Time Delay Integration (TDI) Charge Coupled Device (CCD) requirements
Table 1:Electro-optical requirements of sensor:
Unless and otherwise specified all parameters to be measured at 25°C
Sr.No. / Parameter Description / Requirements1 / Number of TDI arrays in one package / 3
2 / Array to array (centre to centre) separation / ≥2002um
3 / Element size / 13μmx13μm
4 / Photosensitive elements (32 lines of 5200 elements) / 5200 x 32
5 / Externally selectable stage options / 1, 4, 8, 16, 32
6 / Spectral response / 450nm - 950nm
7 / Pixel readout rate per output port / ≥10MHz
8 / Number of outputs per array / 4
9 / Array to array and port to port coupling/crosstalk / to be measured on one device
and provide information
10 / Conversion Factor / ≥5μV/e-
11 / Saturation charge / ≥200ke-
12 / Average Responsivity / to be provided by manufacturer at three different wavelengths 450nm, 650nm, 850nm
13 / Read Noise / ≤60e-
14 / Average Dark current / ≤1.5nA/cm2
15 / Output Signal Non-Linearity (10% to 80% of saturation) / ≤2%
16 / Dark current density / to be provided by manufacturer
17 / RMS Photoresponse Non Uniformity in:
450-520nm
520-580nm
620-690nm
770-860nm
For 32 stage / ≤ 3% for all 4 bands
18 / Charge Transfer Inefficiency vertical / ≤2%
19 / Charge Transfer Inefficiency horizontal / ≤2%
20 / MTF in TDI direction TDI at Nyquist / ≥50% at 500 nm
≥37% at 700 nm
≥25% at 900 nm
Table 2: Geometrical Parameter
Parameter / Specified values/tolerance / Definition/descriptionΔXi / ± 0.5 μm / The tolerance on the distance between first element and ith element of any one stage with respect to (Lox (i-1) / (N-1))
ΔYj / ± 0.5 μm / The tolerance on the distance between first element and jth element of any one pixel with respect to (Loy (j-1) / (Ns-1))
N / 5200 / The number of active pixels along X-axis.
Ns / Number of TDI stages (1, 4, 8, 16, 32) along Y-axis shall be selectable.
Pcx, Pcy / 13 μm X 13 μm / Pixel pitch in x and y direction
ΔZ / ≤± 25 μm / Deviation of zi,j co-ordinates from the best fit plane
Δtx, Δty / ≤ ± 100 μm / Die position tolerance in X, Y direction w.r.t package
ΦD (in X, Y direction) / ≤ ±0.4 degree / Die orientation w.r.t package
Table 3: Package and storage Requirements
Sr.No. / Parameter Description / Requirements1 / Operating temperature / 0°C to +70°C
2 / Storage temperature (non-operating) / -55°C to +150°C
3 / Package (ceramic package hermitically sealed with glass window) / AlN PGA, 128 pins
R & QA
- The devices shall be processed and tested as follows:
- In process inspection as per Table-1.
- Screening on 100% basis as per Table-1.
- QCI inspection: Group A, Group B & Mechanical Sub-Group testing as per Table-2.
Table-1: In process Inspection and Screening Test Plan
Operation / Sampling level / Applicable methodWafer electrical test / 100% / Internal specification
Wafer sawing / 100% / Internal specification
Die visual inspection / 100% / MIL-STD 883 method 2010
Marking / 100% / Internal Inspection
Die attach / 100% / Internal specification
Die attach inspection / 100% / MIL-STD 883 method 2010
Die position inspection / sampling / Manufacturer’s specification
Die flatness test / sampling / Manufacturer’s specification
Wire bonding / 100% / Manufacturer’s specification
Bond strength test / Lot by lot (As per Table-2) / MIL-STD 883 method 2011
Die shear or stud pull test / Lot by lot (As per Table-2) / MIL-STD 883 method 2027
Wire bonding inspection / 100% / MIL-STD 883 method 2010
Window Inspection / sampling / Manufacturer’s specification
Encapsulation / 100% / Manufacturer’s specification
Sealing Inspection (Internal and External) / 100% / MIL-STD 883 method 2009 & 2010
High temperature stabilization bake / 100% / MIL-STD 883 method 1008, 48 H @ 150°C
Temperature cycling / 100% / MIL-STD 883 Method 1010 -55°C to +125°C, 10 cycles
Fine Leak Test / 100% / MIL-STD 883 Method 1014 Condition A
Gross Leak Test / 100% / Done by visual inspection of the glass lid glue filet
Electrical Measurement at reference temperature / 100% / Manufacturer’s Internal specification
Power burn-in / 100% / MIL-STD 883 Method 1015 240H @125°C
Electrical Measurement at reference temperature / 100% / Manufacturer’s Internal specification
PDA Calculation
Drift Criteria / Lot by lot
Mutually agreed upon / 5% or 1 part from pre to post burn-in test by assembly lot
Electro-optical Measurements / 100% / Device specification
External Visual Inspection / 100% / MIL-STD 883 method 2009
Packing / 100% / Manufacturer’s Specification
QCI Group A: Electrical Test / Sampling (As per Table-2) / Manufacturer’s Specification
QCI Group B / Sampling (As per Table-2) / Based on MIL-STD 883
Mechanical Sub-Group Testing / Sampling (As per Table-2) / Based on MIL-STD 883
Certificate of Compliance / Lot by lot (As per Table-2) / Internal Specification
Table-2: Qualification Test Plan
QCI Group A: Electrical Test / 10 (0) / Manufacturer’s SpecificationQCI Group B / 2 (0) / MIL-STD 883 Method 5005
Resistance to Solvent
Solderability
LAT2 / 6 (0)
Initial E-O measurement
Operating Life Test
External Visual Inspection
Final E-O measurement
Mechanical Sub-Group / 2 (0)
Initial E-O measurements / Manufacturer’s Specification
Visual Inspection / MIL-STD 883 method 2009
Mechanical Shock Test / MIL-STD 883 Method 2002, Condition-B
Vibration Variable Frequency / MIL-STD 883 Method 2007, Condition-A
Visual Inspection / MIL-STD 883 method 2009
Final E-O measurements / Manufacturer’s Specification
Fine Seal Leak Test / MIL-STD 883 Method 1014 Condition A
Geometrical Measurements / Manufacturer’s Specification
Bond strength test / MIL-STD 883 method 2011
Die shear or stud pull test / MIL-STD 883 method2027
Certificate of Compliance / Lot by lot / Internal Specification
- The deliverable devices shall be accompanied with the following documentation:
- Certificate of compliance
- Complete data package including test reports as indicated below.
a)In process inspection: die attach, wire bond, window inspection for optical acceptance, sealing inspection.
b)100% read and record data of screening
c)Group A & B and Mechanical Sub-Group test report including detailed read & record data
The above data requirements also apply in case the devices offered are an overrun from other space programs. However, as a minimum the data pack shall include complete test details and attributes data for the delivered devices.
- Packaging, Storage & Transportation:
- Each unit shall be packaged in order to protect the device against ESD, electrical, mechanical and environmental damage.
- Further, the individual packages and the intermediate packages shall be fixed within the shipping package, which shall be resistant to mechanical shocks, humidity and dust.
- Wherever required, the individual packages for the units and/ or transportation container shall have facility for nitrogen purging, so that the unit is purged with dry nitrogen before shipment, to prevent contamination and corrosion.
- It is to be noted that "Pink poly-foam" shall not be used for packing of the individual units, as it has a corrosive effect on gold plating of the device body and leads.
- The shipping documentation shall be enclosed in the shipping package.
In addition to other mandatory shipping markings, the following additional marking shall appear on the shipping package in bold letters:
“HANDLE WITH CARE”
“ESD SENSITIVE”
“HIGH-RELIABILITY COMPONENTS"
“TO BE OPENED UNDER CLEAN ENVIRONMENT WITH ESD
PROTECTION ONLY IN PRESENCE OF ISRO AUTHORIZED
PERSONNEL”
“STORE IN A COOL AND DRY PLACE”
Table-3
Deliverables and Delivery schedule
S. No. / Item / Qty. / Schedule1 / Interface control document / 1 / T0+3 months or earlier
2 / Generic radiation test results / 1 / T0+6 months or earlier
3 / FM detector / 2010 / T0+15 months
4 / FM Test report / 1 / T0+15 months
5 / Data package report / 1 / T0+15 months
6 / LAT devices / 1 lot / T0+15 months
7 / Lot acceptance test report / 1 / T0+15 months
T0: Date of signing of contract or receipt of export license whichever is later