JORGE MICHELA SCARLAZETTA

José González 0962

Punta Arenas – Chile

9-2997244

JOB SUMMARY

Electrical Engineer from the University of Concepcion, with experience in important companies of Area Petro-Chemical. Development Specialist Detail Engineering, project management, quality control, monitoring electrical assemblies, control costs and develop and implement maintenance plans. Experience in Construction and commissioning of wind farms. Strong leadership and management teams.

PROFESSIONAL EXPERIENCE

Methanex Chile Limited Punta Arenas Sep 1997 – present

One of the largest producers of methanol in the world with a share of around 20% of World Market. Methanex Chile has assets of around U $ M 1,200, about 180 employees and produces about 17% of the world.

Senior Electrical Project Engineer. 2010 to Date.

Participation in negotiations to connect Methanex Electrical generators now EDELMAG, project export electricity to ENAP, responsible for the development of detail engineering for the relocation of the Plant II the United States, responsible for load testing 2 turbo generators, asset manager Methanex electrical generation system with a total generating capacity of 40 MW (2 Turbo generators, 4 and 3 Steam Generators Power generators), participation in group reliability of Methanex.

Senior Electrical Engineer. 2008 to 2010.

Integral Project Manager Black Cape Wind Project, responsible for the basic engineering phase, Detailed Engineering, Equipment Purchase, Contract Services, Construction and Commissioning Black Cape Wind Farm (U $ 5.3 million budget managed) and Engineer Project leader EID area during the Basic Engineering Project coal-fired boiler of 140 Ton., businesses partially in India with the company ISGEC John Thompson for a period of 1 month.

Electrical Supervisor. Maintenance department from 2005 to 2008.

Responsible for the electrical maintenance group composed of 7 and 6 contractors electrical technicians, among the main tasks include developing and implementing plans to maintain the electrical system to manage the budget of the area with a strong focus on the work environment and personal development.

Electrical Engineer Project Leader. 2003 to 2005

Responsible for the electrical area during the construction phase and commissioning of the Fourth Train Methanol, within the main tasks include quality control, assurance of Engineering, participation in Factory Test Engine Control Center in the U.S. , Medium Voltage Transformers Rhona, Valparaiso, and equipment in medium and low voltage Rolec, Santiago; Responsible for leading the phase-Engineering-Electrical part in the project Construction of the Fourth Train Methanol, Chile IV activity in Germany Lurgi offices for a period of 1 year.

Project Engineer. 1997 to 2005

Among the most important activities include, participation in the development of engineering, construction and commissioning of 7.5 MW cogeneration unit with Acceptance Testing of Turbo Generator in San Diego, USA. Team Leader in Installation of 2.5 MW Turbo Generator, a team that was relocated from New Zealand (U managed budget $ 1,000,000) and charged with participating in the disarmament of the Unit in New Zealand, study of System Protection Coordination Electrical Methanex-Chile engineering development for the Project System Detail Bently Nevada, and over 40 electrical and instrumentation projects in Methanex. (Approximate budget of these projects U $ 2,000,000).

In all this work I have had to interact with a group of people of various nationalities meet safety standards, quality, time, within budget and with no fatalities recorded.

ENAP Magallanes Punta Arenas in October 1996 - Sep 1997

Chilean main oil industry, with a market share close to 85% of liquid fuels in the country. Founded on June 19, 1950, to exploit the oil fields of the Magallanes Region.

Engineering Department ENAP Magallanes October 1996 - Sep 1997

ENAP Magallanes

A study by the proposals for the award of the implementation of the SCADA system for monitoring the gas distribution network of ENAP, and the development and supervision of project implementation Electric Area are necessary to ensure gas supply to third production train Methanex Chile.

Punta Arenas Methanex Chile Limited Jan 1994 - February 1994Professional PracticeENAP Magallanes Magallanes-Jan 1992 - February 1992Professional Practice

EDUCATION

University of Concepción, Concepción, 1988 – 1996Electrical Engineer.

Salesian Liceo San Jose, Punta Arenas, 1985 - 1987Media Education.

Languages:• Intermediate English, speaking, reading and writing.

Computer: level user of Word, Excel, Visual Basic, AutoCad, Maximo and Power Station-ETAP (Electrical Simulation Software).

PROFILE•

Date of Birth: July 14, 1970•

RUT: 8830942-1•

Nationality: Chilean•

Marital status: Single•

Activities of Interest: Photography, Sports and Travel.