Repair
SS#5747, Kenwood Road Pump Station Elimination and SS#, 5773, 5901-6001 Wind Road Local Sewer
SS#4995,Hengehold 4th and Yates 3rd Pump Stations Elimination
SS#4653, 9783-9858 Union Cemetery Road Local Sewer
SS#5291, Patrilla Lane & Plumhill Drive Local Sewer
SS#5851, Lockland Road/ I-75 Ramp Sewer Repair
SS#5845, Graydon Avenue Lateral and Mainline Repair
SS#5846, 1110 Galbraith Road Service Lateral Repair
SS#5658r, Bathgate Street & Whittier Street Lateral & Mainline Repair
SS#5848, Beldare Ave. and Hale Ave. Lateral Repairs
SS#5725, Mt. St. Joseph Sewer Replacement
SS#5833 Ravine Street Sewer Replacement
SS#5659, Eden Ave. Lateral & Mainline Repair
SS#5823 School Section Road Sewer Replacement
SS#5644, Rutledge Avenue Area Sewer Replacement
SS#5733 Mill Creek WWTP Power Plant Building Asbestos Removal
SS#5834, Wulff Run Interceptor Parallel Sewer
SS#5699, Losantiville & Schubert Avenues Sewer Replacement
SS#5445, McGrew Avenue Pump Station Relocation
SS#5638 Wastewater Collection Division Maintenance Shop Maintenance Shop Upgrade
SS#5850, Clough Road Sewer Abandonment and Lateral Relocation
SS#5821, 187 First Street Sewer Replacement
SS#3792 Foley Forest Pump Station Upgrade; Dellwood Estate & North Bay Village Pump Station Elimination, Phase 1
SS#5072 Ross Run Sewer Separation
SS#4872, Winton Woods Pump Station Consolidation Project-Phase One
SS#4737 Pebble Creek WWTP Elimination
SS#5844_5852 Polk Run Odor & Influent Screen Replacement
SS#5753r, Wulff Run Sewer Replacement Re-Bid
SS#5566r, Mill Creek WWTP Septage Receiving Station and Odor Control, Contract 66
SS#5426_5873,6480 Visitation Drive and 6506 Visitation Drive
SS#5061 Palisades Park Pump Station 1 & 2 Elimination
SS#3961, Britney Acres Pump Station Upgrade
SS#5740 Broadview Drive & Country Club Place Sewer Separation
SS#5815, 804 Finney Trail Lateral Assessment
SS#5612, Krohn Conservatory Sewer Relocation
SS#4750 Millbrook No. 1 Pump Station Upgrade
SS#5386 & 5495 841 Asbury Road & 8139 Woodruff Road
SS# 5266, Taylor Creek WWTP and Pump House
SS#5720 Robert Avenue Local Sewer
SS# 5787C, Trenchless Technology Sewer Rehabilitation
SS# 4877&5772, Muddy Creek WWTP Secondary Flow Enhancement and Influent/Effluent Pump Station
SS# 5787B, Trenchless Technology Sewer Rehabilitation
SS#3825 National Distilleries Sewer Replacement
SS# 5753, Wulff Run Sewer Replacerment
SS# 5788B, Trenchless Technology Manhole Rehabilitation
SS# 5788A, Trenchless Technology Manhole Rehabilitation
SS# 5769, Virginia Court & Bridgetown Road Sewer Replacement
SS# 5755, Harrison Ave & Race Road Sewer Replacement
SS# 5565p2, Mill Creek WWTP Incinerator Replacement, Phase 2
SS# 5787A, Trenchless Technology Sewer Rehabilitation
SS# 4986, CSO 437 Elimination, W. 3rd Street Sewer Separation, Phase 3
SS# 5566, Mill Creek WWTP Septage Receiving Station and Odor Control
SS# 5349, Arrowhead Court and Marview Terrace Pump Station Improvements
SS# 4989r, Polk Run WWTP Expansion, Phase 3A--Polk Run PS Elimination Sewer
SS# 02988, Ammon Avenue Intake
SS# 5343, Towerview Lane Local Sewer
SS#5546, 6644 & 6666 Schweitzerhoff Road Lateral Assessment
SS#5708, SSO 574 Elimination Sewer
SS#3959, Greenridge 5th Pump Station Upgrade
CSO 450 Elimination, Butler Street
CSO 487 Twin Outfall Ross Run Real Time Control Facility
Clifton Hills Terrace Sewer Replacement
1628 Eight Mile Road Sewer Lateral Assessment
Desmond Drainage Improvement
Lehman Road Sewer Replacement
Centurion Estates Pump Station Elimination
GCWW Miller Plant Sewer Replacement
Mill Creek WWTP Incinerator Replacement, Phase 1 (Electrical Equipment Pre-Purchase)
Storage Building at Little Miami Waste Water Treatment Plant
Supplemental Environmental Project 1,2, & 4
McMicken & Warner Avenues Sewer Replacement
7931 Clough Pike Lateral Assessment
SS#5670, Trenchless Technology Sewer Rehabilitation
Purchase & Demolition 4668 Rapid Run (Re-bid)
Cornelia Avenue Sewer Replacement
Aster Place Sewer Replacement
N. Pippin Road Lateral Assessment
N. Edgewood Avenue & Hand Avenue Sewer Replacement
Streamwood Pump Station Elimination
Berkley Woods Pump Station Elimination
Miamitown Interceptor Sewer
Dry Run Pump Station Access Road Drainage Improvement
Purchasing and Demolition 4668 Rapid Run
Villiage of Elmwood Place Waste Water Facility Remediation
Johnson Road Pump Station Elimination, Phase 2
SS#5670A, Trenchless Technology Sewer Rehabilitation
SS#5731, Trenchless Technology Manhole Rehabilitation
Givaudan Flavors Sanitary Sewer Separation
Loveland Avenue Lateral Assessment
North Bend Road and Connecticut Court Sanitary Sewer Replacement
Mill Creek Supplemental Environmental (hopple & Gest Streets) Re-Bid
West Fork Road Lateral Assessment
Markley Road Lateral Assessment
Pump Control Panels For Pump Stations
Water In Basement Prevention Program
Galbraith Road Building Addition and Alterations
Springfield Pike Sewer Replacement
Mill Creek WWTP Liquid Treatment Improvements Phase 2 Coarse Screen Replacement - Contract 65
Este Avenue CSO Flood Remediation Project
Detzel / Moerlein / Warner Street Sewer Replacement
Pleasant Run Drainage Basin Facilities Upgrade Phase 2 - Force Main Improvements
Mill Creek Supplemental Environmental
Kellogg Avenue Sewer Replacement (Re-Bid)
Rhode Island Avenue at Dale Avenue Sewer Replacement
Muddy Creek Sewer Stabilization
SS#5607, Trenchless Technology Sewer Rehabilitation
Mockingbird Lane Sewer Replacement
Sunnybrook Drive Sewer Replacement
Jandaracres Sewer Assessment (Re-Bid)
Ridgewood-Hader Local Sewers (Re-Bid)
McPherson and Purcell Avenues Sanitary Sewer Repair (Re-Bid)
McPherson and Purcell Avenues Sanitary Sewer Repair
Sycamore Creek WWTP Expansion Phase 1 & 2 (Re-Bid)
Miamitown River Crossing
Eastern Avenue Express Sewer Ph II
SS#5608, Trenchless Technology Manhole Rehabilitation
Ridgewood-Hader Assessment Sewer
Montana Avenue Sewer Separation, CSO 89 Elimination (Re-Bid)
Barrier Dam Bulkhead Rail Replacement (Re-Bid)
Sycamore Creek WWTP Expansion Phase 1 & 2
Montana Lateral Replacement
Archived Bid Results for Contracts
Official - Archer Street CSO Improvement, CSO #86
Official - CSO No. 3 Harrison and State Avenues West, High Water/Dry Weather Protection
Official - CSO No. 557 Elimination (Re-bid)
Official - Montana Avenue Sewer Separation, CSO 89 Elimination
Official - Arrow Street WWTP Elimination and North Bend Crossing PS Elimination
Official - Upper Concrete Driveway Rehabilitation
Official - Northern Avenue Demolition
Official - Jandaracres & Bridgetown Road
Official - Givaudan Flavors Sanitary Sewer Separation (NO BIDS RECEIVED)
Official - Kellogg Avenue Sewer Replacement (NO BIDS RECEIVED)
Official - Trenchless Technology Sewer Rehabilitation, Phase V
Official - Galbraith Road Grit Handling Facility Replacement Project
Official - WWTP Expansion Phase 3 - Polk Run Sewer Extension
Official - Mariemont SSO Elimination
Official - Dorchester Avenue - Alvin Street Sewer Replacement (RE-BID)
Official - SMU's Wayside Avenue Drainage Improvement Project
Official - Elbrook Avenue Sewer Rehabilitation
Official - SMU's Hillside Avenue Drainage Correction
Official - SMU's Britton Ave. Area Drainage Improvement Project & Water Main Replacement
Official - CSO No. 451 Elimination, Sawyer Point
Official - SSO 597 Elimination LaBoiteaux Avenue Sewer Replacement
Official - Galbraith Driveway Rehabilitation
Official - Dorchester Avenue - Alvin Street Sewer Replacement (ALL BIDS REJECTED)
Official - SMU's DeCamp Ave. Drainage Improvement
Official - Modification Mill Creek, CSO #4
Official - Camberly Acres Lift Station Elimination Project Phase 2
Official - Ludlow Run Relief Sewer
Official - Trenchlesss Technology Sewer Rehabilitation, Phase 4
Official - CSO No. 557 Elimination
Official - Beechmont Avenue Flood Gate Replacement
Official - SMU's West Fork Channel Rehabilitation Phase III Part A and B
Official - SSO 700 Storage and Treatment Facility - General Construction
Official - SSO 700 Storage and Treatment Facility - Electrical
Official - SSO 700 Storage and Treatment Facility - HVAC
Official - Garden Hills Pump Station Elimination
Official - Rockdale Ave Sanitary Sewer
Official - Seven Hills Sewer Replacement
Official - SMU's California Area Sewers Project
Official - Cranbrook Sanitary Sewer Assessment Project
Official - Durango Green/Shady Lane Pump Station Elimination
Official - Galbraith Rd. Facility Concrete Parking Lot and Loading Dock Rehabilitation
Official - Manhole Rehabilitation Project
Official - Trenchless Technology Sewer Rehabilitation Phase 3
Official - Samoht Ridge Road Sewer
Official - Camargo Road Sewer Improvement: Phase 2A, 2B, & 2C
Official - Cathcart Avenue Drainage Correction Project
Official - Deer Park/Matson Avenue Relief Sewer
Official - Cooper Creek Replacement Sewer Contract 2, Part B (Re-Bid)
Official - Trenchless Technology Sewer Rehabilitation, Phase 4
Official - Dry Run Pump Station Retaining Wall
Official - Victoria Avenue Storm Sewer Rehabilitation (Re-Bid)
Official - SMU's Neff Ave. Drainage Improvement Project
Official - Water in Basement Prevention Program (Combined)
Official - Water in Basement Prevention Program (Plumbing)
Official - Water in Basement Prevention Program (Electrical)
Official - Water in Basement Prevention Program (General Construction)
Official - Goodman Avenue Relief Sewer
Official - Trenton Avenue Sanitary Sewer
Official - Alley Between Hamilton & Harrison Avenues, Mount Healthy, Ohio