Annexure 2: Construction Site Inspection Report Dated: 16.02.2016
S.No / Ref No / Project Proponent / Name & Address of the Proposed Project / No of Notices Issued / Remarks1 / Ref-055 / Mr. A K Sharma(GM) Engineer), NBCC, / Redevelopment of East Kidwai Nagar GPRA Complex, New Delhi / Two notices have been issued and the penalty amount has also been duly submitted. /
- Active use of sprinklers and water hoses.
- Tarpaulin covering on cement basher unit.
- No protective gear (mask or gloves) were observed on the workers.
- Wind Breaker of requisite height are placed around the construction unit.
- Construction materials were observed to be left uncovered.
- Inadequate green mesh on the buildings.
- Construction waste was found lying open within the construction unit.
2 / Ref-101 / EE, South Western Division 1, DDA, Vasant Kunj, New Delhi / Construction of Group Housing Complex at 852 & 362(Cluster project), near Sultan Garhi Tomb at Vasant Kunj / Three Notices issued, yet to submit penalty for the 2nd and 3rd Notice /
- Water sprinkled only at the main gate entry point.
- Construction material left uncovered at the site.
- Earth dug out from the site and C& D waste was seen dumped on a nearby sewage line.
- No bay facility for cleaning/ hosing down tyres of the transportation vehicles was observed at the site.
- Inadequate green mesh on the buildings.
3 / Ref-147 / Mr. S K Sagar, AGM(Engg-Civil), M/s Airport Authority of India, Office of ED Engineering (Metro), Operational Offices Gurgoan Road / Construction of Indian Aviation Academy & Hostel Block(2 Plots) at Vasant Kunj, /near Indian Spinal Injury Center / Three Notices issued, yet to submit penalty for the 2nd and 3rd Notice /
- Wind breakers and Dust Barriers were inadequate and dilapidated.
- No water sprinkler or water hoses were observed at the site.
- Green mesh around the buildings were found lacking.
4 / Ref-162 / Chief Engineer (Civil), ONGC / Construction of corporate office by M/s ONGC Ltd, Office complex at Plot no 5A & 5B, Nelson Mandela Marg, Vasant Kunj, Phase- II. / Two Notices issued, penalty for the 2nd Notice is yet to be submitted /
- Wind breaker/ Dust barriers were not of the requisite height.
- Construction Material was left uncovered.
- Earth dug out from the site were dumped on the service road.
- No visible bay or specific site for washing of vehicles transporting construction material.
- No hosing of lose soil at entry points.
Note: None of the inspected construction sites completely followed the MoEF’s dust control guidelines.
Photographs of Redevelopment of East Kidwai Nagar GPRA Complex, New Delhi
Photographs of Construction of corporate office by M/s ONGC Ltd, Office complex at Plot no 5A & 5B, Nelson Mandela Marg, Vasant Kunj, Phase- II
Photographs of Construction of Group Housing Complex at 852 & 362(Cluster project), near Sultan Garhi Tomb at Vasant Kunj