Mainttoc Page 7 of 7
MAINTAINABILITY, AVAILABILITY, AND
OPERATIONAL READINESS
ENGINEERING HANDBOOK
VOLUME 1
TABLE OF CONTENTS
CHAPTER 1- MAINTAINABILITY ENGINEERING ...... ………… 1
1.1- HANDBOOK OBJECTIVES ...... …… 1
1.2- RELIABILITY AND MAINTAINABILITY
ENGINEERING OBJECTIVES AND
BENEFITS ...... … 4
1.3- BENEFITS DERIVED FROM THE
IMPLEMENTATION OF RELIABILITY AND
MAINTAINABILITY ENGINEERING ...... ………… 8
CHAPTER 2- SYSTEM EFFECTIVENESS AND
RELIABILITY ENGINEERING
CONCEPTS ...... ……… 21
2.1- SYSTEM EFFECTIVENESS ...... ………... 21
2.2- A COMPREHENSIVE DEFINITION
OF RELIABILITY ...... …….. 26
2.3- A QUANTIFICATION OF SYSTEM
EFFECTIVENESS ...... ….. 27
2.4- A COMPREHENSIVE DEFINITION OF
MAINTAINABILITY ...... ….. 30
2.5- WHAT IS RELIABILITY ENGINEERING? ...... …………... 30
2.6- WHY RELIABILITY ENGINEERING? ...... ………… 31
2.7- WHAT ARE THE PRACTICAL
APPLICATIONS OF RELIABILITY AND
MAINTAINABILITY ENGINEERING? ...... ………… 32
CHAPTER 3- MAINTENANCE ...... ……… 37
3.1- MAINTENANCE DEFINED ...... ……… 37
3.2- PREVENTIVE MAINTENANCE ...... ……….. 37
3.3- CORRECTIVE MAINTENANCE ...... ……….. 40
3.4- OPERATING TIME AND DOWNTIME
CATEGORIES ...... …… 41
3.5- MAINTENANCE PERSONNEL FACTORS
AND COSTS ...... ……. 44
3.6- MAINTENANCE PERSONNEL
SAFETY FACTORS ...... 45
3.7- MAINTENANCE SUPPORT FACILITIES
AND EQUIPMENT ...... 46
CHAPTER 4- MAINTAINABILITY DESIGN CRITERIA ...... …….. 49
CHAPTER 5- DOWNTIME DISTRIBUTIONS
AND MAINTAINABILITY
ENGINEERING FUNCTIONS ...... …. 67
5.1- DOWNTIME DISTRIBUTIONS ...... 67
5.2- ANALYTICAL MAINTAINABILITY
ENGINEERING FUNCTIONS ANALOGOUS
TO THOSE IN RELIABILITY ENGINEERING ...... 77
CHAPTER 6- MAINTAINABILITY AND ITS QUANTIFICATION ...... 91
6.1- MAINTAINABILITY DEFINED ...... 91
6.2- THE EXPONENTIAL CASE ...... 93
6.3- THE REPAIR RATE, μ...... 97
6.4- THE MEAN TIME TO REPAIR, MTTR ...... 97
6.5- MEAN ACTIVE CORRECTIVE
MAINTENANCE TIME, ...... 99
6.6- MEAN ACTIVE PREVENTIVE
MAINTENANCE TIME, ...... 100
6.7- MEAN ACTIVE CORRECTIVE AND
PREVENTIVE MAINTENANCE TIME, tM ...... 100
6.8- EQUIPMENT REPAIR TIME, ERT ...... 101
6.9- GEOMETRIC MEAN TIME
TO REPAIR, MTTRG ...... 101
6.10- MAXIMUM MAINTENANCE TIME, ...... 102
6.11- THE LOGNORMAL CASE ...... 106
6.12- MAINTAINABILITY FOR GIVEN
RESTORATION TIME WITH A WEIBULL
TIMES-TO-RESTORE DISTRIBUTION ...... 111
6.13- TIME TO RESTORE FOR GIVEN
MAINTAINABILITY WITH A WEIBULL
TIMES-TO-RESTORE DISTRIBUTION ...... 112
6.14- A PRIORI VERSUS A POSTERIORI
MAINTAINABILITY DETERMINATION ...... 114
CHAPTER 7- STEADY STATE MEAN TIMES TO ACTIVELY
RESTORE, REPAIR AND/OR REPLACE
COMPONENTS IN AN EQUIPMENT ...... 123
7.1- MEAN TIME TO ACTIVELY RESTORE AN EQUIPMENT ...... 123
7.2- EQUIPMENT RESTORATION TIME,
EFFICIENCY AND CONSISTENCY ...... 125
7.3- MEAN MAINTENANCE MAN-HOURS ...... 128
7.4- MEAN MAINTENANCE MAN-HOURS TO
REPAIR AND REPLACE AN EQUIPMENT ...... 129
7.5- MEAN TIME FOR CORRECTIVE AND
PREVENTIVE MAINTENANCE ...... …. 137
CHAPTER 8- MAINTAINABILITY ENGINEERING
SPECIFICATIONS AND
THEIR APPLICATIONS ...... 147
8.1- GOVERNMENT MAINTAINABILITY SPECIFICATIONS ...... 147
8.2- MIL - STD - 470 ...... 148
8.3- MIL - STD - 471 ...... 148
8.4- TEST METHOD 1 - TEST OF THE MEAN ...... 150
8.5- TEST METHOD 2 - TEST ON CRITICAL PERCENTILE ...... 158
8.6- TEST METHOD 3 - TEST ON CRITICAL
MAINTENANCE TIME OR MAN-HOURS ...... …………... 163
8.7- TEST METHOD 4 - TEST ON MEDIAN, ERT 169
8.8- TEST METHOD 5 - TEST ON CHARGEABLE
MAINTENANCE DOWNTIME
PER FLIGHT ...... 171
8.9- TEST METHOD 6 - TEST ON MAN-HOUR RATE ...... 178
8.10- TEST METHOD 7 - TEST ON MAN-HOUR RATE
USING SIMULATED FAULTS ...... 179
8.11- TEST METHOD 8 - TEST ON A COMBINED
MEAN/PERCENTILE REQUIREMENT ...... 183
8.12- TEST METHOD 9 - TEST FOR MEAN
MAINTENANCE TIME AND Mmax ...... 191
8.13- TEST METHOD 10 - TESTS FOR PERCENTILES
AND MAINTENANCE TIME (CORRECTIVE
OR PREVENTIVE MAINTENANCE) ...... 196
8.14- TEST METHOD 11 - TESTS FOR PREVENTIVE
MAINTENANCE TIMES ...... 199
CHAPTER 9- PREVENTIVE MAINTENANCE AND ITS
QUANTIFIED ADVANTAGES ...... 243
9.1- PREVENTIVE MAINTENANCE CONCEPTS ...... 243
9.2- PREVENTIVE MAINTENANCE BY
AGE REPLACEMENT-POLICY I ...... 244
9.3- THE CASE OF THE SINGLE EXPONENTIAL
UNIT SUBJECTED TO PREVENTIVE
MAINTENANCE ...... 253
9.4-CORRECTIVE FAILURE RATE AND
PREVENTIVE REPLACEMENT RATE
FOR POLICY I ...... 269
9.5- TOTAL AVERAGE NUMBER OF SPARES FOR
FOR POLICY I ...... 273
9.6- MINIMUM COST PREVENTIVE MAINTENANCE
PERIOD, Tp, FOR POLICY I ...... 274
9.7- PREVENTIVE MAINTENANCE BY
BLOCK REPLACEMENT-POLICY II ...... 275
9.8- PREVENTIVE MAINTENANCE BY
REPLACING GROUPS OF PARTS ...... 284
CHAPTER 10- PERIODIC REPLACEMENT POLICIES ...... 335
10.1- ORDINARY PERIODIC REPLACEMENT
POLICY-POLICY III ...... 335
10.2- MODIFIED PERIODIC REPLACEMENT
POLICIES-POLICIES IV, V, VI ...... ….. 338
CHAPTER 11- MODIFIED BLOCK REPLACEMENT
POLICIES ...... 359
11.1- ORDINARY BLOCK REPLACEMENT
POLICY-POLICY VII ...... 359
11.2- MODIFIED BLOCK REPLACEMENT
POLICY-POLICY VIII ...... 361
CHAPTER 12- ADDITIONAL MAINTENANCE POLICIES ...... ……………… 385
12.1- OPTIONAL REPLACEMENT POLICY-POLICY XI ...... 385
12.2- MULTISTAGE REPLACEMENT POLICY-POLICY XII ...... 402
12.3- OPPORTUNISTIC REPLACEMENT POLICY-POLICY XIII ...... 413
12.4- PREVENTIVE REPLACEMENT POLICY
FOR CAPITAL EQUIPMENT-POLICY XIV ...... 433
12.5- OPTIMAL INSPECTION FREQUENCY:
MAXIMIZATION OF PROFIT-POLICY XV ...... 438
12.6- OPTIMAL INSPECTION INTERVAL:
MAXIMIZATION OF EQUIPMENT
AVAILABILITY - POLICY XVI ...... 441
12.7- A SUMMARY OF RECENT DEVELOPMENTS
IN MAINTENANCE POLICIES ...... 446
CHAPTER 13- OVERHAUL POLICIES ...... 461
13.1- OVERHAUL ...... 461
13.2- OVERHAUL DEFINED ...... 463
13.3- DYNAMIC PROGRAMING BASICS ...... 477
13.4- OPTIMAL OVERHAUL/REPAIR/REPLACE
POLICY: FINITE TIME HORIZON ...... 478
13.5- OPTIMAL OVERHAUL/REPAIR/REPLACE
POLICY: INFINITE TIME HORIZON ...... 495
13.6- OPTIMAL COST LIMITS: FINITE TIME
HORIZON ...... 501
CHAPTER 14- SPARES PROVISIONING ...... 533
14.1- SPARES PROVISIONING AT A DESIRED
CONFIDENCE LEVEL ...... 533
14.2- SPARES PROVISIONING FOR A
DECAYING POPULATION ...... 544
14.3- SPARES PROVISIONING WHEN REPLACING
UNITS THAT FAIL BY A PRESCRIBED
OPERATING TIME ...... 546
14.4- PREVENTIVE MAINTENANCE POLICIES
AND SPARES PROVISIONING ...... 551
14.5- SPARES PREDICTION WITH GROWTH AND
WARRANTY ...... 573
14.6- SPARES PROVISIONING WITH COST OF
SPARES CONSIDERATION ...... 583
14.7- SPARES PROVISIONING AND INVENTORY
COSTS CONSIDERATION ...... 609
14.8- COST AND CRITICALITY OF SPARES
CONSIDERATION ...... 625
CHAPTER 15- DISTRIBUTIONAL TEST AND REPAIR TIMES
IN A TEST AND REPAIR FACILITY ...... 635
15.1- HOW TO APPLY ...... 635
15.2- GENERATION OF RANDOM VALUES FOR
VARIOUS DISTRIBUTIONS ...... 671
15.3- ERROR BOUNDS AND NUMBER OF
MONTE CARLO TRIALS ...... 673
15.4- CONCLUDING REMARKS ...... 679
CHAPTER 16- THE WEIBULL PROCESS OF
REPAIRABLE UNITS ...... 697
16.1- THE WEIBULL PROCESS AND ITS CHARACTERISTICS ...... 697
16.2- THE ESTIMATION OF A WEIBULL PROCESS ...... 701
16.3- WHEN TESTING MORE THAN ONE UNIT ...... 711
16.4- THE COMPOSITE WEIBULL PROCESS ...... 721
CHAPTER 17- RELIABILITY OF COMPONENTS
WITH A POLICY OF REPLACING
THOSE THAT FAIL BY A
PRESCRIBED OPERATING TIME ...... 739
17.1- WHEN AND HOW IT IS APPLIED ...... 739
CHAPTER 18- RELIABILITY OF MAINTAINED EQUIPMENT
WHEN KEEPING TRACK OF THE AGES OF
ALL COMPONENTS WITH EXPONENTIAL
AND WEIBULLIAN PDF 'S ...... 755
18.1- RELIABILITY WHILE KEEPING TRACK OF THE AGES
OF ALL COMPONENTS ...... 755
18.2- MEAN LIFE ...... 757
INDEX ...... 769
ABOUT THE AUTHOR ...... 777
http://www.u.arizona.edu/~dimitri/Mainttoc