Job Completion Check List
Check list to be completed by contractor prior to CT Homes coming out for final punch list. CT Homes reserves the right to request more work to be completed that is not on this list.
EXTERIOR:
Exterior body paint touch up complete
Facia and eves termite damage repaired
Facia and eves paint touch up complete
Fence gates open and close properly without sticking or rubbing
Pergola paint complete
Top of pergola painted
All hardware including bolts and hangers painted
All exterior lights operational with working light bulbs
Newly constructed fence is clear coated
Deck painted or clear coated (based on SOW)
All exterior doors painted properly and touched up
All exterior doors open and close properly and latch
All exterior doors hardware installed correctly
Three keys made for front door
No plumbing leaks from any exterior plumbing
LANDSCAPING:
No dead spots in grass
Sprinklers work and are not spraying house
No dead plants
Bark in planters has even covering and is not messy
Yard cleaned and not messy
INTERIOR:
COMMON LIVING SPACES AND HALLS:
Ceilings:
Ceiling texture complete and without imperfections
Ceiling drywall patches completed and without imperfections
Ceiling paint touch ups complete
Ceiling lights installed and operational with working light bulbs
Ceiling junction boxes covered with appropriately colored face plates
Walls:
Walls texture completed and without imperfections
Wall drywall patches completed and without imperfections
Wall touch up paint completed
Electrical:
All light switches installed correctly and securely (not loose or wiggly)
All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)
All outlets wired correctly and operational
Cabinets:
All cabinets open and close correctly
Cabinets painted correctly including inside (and clean)
Cabinet hardware installed correctly
Doors and Casing:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Open and close without sticking on jam
Open and close without rubbing on floor
Latches
Hardware installed correctly and securely
Screens on sliders
Baseboards:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Windows:
Open and close
Lock
Have screens (that are not ripped)
All areas where water can get in are caulked correctly and sealed
Floors:
Hardwood (New):
All glue cleaned up and not seeping threw seams
All joints tight
All T-bar moldings glued down completely with now glue visible
Hardwood (Existing):
All gaps filled correctly
Sealed correctly
Stained correctly
Carpet:
All edges nailed down correctly
Not loose anywhere
No threads visible
No stains
Tile:
Installed correctly
Grout lines filled correctly
No loose tiles
No broken tiles
No chipped tiles
BEDROOM 1:
Ceilings:
Ceiling texture complete and without imperfections
Ceiling drywall patches completed and without imperfections
Ceiling paint touch ups complete
Ceiling lights installed and operational with working light bulbs
Ceiling junction boxes covered with appropriately colored face plates
Walls:
Walls texture completed and without imperfections
Wall drywall patches completed and without imperfections
Wall touch up paint completed
Electrical:
All light switches installed correctly and securely (not loose or wiggly)
All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)
All outlets wired correctly and operational
Doors and Casing:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Open and close without sticking on jam
Open and close without rubbing on floor
Latches
Hardware installed correctly and securely
Screens on sliders
Closet doors work properly
Closet door hardware properly installed
Closet door floor track installed
Baseboards:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Windows:
Open and close
Lock
Have screens (that are not ripped)
All areas where water can get in are caulked correctly and sealed
Floors:
Hardwood (Existing):
All gaps filled correctly
Sealed correctly
Stained correctly
Carpet:
All edges nailed down correctly
Not loose anywhere
No threads visible
No stains
BEDROOM 2:
Ceilings:
Ceiling texture complete and without imperfections
Ceiling drywall patches completed and without imperfections
Ceiling paint touch ups complete
Ceiling lights installed and operational with working light bulbs
Ceiling junction boxes covered with appropriately colored face plates
Walls:
Walls texture completed and without imperfections
Wall drywall patches completed and without imperfections
Wall touch up paint completed
Electrical:
All light switches installed correctly and securely (not loose or wiggly)
All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)
All outlets wired correctly and operational
Doors and Casing:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Open and close without sticking on jam
Open and close without rubbing on floor
Latches
Hardware installed correctly and securely
Screens on sliders
Closet doors work properly
Closet door hardware properly installed
Closet door floor track installed
Baseboards:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Windows:
Open and close
Lock
Have screens (that are not ripped)
All areas where water can get in are caulked correctly and sealed
Floors:
Hardwood (Existing):
All gaps filled correctly
Sealed correctly
Stained correctly
Carpet:
All edges nailed down correctly
Not loose anywhere
No threads visible
No stains
BEDROOM 3:
Ceilings:
Ceiling texture complete and without imperfections
Ceiling drywall patches completed and without imperfections
Ceiling paint touch ups complete
Ceiling lights installed and operational with working light bulbs
Ceiling junction boxes covered with appropriately colored face plates
Walls:
Walls texture completed and without imperfections
Wall drywall patches completed and without imperfections
Wall touch up paint completed
Electrical:
All light switches installed correctly and securely (not loose or wiggly)
All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)
All outlets wired correctly and operational
Doors and Casing:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Open and close without sticking on jam
Open and close without rubbing on floor
Latches
Hardware installed correctly and securely
Screens on sliders
Closet doors work properly
Closet door hardware properly installed
Closet door floor track installed
Baseboards:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Windows:
Open and close
Lock
Have screens (that are not ripped)
All areas where water can get in are caulked correctly and sealed
Floors:
Hardwood (Existing):
All gaps filled correctly
Sealed correctly
Stained correctly
Carpet:
All edges nailed down correctly
Not loose anywhere
No threads visible
No stains
BEDROOM 4:
Ceilings:
Ceiling texture complete and without imperfections
Ceiling drywall patches completed and without imperfections
Ceiling paint touch ups complete
Ceiling lights installed and operational with working light bulbs
Ceiling junction boxes covered with appropriately colored face plates
Walls:
Walls texture completed and without imperfections
Wall drywall patches completed and without imperfections
Wall touch up paint completed
Electrical:
All light switches installed correctly and securely (not loose or wiggly)
All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)
All outlets wired correctly and operational
Doors and Casing:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Open and close without sticking on jam
Open and close without rubbing on floor
Latches
Hardware installed correctly and securely
Screens on sliders
Closet doors work properly
Closet door hardware properly installed
Closet door floor track installed
Baseboards:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Windows:
Open and close
Lock
Have screens (that are not ripped)
All areas where water can get in are caulked correctly and sealed
Floors:
Hardwood (Existing):
All gaps filled correctly
Sealed correctly
Stained correctly
Carpet:
All edges nailed down correctly
Not loose anywhere
No threads visible
No stains
BEDROOM 5:
Ceilings:
Ceiling texture complete and without imperfections
Ceiling drywall patches completed and without imperfections
Ceiling paint touch ups complete
Ceiling lights installed and operational with working light bulbs
Ceiling junction boxes covered with appropriately colored face plates
Walls:
Walls texture completed and without imperfections
Wall drywall patches completed and without imperfections
Wall touch up paint completed
Electrical:
All light switches installed correctly and securely (not loose or wiggly)
All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)
All outlets wired correctly and operational
Doors and Casing:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Open and close without sticking on jam
Open and close without rubbing on floor
Latches
Hardware installed correctly and securely
Screens on sliders
Closet doors work properly
Closet door hardware properly installed
Closet door floor track installed
Baseboards:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Windows:
Open and close
Lock
Have screens (that are not ripped)
All areas where water can get in are caulked correctly and sealed
Floors:
Hardwood (Existing):
All gaps filled correctly
Sealed correctly
Stained correctly
Carpet:
All edges nailed down correctly
Not loose anywhere
No threads visible
No stains
KITCHEN:
Ceilings:
Ceiling texture complete and without imperfections
Ceiling drywall patches completed and without imperfections
Ceiling paint touch ups complete
Ceiling lights installed and operational with working light bulbs
Ceiling junction boxes covered with appropriately colored face plates
Walls:
Walls texture completed and without imperfections
Wall drywall patches completed and without imperfections
Wall touch up paint completed
Electrical:
All light switches installed correctly and securely (not loose or wiggly)
All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)
All outlets wired correctly and operational
Make sure GFCI’s are installed and operational
All lights work (bulbs installed)
Cabinets:
All cabinets installed correctly
All cabinets open and close correctly
No scratches or dings on cabinets
All cabinet shelves installed (not just laying in cabinet)
Cabinet hardware installed correctly
Drawers open and close properly
All cabinets and drawers cleaned inside and out
Appliances:
Make sure all packaging material is removed from all appliances (inside and outside)
Make sure all appliances are connected and running
Run a full cycle in the dishwasher and make sure it drains properly (make sure there is no kink in the air gap line that could cause it to not drain)
Make sure burners and oven are working
Run microwave and hood
Plumbing:
Turn on sink faucet and make sure it runs properly
Make sure there is adequate water pressure at the faucet
Make sure there is hot water
Look under the sink and make sure there are no leaks while the water is running
Make sure the sink is caulked appropriately
Doors and Casing:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Open and close without sticking on jam
Open and close without rubbing on floor
Latches
Hardware installed correctly and securely
Screens on sliders
Baseboards:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Windows:
Open and close
Lock
Have screens (that are not ripped)
All areas where water can get in are caulked correctly and sealed
Backsplash:
Make sure all tiles are installed correctly
No loose tiles
No broken tiles
No chipped tiles
Make sure all grout lines are full
Check edges of backsplash and make sure all tile is smooth (no rough ends) and finished
Check seam of backsplash and cabinets and make sure grout is present and full
Make sure siliconized grout is used at the seam of the backsplash and the counter top
Floors:
Hardwood (New):
All glue cleaned up and not seeping threw seams
All joints tight
All T-bar moldings glued down completely with now glue visible
Hardwood (Existing):
All gaps filled correctly
Sealed correctly
Stained correctly
Tile:
Installed correctly
Grout lines filled correctly
No loose tiles
No broken tiles
No chipped tiles
BATHROOM 1:
Ceilings:
Ceiling texture complete and without imperfections
Ceiling drywall patches completed and without imperfections
Ceiling paint touch ups complete
Ceiling lights installed and operational with working light bulbs
Ceiling junction boxes covered with appropriately colored face plates
Walls:
Walls texture completed and without imperfections
Wall drywall patches completed and without imperfections
Wall touch up paint completed
Electrical:
All light switches installed correctly and securely (not loose or wiggly)
All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)
All outlets wired correctly and operational
Make sure GFCI’s are installed and operational
All lights work (bulbs installed)
Vanities:
All vanities installed correctly
All vanities open and close correctly
No scratches or dings on vanities or countertops
All vanity shelves installed (not just laying in cabinet)
Vanity hardware installed correctly
Drawers open and close properly
All vanities and drawers cleaned inside and out
Plumbing:
Turn on faucets on and make sure they runs properly
Make sure there is adequate water pressure at the faucet
Make sure there is hot water
Look under the sink and make sure there are no leaks while the water is running
Make sure stoppers work
Put stoppers down and fill sink then drain and make sure no leaks are underneath
Make sure the sink is caulked appropriately
Make sure to use siliconized grout around the tile surround and tub and tile floor and tub
Caulk all shower fixtures to prevent leaks
Make sure toilet is installed properly, caulked around the base, not moving, flushes and not leaks
Make sure all shower fixtures are installed properly and operational without leaks (make sure there is hot water)
Make sure tub stopper is operational
Fill tub above overflow and make sure there are no leaks
Once tub is full drain and make sure it drains appropriately
Doors and Casing:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Open and close without sticking on jam
Open and close without rubbing on floor
Latches
Hardware installed correctly and securely
Screens on sliders
Baseboards:
Caulked correctly
All nail holes filled and painted
Painted correctly
Joints caulked correctly and no visible seam
Windows:
Open and close
Lock
Have screens (that are not ripped)
All areas where water can get in are caulked correctly and sealed
Shower Surround:
Make sure all tiles are installed correctly
No loose tiles
No broken tiles
No chipped tiles
Make sure all grout lines are full
Check edges of shower surround and make sure all tile is smooth (no rough ends) and finished
Check seam of shower surround and tub and make sure there is siliconized grout
Floors:
Hardwood (Existing):
All gaps filled correctly
Sealed correctly
Stained correctly
Tile:
Installed correctly
Grout lines filled correctly
No loose tiles
No broken tiles
No chipped tiles
BATHROOM 2:
Ceilings:
Ceiling texture complete and without imperfections
Ceiling drywall patches completed and without imperfections