Marius Byliefeldt Page 1 of 4

Marius Byliefeldt Supervisor– Control & Instrumentation

PERSONAL DETAILS

Date of Birth:20 April 1974 Nationality:South African

Health: Excellent health and valid yellow cardID Number:740420 5137 083

Landline:+27 56 817 2482Languages:English/ Afrikaans

Mobile/Cell:+27 83 419 9087Current Location:South Africa

E-mail:Passport:Valid

Marital Status:Married Dependants: 3 (Wife & 2 sons)

PROFILE

Qualified control and instrumentation technician, specializing in systems(SCADA and PLC’s) with broad experience in the mining sector. Track record of excellent performance.Previous expat experience.

CAREER SUMMARY

06/2009–10/2010 / C&I Supervisor–Control Systems
Siguiri Gold Mine – Guinea (West Africa) / AnglogoldAshanti, Guinea
02/2006-05/2009 / C&I Systems Technician
Venetia Diamond Mine / De Beers, South Africa
08/2001-01/2006 / C&I Systems Technician - Mponeng Gold Mine / AngloGold Ashanti, South Africa
03/1998-07/2001 / Instrument Technician- Bambanani Gold Mine / AngloGold, South Africa
01/1996-03/1998 / Instrument Technician – Freegold One Plant / Freegold Mining, South Africa
12/1991-01/1996 / Apprentice Instrument Mechanician

EDUCATION & QUALIFICATIONS (all in South Africa)

1996Trade Test Certificate: Instrument MechanicianDivisional Engineering Training Centre, Welkom (MIETTB)

1995Industrial Electronics / Industrial Instruments(N5, N6)VanderbijlparkTechnicalCollege

Engineering Physics / Mathematics (N5, N6)

1993/4Industrial Electronics / Industrial Instruments (N3, N4)WelkomTechnicalCollege

Engineering Physics / Mathematics (N3, N4)

1991High School Certificate (University entrance)TechnicalHigh School - Welkom

TECHNICAL COURSES COMPLETED

Certified Profibus Engineer

Wonderware Intouch Basic

NOSA Health and Safety Rep

A+ PC Technician

Siemens S7 Service1

Siemens S7 Programming 1 & 2

Siemens Simocodes

Siemens S5 Comms (S5-Komms)

Siemens S7 Comms (S7-Komms)

Remcon Telemetering Systems

Practical Fieldbus & Device Networks

/ Hirschmann Industrial Ethernet (Advanced)
Siemens WinCC SCADA
Siemens Protool HMI Development
Siemens S7-PID
Siemens S7-200 PLC
Citect Basic Configuration
Citect Intermediate Configuration
Citect Cicode Fundamentals

Allen Bradley VSD’s

Adroit SCADA 4.2 Basic Configuration

Adroit SCADA 4.2 Advanced Configuration

PROFESSIONAL EXPERIENCE

06/2009-10/2010C&I Supervisor (Expat) – Control Systems : Siguiri Gold Mine

AnglogoldAshanti, Guinea (West Africa)

Installation and commissioning of new PLC systems and maintenance of current systems.

Modicon Quantum and Momentum PLC’s (Concept Software) with Wonderware Intouch SCADA (Ver 9 SP2)

Magelis control stations configuration and commissioning.

Maintenance and configuration of SQL server for trending and archiving of data.

Maintenance and configuration of all Wonderware workstations throughout plant area.

Installation and configuration of ActiveFactory on all clients.

Provide technical support to the processing and other engineering departments, electrical, mechanical.

Updating and maintaining all PLC programs and documentation of P&ID drawings.

Implement changes on systems in order to improve production and minimize downtime.

Daily backups of current PLC and SCADA applications.

Maintenance of C&I network which includes fiber, copper, wireless ethernet.

Training of Guinean sub-ordinates.

______

02/2006-05/2009C&I Systems Technician : Venetia Diamond Mine

De Beers, Musina, South Africa

Installation and commissioning of new PLC systems and maintenance of current systems.

Siemens S5 (95,115,135,155), S7 (S7-200, S7-300, S7-400) PLC’s with Citect SCADA System.

Provide technical support to the ore processing and ore extraction departments, electrical, mechanical.

Updating and maintaining all PLC programs and documentation of P&ID drawings using Versionworks.

Daily backups of current PLC and SCADA applications.

Maintenance of C&I network which includes fiber, copper, wireless ethernet.

Implement changes on systems in order to improve production and minimize downtime.

08/2001-01/2006Senior Technician / Systems Technician : Mponeng Mine

AngloGold Ashanti, Carletonville, South Africa

Installation and commissioning of new PLC systems, using Siemens S5 and S7 PLC’s and MP370 HMI’s together with the Adroit SCADA System, Wizcon SCADA System and WinCC SCADA System.

Updating and maintenance of PLC systems and P&ID Drawings.

Remcon Telemetering I/O modules on remote installations underground.

Managing a fibre optic network with a Siemens OTN (Open Transport Network) system in the shaft for communication purposes for the Remcon telemetering. On a separate fibre optic backbone I used Hirschmann Industrial Ethernet switches which I configured and maintained.

Installations included 6IDE Eco-vim Ice plants, 4 x Hitachi refrigeration plants, 5 x air compressors, bulk air coolers on surface and underground, 3 x turbines underground, 5 x pump stations, conveyor belt stations and ore loading.

Projects Completed:

(1) Pump Station

Consists of four Sulzer 5-stage pumps. Led a team of one technician and 2 mechanicians to design, installand commission all the instrumentation: 7 Siemens MP370 touchpanel soft PLC’s coupled with Siemens Profibus and AS-I for the I/O to each pump via Profibus and Ethernet to surface via Hirschmann switches on a fibre backbone. Personally did all PLC, HMI programming and SCADA (WINCC) design.

(2) Complete mining backfill system

Consists of 64 Mitech control valves, 6 pumps, and 12 agitators, all controlled from a Siemens MP370 touchpanel, AS-I from the field and 18 Siemens Simocodes and a WinCC remote station connected to 2 main WinCC SCADA servers on surface.

Personally did all the S7 PLC programming, HMI programming and WinCC design and development.

03/1998-07/2001Instrument Technician - Bambanani Mine

AngloGold, Welkom

Automatic controlling of Refrigeration Plants (York and Carrier Types), Pump Stations, Bulk Air Coolers and PRV Stations.

Instrumentation included level control, temperature control and flow control.

Gained experience on Modicon 484, 884, 984, Micro PLC’s and Intouch SCADA system as well as the Siemens OTN system which was used as backbone for C&I communications.

04/1996-03/1998Instrument Technician – Freegold One Plant

Freegold Mining, Welkom

Automatic process controlling on the gold plant - level control, flow control, temperature control, density control and pump speed control via “Fluïd Drives”.

Maintenance of instrumentation on the plant.

Installation and commissioning of new projects.

REFERENCES

Mr Michiel van der MerweProcess Manager, Siguiri Mine, Guinea

Landline: +442076600276E-mail:

Extension 1202

Mobile: +224 62 350 177

Mr Stephen van der BankCI Manager, Venetia Mine

Landline: +27 15575 2753E-mail:

Mr Johan van der WesthuizenInstrumentation and Electrical Supervisor, SMB Societe des Mines de Belahouro, Burkina Faso

Mobile: + 226 75790822E-mail:

Mr Harry McCarthyCI Superintendent, Mowana Copper Mine - Botswana

Mobile: +267746 59457 E-mail:

Mr Gabby FeliceInstrument Technician, No. 1 Gold Plant, Harmony Mine, Welkom

Landline: +27 57 904 3012E-mail:

Mr Marchant De KookerElectrical Engineer, South African Region, AngloGold Ashanti

Landline: +2718 478-2602

Mobile: +2782 820 9362 E-mail:

Mr Johan PretoriusC&I Engineer, Mponeng Mine, AngloGold Ashanti

Mobile: +27 72 572 7695E-mail:

Further details, reference letters and certificates available on request

[1]