PRM020/1

DEPARTMENT OF PUBLIC WORKS

INPUT OF ESTIMATE TYPE 3 TO 6 ON WCS

1.From main WCS menu select 5. Contract and Estimates and ENTER

2.Select 1. Contract and Estimates and ENTER

3.Select 4. Add/Modify Contract Estimates Types 3 to 6 (WD04PU) and ENTER:

Step 1: / WCS No and ENTER
Step 2: / Next-in-line Estimate type/no and ENTER
Step 3: / Change Contract descriptions if required and TAB
Step 4: / Revise Contract time if required and TAB (Contract time to include 35 days for submission and acceptance of sureties and handing over of site)
Step 5: / Revise Contract type if required and TAB
Step 6: / Estimate date (JJJJ/MM/DD)
Step 7: / Project to (tender) date (JJJJ/MM/DD)
Step 8: / Any short description, e.g. Erection/Repairs and Renovations.Etc. and TAB
Step 9: / Value of building work and TAB
Step 10*: / * for automatic calculation of VAT and TAB
Step 11: / Distribution code: The first field defaulted to 01. The other four fields will accept any of the following codes:
02= / Adjustment (In case of too high estimate, adjustment is the theoretical amount the estimate must be cut with to bring it inline with accepted limits
03= / CPAP (Contract Price Adjustment Provisions), If * is entered in amount column, CPAP is automatically calculated.
04= / Incidental expenditure (Default = R100 000)
05= / Building work (if field 01 was used for something else)
06= / Electrical work
07= / Mechanical work
08= / Civil work
09= / Sundry
11= / Training
Step 12: / If description is that of values 02 - 09, the system will default to description, TAB
Step 13: / Value of work for particular field, TAB
Step 14*: / * for automatic calculation of VAT
Step 15: / ENTER ® RECORD(S) SUCCESSFULLY PROCESSED

4.Enter F2 to return to Contract and Estimates Menu:

Step 1: / Select 1 Add/Update: Estimates and ENTER
Step 2: / As WCS No and Estimate type already on WCS, ENTER
Step 3: / If estimate date correct, TAB
Step 4: / Cost Limit Y/N, TAB
Step 5: / Enter cost limit amount, TAB
Step 6: / Enter Building estimate (PQS fee purposes) - 80% of Building work excl VAT, CPAP,TAB
Step 7: / Space limit Y/N, TAB and
Step 8: / Building estimate date (JJJJ/MM/DD)
Step 9: / Estimate complete Y, ENTER

Estimate now ready to be accepted by financial/budget section and must be submitted as such to them.

PRM020/2

STEP 15

OPWWBSPUBLIC WORKS: ELECTRICAL ENGINEERS97-07-15 12:17

WD04PUADD/MODIFY CONTACTS & ESTIMATE TYPES 3 TO 6WD04PUE1

STEP 1

------

WCS-number: 010819 H KZN(CAT)4DESIGN STAGE

PIETERMA,,NAPIERVILLE PRI, 9 DWELLINGS, 82 FLATS AND SINGLE QUARTERS FOR 129

Contract number: 0002

Contract Afr desc: ELEKTRIESE INSTALLASIE

Contract Eng desc: ELECTRICAL INSTALLATION STEP 3

Service type: HBWGH

Division code: 110 - ELECTRICAL ENGINEERSSTEP 5

Contract time STEP 4: 30.00 months*Contract type: 3 - COMPREHENSIVE CO

STEP 2:35 DAYS

Estimate type/no: 5 / 02 PRE-TENDER ESTIMATEFile no:

Estimate date: 1997/04/02 STEP 6Project to date:1997/03/01step 7

Captured: BEAURAIN CUpdated:Update date:

*DISTR. CODE AND DESCRIPTION AMOUNT STEP 9 VATTOTAL

01ELECT INSTALLATION STEP 8 2180543.00305276.022485819.02

step 11 TOTAL :...... 2180543.00305276.022485819.02

03CPAP ______STEP 12 235157.93 STEP 13 30270.17 STEP 14 265428.10

**GRAND TOTAL:24157000.93335546.192751247.12

**PROJECTED: 2421455.13336345.462757800.59

______

______

______

______

PRM020/3

CONTRACT TYPES5 12:17

1.1CONTRACT04PUE1

2.2NOMINATED SUB-CONT

3.3COMPREHENSIVE CONT DIRECT CONTRACT

4.4SUPPLY-SERVICE (ORFOR 129

5.

6.

7.

8.

9.

10.SIVE CO

11.

12.

13.

AL

CHOICE: 0--5819.02

START: 1------5819.02

5428.10

**GRAND TOTAL:2415700.93335546.19 2751247.12

**PROJECTED:2421455.13336345.46 2757800.59

______

Enter-PF1---PF2---PF3---PF4---PF5---PF6---PF7---PF8---PF9---PF10---PF11---PF12----

EXIT

PRM020/4

OPWWBS PUBLIC WORKS: ELECTRICAL ENGINEERS97-07-15 12:16

WD01PU STEP 1 ADD/UPDATE: ESTIMATES (MAIN SCREEN AND SUMMARY) WD01PUE1

STEP 2

------

WCS-Number: 010819 H KZN(CAT)4DESIGN STAGE

PIETERMA,,NAPIERVILLE PRI, 9 DWELLINGS, 82 FLATS AND SINGLE QUARTERS FOR 129

Service type: HBWGH ERECTION : HOUSING (BILLS OF Q Contr. Time: __30.00 mt

Division code: 110 ELECTRICAL ENGIFile number: 6221/0313/4P

Estimate Type/No: 5 / 02 PRE-TENDER ESTIMATE

Estimate date: 1997/04/02 STEP 3Projected to: 199703 YYYY/MM

Estimate amount: 30432247.14Projected amount: 30504736.75

Nett Div. Amount: 2751247.12Div. Estimate project: 2757800.59

TSM approved: SCU approved:

GSM approved:

SATISFY STEP 4AMOUNT FOR-

Cost limit Y / N: NSTEP 5Building est. VAT ecxl: STEP 6

Space limit Y / N: NSTEP 7Building est. Date: STEP 8

Estimate complete: NSTEP 9Complete date:

Estimate accepted: NAccepted date:

Comments: Captured: BURGER MUpdated: BEAURAIN C Date: 97/04/07

------