Job Completion Check List

Job Completion Check List

Job Completion Check List

Check list to be completed by contractor prior to CT Homes coming out for final punch list. CT Homes reserves the right to request more work to be completed that is not on this list.

EXTERIOR:

 Exterior body paint touch up complete

 Facia and eves termite damage repaired

 Facia and eves paint touch up complete

 Fence gates open and close properly without sticking or rubbing

 Pergola paint complete

 Top of pergola painted

 All hardware including bolts and hangers painted

 All exterior lights operational with working light bulbs

 Newly constructed fence is clear coated

 Deck painted or clear coated (based on SOW)

 All exterior doors painted properly and touched up

 All exterior doors open and close properly and latch

 All exterior doors hardware installed correctly

 Three keys made for front door

 No plumbing leaks from any exterior plumbing

LANDSCAPING:

 No dead spots in grass

 Sprinklers work and are not spraying house

 No dead plants

 Bark in planters has even covering and is not messy

 Yard cleaned and not messy

INTERIOR:

COMMON LIVING SPACES AND HALLS:

Ceilings:

 Ceiling texture complete and without imperfections

 Ceiling drywall patches completed and without imperfections

 Ceiling paint touch ups complete

 Ceiling lights installed and operational with working light bulbs

 Ceiling junction boxes covered with appropriately colored face plates

Walls:

 Walls texture completed and without imperfections

 Wall drywall patches completed and without imperfections

 Wall touch up paint completed

Electrical:

 All light switches installed correctly and securely (not loose or wiggly)

 All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)

 All outlets wired correctly and operational

Cabinets:

 All cabinets open and close correctly

 Cabinets painted correctly including inside (and clean)

 Cabinet hardware installed correctly

Doors and Casing:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

 Open and close without sticking on jam

 Open and close without rubbing on floor

 Latches

 Hardware installed correctly and securely

 Screens on sliders

Baseboards:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

Windows:

 Open and close

 Lock

 Have screens (that are not ripped)

 All areas where water can get in are caulked correctly and sealed

Floors:

Hardwood (New):

 All glue cleaned up and not seeping threw seams

 All joints tight

 All T-bar moldings glued down completely with now glue visible

Hardwood (Existing):

 All gaps filled correctly

 Sealed correctly

 Stained correctly

Carpet:

 All edges nailed down correctly

 Not loose anywhere

 No threads visible

 No stains

Tile:

 Installed correctly

 Grout lines filled correctly

 No loose tiles

 No broken tiles

 No chipped tiles

BEDROOM 1:

Ceilings:

 Ceiling texture complete and without imperfections

 Ceiling drywall patches completed and without imperfections

 Ceiling paint touch ups complete

 Ceiling lights installed and operational with working light bulbs

 Ceiling junction boxes covered with appropriately colored face plates

Walls:

 Walls texture completed and without imperfections

 Wall drywall patches completed and without imperfections

 Wall touch up paint completed

Electrical:

 All light switches installed correctly and securely (not loose or wiggly)

 All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)

 All outlets wired correctly and operational

Doors and Casing:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

 Open and close without sticking on jam

 Open and close without rubbing on floor

 Latches

 Hardware installed correctly and securely

 Screens on sliders

 Closet doors work properly

 Closet door hardware properly installed

 Closet door floor track installed

Baseboards:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

Windows:

 Open and close

 Lock

 Have screens (that are not ripped)

 All areas where water can get in are caulked correctly and sealed

Floors:

Hardwood (Existing):

 All gaps filled correctly

 Sealed correctly

 Stained correctly

Carpet:

 All edges nailed down correctly

 Not loose anywhere

 No threads visible

 No stains

BEDROOM 2:

Ceilings:

 Ceiling texture complete and without imperfections

 Ceiling drywall patches completed and without imperfections

 Ceiling paint touch ups complete

 Ceiling lights installed and operational with working light bulbs

 Ceiling junction boxes covered with appropriately colored face plates

Walls:

 Walls texture completed and without imperfections

 Wall drywall patches completed and without imperfections

 Wall touch up paint completed

Electrical:

 All light switches installed correctly and securely (not loose or wiggly)

 All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)

 All outlets wired correctly and operational

Doors and Casing:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

 Open and close without sticking on jam

 Open and close without rubbing on floor

 Latches

 Hardware installed correctly and securely

 Screens on sliders

 Closet doors work properly

 Closet door hardware properly installed

 Closet door floor track installed

Baseboards:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

Windows:

 Open and close

 Lock

 Have screens (that are not ripped)

 All areas where water can get in are caulked correctly and sealed

Floors:

Hardwood (Existing):

 All gaps filled correctly

 Sealed correctly

 Stained correctly

Carpet:

 All edges nailed down correctly

 Not loose anywhere

 No threads visible

 No stains

BEDROOM 3:

Ceilings:

 Ceiling texture complete and without imperfections

 Ceiling drywall patches completed and without imperfections

 Ceiling paint touch ups complete

 Ceiling lights installed and operational with working light bulbs

 Ceiling junction boxes covered with appropriately colored face plates

Walls:

 Walls texture completed and without imperfections

 Wall drywall patches completed and without imperfections

 Wall touch up paint completed

Electrical:

 All light switches installed correctly and securely (not loose or wiggly)

 All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)

 All outlets wired correctly and operational

Doors and Casing:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

 Open and close without sticking on jam

 Open and close without rubbing on floor

 Latches

 Hardware installed correctly and securely

 Screens on sliders

 Closet doors work properly

 Closet door hardware properly installed

 Closet door floor track installed

Baseboards:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

Windows:

 Open and close

 Lock

 Have screens (that are not ripped)

 All areas where water can get in are caulked correctly and sealed

Floors:

Hardwood (Existing):

 All gaps filled correctly

 Sealed correctly

 Stained correctly

Carpet:

 All edges nailed down correctly

 Not loose anywhere

 No threads visible

 No stains

BEDROOM 4:

Ceilings:

 Ceiling texture complete and without imperfections

 Ceiling drywall patches completed and without imperfections

 Ceiling paint touch ups complete

 Ceiling lights installed and operational with working light bulbs

 Ceiling junction boxes covered with appropriately colored face plates

Walls:

 Walls texture completed and without imperfections

 Wall drywall patches completed and without imperfections

 Wall touch up paint completed

Electrical:

 All light switches installed correctly and securely (not loose or wiggly)

 All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)

 All outlets wired correctly and operational

Doors and Casing:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

 Open and close without sticking on jam

 Open and close without rubbing on floor

 Latches

 Hardware installed correctly and securely

 Screens on sliders

 Closet doors work properly

 Closet door hardware properly installed

 Closet door floor track installed

Baseboards:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

Windows:

 Open and close

 Lock

 Have screens (that are not ripped)

 All areas where water can get in are caulked correctly and sealed

Floors:

Hardwood (Existing):

 All gaps filled correctly

 Sealed correctly

 Stained correctly

Carpet:

 All edges nailed down correctly

 Not loose anywhere

 No threads visible

 No stains

BEDROOM 5:

Ceilings:

 Ceiling texture complete and without imperfections

 Ceiling drywall patches completed and without imperfections

 Ceiling paint touch ups complete

 Ceiling lights installed and operational with working light bulbs

 Ceiling junction boxes covered with appropriately colored face plates

Walls:

 Walls texture completed and without imperfections

 Wall drywall patches completed and without imperfections

 Wall touch up paint completed

Electrical:

 All light switches installed correctly and securely (not loose or wiggly)

 All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)

 All outlets wired correctly and operational

Doors and Casing:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

 Open and close without sticking on jam

 Open and close without rubbing on floor

 Latches

 Hardware installed correctly and securely

 Screens on sliders

 Closet doors work properly

 Closet door hardware properly installed

 Closet door floor track installed

Baseboards:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

Windows:

 Open and close

 Lock

 Have screens (that are not ripped)

 All areas where water can get in are caulked correctly and sealed

Floors:

Hardwood (Existing):

 All gaps filled correctly

 Sealed correctly

 Stained correctly

Carpet:

 All edges nailed down correctly

 Not loose anywhere

 No threads visible

 No stains

KITCHEN:

Ceilings:

 Ceiling texture complete and without imperfections

 Ceiling drywall patches completed and without imperfections

 Ceiling paint touch ups complete

 Ceiling lights installed and operational with working light bulbs

 Ceiling junction boxes covered with appropriately colored face plates

Walls:

 Walls texture completed and without imperfections

 Wall drywall patches completed and without imperfections

 Wall touch up paint completed

Electrical:

 All light switches installed correctly and securely (not loose or wiggly)

 All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)

 All outlets wired correctly and operational

 Make sure GFCI’s are installed and operational

 All lights work (bulbs installed)

Cabinets:

 All cabinets installed correctly

 All cabinets open and close correctly

 No scratches or dings on cabinets

 All cabinet shelves installed (not just laying in cabinet)

 Cabinet hardware installed correctly

 Drawers open and close properly

 All cabinets and drawers cleaned inside and out

Appliances:

 Make sure all packaging material is removed from all appliances (inside and outside)

 Make sure all appliances are connected and running

 Run a full cycle in the dishwasher and make sure it drains properly (make sure there is no kink in the air gap line that could cause it to not drain)

 Make sure burners and oven are working

 Run microwave and hood

Plumbing:

 Turn on sink faucet and make sure it runs properly

 Make sure there is adequate water pressure at the faucet

 Make sure there is hot water

 Look under the sink and make sure there are no leaks while the water is running

 Make sure the sink is caulked appropriately

Doors and Casing:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

 Open and close without sticking on jam

 Open and close without rubbing on floor

 Latches

 Hardware installed correctly and securely

 Screens on sliders

Baseboards:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

Windows:

 Open and close

 Lock

 Have screens (that are not ripped)

 All areas where water can get in are caulked correctly and sealed

Backsplash:

 Make sure all tiles are installed correctly

 No loose tiles

 No broken tiles

 No chipped tiles

 Make sure all grout lines are full

 Check edges of backsplash and make sure all tile is smooth (no rough ends) and finished

 Check seam of backsplash and cabinets and make sure grout is present and full

 Make sure siliconized grout is used at the seam of the backsplash and the counter top

Floors:

Hardwood (New):

 All glue cleaned up and not seeping threw seams

 All joints tight

 All T-bar moldings glued down completely with now glue visible

Hardwood (Existing):

 All gaps filled correctly

 Sealed correctly

 Stained correctly

Tile:

 Installed correctly

 Grout lines filled correctly

 No loose tiles

 No broken tiles

 No chipped tiles

BATHROOM 1:

Ceilings:

 Ceiling texture complete and without imperfections

 Ceiling drywall patches completed and without imperfections

 Ceiling paint touch ups complete

 Ceiling lights installed and operational with working light bulbs

 Ceiling junction boxes covered with appropriately colored face plates

Walls:

 Walls texture completed and without imperfections

 Wall drywall patches completed and without imperfections

 Wall touch up paint completed

Electrical:

 All light switches installed correctly and securely (not loose or wiggly)

 All outlets installed correctly and securely (not loose or wiggly, half hot installed upside down)

 All outlets wired correctly and operational

 Make sure GFCI’s are installed and operational

 All lights work (bulbs installed)

Vanities:

 All vanities installed correctly

 All vanities open and close correctly

 No scratches or dings on vanities or countertops

 All vanity shelves installed (not just laying in cabinet)

 Vanity hardware installed correctly

 Drawers open and close properly

 All vanities and drawers cleaned inside and out

Plumbing:

 Turn on faucets on and make sure they runs properly

 Make sure there is adequate water pressure at the faucet

 Make sure there is hot water

 Look under the sink and make sure there are no leaks while the water is running

 Make sure stoppers work

 Put stoppers down and fill sink then drain and make sure no leaks are underneath

 Make sure the sink is caulked appropriately

 Make sure to use siliconized grout around the tile surround and tub and tile floor and tub

 Caulk all shower fixtures to prevent leaks

 Make sure toilet is installed properly, caulked around the base, not moving, flushes and not leaks

 Make sure all shower fixtures are installed properly and operational without leaks (make sure there is hot water)

 Make sure tub stopper is operational

 Fill tub above overflow and make sure there are no leaks

 Once tub is full drain and make sure it drains appropriately

Doors and Casing:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

 Open and close without sticking on jam

 Open and close without rubbing on floor

 Latches

 Hardware installed correctly and securely

 Screens on sliders

Baseboards:

 Caulked correctly

 All nail holes filled and painted

 Painted correctly

 Joints caulked correctly and no visible seam

Windows:

 Open and close

 Lock

 Have screens (that are not ripped)

 All areas where water can get in are caulked correctly and sealed

Shower Surround:

 Make sure all tiles are installed correctly

 No loose tiles

 No broken tiles

 No chipped tiles

 Make sure all grout lines are full

 Check edges of shower surround and make sure all tile is smooth (no rough ends) and finished

 Check seam of shower surround and tub and make sure there is siliconized grout

Floors:

Hardwood (Existing):

 All gaps filled correctly

 Sealed correctly

 Stained correctly

Tile:

 Installed correctly

 Grout lines filled correctly

 No loose tiles

 No broken tiles

 No chipped tiles

BATHROOM 2:

Ceilings:

 Ceiling texture complete and without imperfections

 Ceiling drywall patches completed and without imperfections