Middle Tennessee State University

Energy and Utilities Summary Report

1. Project Information

·  Project Title ______

·  Report Date ______

·  Building Name ______

·  Design Firm ______

-  Contact Person & Phone ______

·  Maximum Allowable Construction Cost $______

·  Design/Construction Status

-  Design = ______%

-  Construction = ______%

2.  Building Description

·  Gross Square Feet ______

·  Envelope Parameters including

-  U-values

-  Types of fenestration

-  Percent of gross wall area occupied by fenestration and orientation

·  Heating and Air-conditioning Systems including

-  Types of mechanical/refrigeration systems

-  Types of heating systems

-  Types of automatic temperature controls

-  Types of ventilation systems

·  Lighting Systems and Controls

·  Domestic Water Heating Systems


3. Energy and Utilities Usage Summary

·  Energy Type(s)* (1)______

(*electricity, steam, natural gas, etc.) (2)______

(3)______

·  Annual Energy Consumption by energy unit* (1)______

(* kwh, dktherm, etc) (2)______

(3)______

·  Annual Energy Consumption by mmbtu (1)______mmbtu

(2)______mmbtu

(3)______mmbtu

Total ______mmbtu

Consumption/sf ______mmbtu/sf

·  Energy Balance -

Electrical Demand and Usage – Provide a Table(s) and Chart(s) estimating the electrical demand (kw) and annual usage (kwh) by end use (i.e. lighting, plug loads, cooling, fan motors, pump motors, etc).

·  Energy Code Compliance – Provide a list of applicable energy codes and a statement of design compliance.

·  Energy Analysis Tools – Provide a list of all energy calculation/simulation methods and software tools used in producing this report.

4.  Energy and Utilities Cost Summary

·  Annual Energy Cost

Rates Costs

(1) ______(1) $ ______

(2) ______(2) $ ______

(3) ______(3) $ ______

Total $ ______

Annual Energy Cost/sf ______$/sf

5.  List of Energy Efficiency/Conservation Features – List any design features specifically addressing energy efficiency or conservation.

6.  Metering Considerations – Describe metering or sub-metering design considerations (permanent or temporary).

7.  Commissioning Considerations – Describe commissioning activities to be accomplished in the construction phase (incorporated in the design phase). Include systems to be commissioned, designer responsibilities, acceptance testing requirements, etc.

8.  Operations and Maintenance Considerations – Describe operational and maintenance requirements for the owner. Include special operating parameters, special maintenance activities, O&M personnel training needs, etc.

1