Independent Engineer

CDM Smith Inc

In Joint Venture with

Wilbur Smith Associates Pvt.Ltd.

1.EXECUTIVE SUMMARY

The Government of India (GOI) through Ministry of Shipping Road Transport & Highways (MOSRT & H) is contemplating to enhance the traffic capacity and safety for efficient transportation of goods as well as passenger traffic on the heavily trafficked National Highways. The Government of India had entrusted National Highways Authority of India (NHAI) for the development, maintenance and management of National Highway No.9 (NH-65) including section from Km 348.800 to Km 493.000 (144.200Km) in the states of Karnataka and Andhra Pradesh and from km 348.800 to km 423.800 (75Km) in the state of Karnataka and from Km 423.800 to Km 493.000 (69.200 Km) in Andhra Pradesh.

The project stretch passes through four major towns Sanagareddy, Sadasivpet, Zaheerabad in Andhra Pradesh state and Humnabad in Karnataka state. Bypasses of total length 18.925 Km are proposed for Sadasivpet, Zaheerabad and Mannaekhelli towns. New two lane service roads of width 7.000 m are proposed near the settlement areas. Total length of service road is 41.572 km including both sides. The project stretch crosses two major railway lines one in Zaheerabad and one in Humnabad. There are three major bridges and 47 minor bridges along the project stretch. 7 Flyover/Vehicle Underpasses and 14 Pedestrian Underpasses are newly proposed. Project facilities include 2 Toll plazas, 2 Truck lay Byes, 18 Bus bays and 2 Rest Areas.

In order to provide a better level of service to the vehicular traffic and to augment the capacity of NH-9 by widening the existing 2 lane to 4 lanes divided carriageway facility including strengthening of the existing 2 lane, it has been decided to carry out the works on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis Under NHDP, Phase-III.

2.SCOPE OF THE PROJECT

The scope of the project shall include the following during the concession period:

  • Construction of the project highway on site as set forth in Schedule–A and as specified in Schedule–B together with provision of Project Facilities as specified in Schedule–C and standards as set forth in Schedule–D of the Concession agreement.
  • Operation and Maintenance of the project highway in accordance with the provisions of the concession agreement.
  • Performance and fulfillment of all other obligations in accordance with the provisions and matters incidental thereto or necessary for the performance of any or all of the obligations of the concession agreement by the Concessionaire.
  1. PROJECT MILE STONES(SCHEDULE-G)

Project Mile Stone – I:Project Mile Stone – I shall occur on the date falling on the 180th day from the Appointed Date i.e. 01.04.2014. Prior to the Project Mile Stone – I, the Concessionaire shall have commenced construction of the Project Highway and expended not less than 10% of the total capital cost set forth in the Financial Package i.e. Rs. 12.66 Crores.

MILE STONE ACHIEVED

Comment of IE:Utility Shifting is in Progress.

2nd Mile Stone:400 days from appointed date i.e. 01-04-2015 – 30% of Project Cost Rs. 507 Crores, shall have started all bridges.

Comment of IE:Nil

3rd Mile Stone:650 days from appointed date i.e. 01.04.2014. To be expended 70% of the Project Cost i.e. 887 Crores and shall have commenced all Project facilities.

Comment of IE:Nil

Scheduled Four-Laning Date: The Scheduled Four Laning date i.e., 11-10-2016 shall occur on the [910th (Nine Hundred and Ten) day from the appointed date.On or before the Scheduled Four laning date, the Concessionaire shall have completed Fourlaningin accordance with this Agreement.

Comment of IE: Nil

Extension of Time (EOT): Nil

  1. SALIENT FEATURES AS PER C.A

The Authority / National Highways Authority of India (NHAI)
Name of the Project / Four Laning of Maharashtra/Karnataka
Sangareddy Section of NH-9 from Km 348.800 to Km 493.000 in the States
Of Karnataka and Andhra Pradesh to be executed as BOT (Toll) on DBFOT
Basis under NHDP Phase-III
Independent Engineer (IE) / CDM Smith Inc. In Joint Venture with Wilbur Smith Associates Pvt.Ltd.
Agreement No. of IE / Package No. Kar /Phase-III/IC-3/2011-12
Date of start as per contract of IE / 02-02-2013
The Concessionaire / M/s L&T Deccan Tollyways Limited Subsidery of L&T IDPL Chennai (TN)
The EPC Contractor / M/s L&T ECC IC
Date of agreement / 2ndFebruary – 2012
Period of Construction / 30 Months (910 days from the appointed date)
Date of Commencement of
Construction (appointed date) / 01st April 2014
Date of Completion of
Construction / 11th Oct 2016
The Concession Period / 25 Years(Including Construction period)
Project Cost / 1266.60 Crores
Total Financial Package cost / Crores
EPC Cost / Crores
Project Length / 144.200 Kms (As per Existing Chainage)
Financial close date / 27.06.2012
Execution of Escrow agreement
Date of submission of Performance Security / 09.05.2012 (5% of the project Cost Amount: Rs63.33 Crores.)
Lenders Name / Bank of Baroda
Lenders Contribution / 60% of the PC
Grant from NHAI (Equity support) / Nil
Contribution by Concessionaire / 40%
Date of Appointment of Safety Consultant / Yet To Be
Safety Consultant / Nil
ROB / 1 Nos
Vehicular Under Passes/Flyovers / 7Nos
Pedestrian Under Passes / 21 Nos
Toll Plaza / 2 Nos
Major Bridges / 6 Nos (3 New and 3 Rehab.)
Minor Bridges / 47 Nos (New 12 Nos., 32 rehab, re con 3)
Box Culverts / 248Nos (Kar 134 Nos, AP 114 Nos)
Pipe Culverts
At grade Intersections / 53 Nos (Major 21, Minor 32)
Length of Service Road / 2x21.250 Kms (Kar2x9.2 Kms, AP 2x12.05 Kms)
Bus Lay Byes / 18Nos
Bypasses / 3Nosof 18.925 Kms(Karnataka 1 and AP 2 Nos)
  1. PROJECT HIGHWAY PAVEMENT CONFIGURATIONS

Scope of Work and Cross Sections: Project Divided in to three Homogeneous Sections

Description / Scope / Design Chainage(Km)
From / To / Length
Section – 1 / MH/KAR to Zaheerabad / 348.800 / 438.400 / 89.600
Section – 2 / Zaheerabad to Kamkol / 348.400 / 467.000 / 26.600
Section – 3 / Kamkol to Sangareddy / 467.000 / 493.000 / 26.000

Pavement Configurations Main Carriageway (Recommended Thickness)

Chainage (Km) / Section
Length (Km) / New Pavement
Design msa / CBR (%) / BC(mm) / DBM
(mm) / Base Course
WMM (mm) / Sub Base
GSB (mm) / Sub Grade
(mm)
VG-30
From / To / 10 Years / 23 Years / 10 Years msa
(2014-2024) / 23 Years msa(2014-2037)
348.800 / 438.400 / 89.600 / 21 / 67 / 12 / 40 / 60 / 250 / 200 / 500
438.400 / 467.000 / 28.600 / 22 / 71 / 40 / 60 / 250 / 200 / 500
467.000 / 493.000 / 26.000 / 46 / 150 / 40 / 95 / 250 / 200 / 500

Service Road (Recommended Thickness)

S. No. / Pavement Composition / Design
Thickness (mm) / Total
Thickness
(mm)
1 / Semi Dense Bituminous Concrete (SDBC) / 25 / 475
2 / Dense Bituminous Macadam (DBM) / 50
3 / Base Course (WMM) / 250
4 / Sub-base (GSB) / 150
5 / Sub grade with min 12% CBR / 500 / 500

Rigid Pavement for Toll Plaza (Recommended Thickness)

Rigid Payment design submitted by Concessionaire and IE has reviewed & commented about the report as per the IRC: SP: 84-2009.

Pavement composition details for rigid pavement in KARAP Section:

Sl.No. / Parameters / Pavement composition
1 / PQC(M-40) / 240 mm
2 / DLC (M-10) / 150 mm
3 / Polythene sheet / 125 micron
4 / GSB / 150 mm
5 / Sub grade with 10% CBR / 500 mm
6 / Contraction & Longitudinal spacing / 4.0 m
7 / Dowel Bar Diameter / 32 mm
8 / Length of dowel bar / 450 mm
9 / Spacing of dowel bar / 240 mm
10 / First dowel bar from pavement edge / 150 mm
11 / Diameter of tie bar (Deformed) / 12 mm
12 / Spacing of tie bar (Deformed) / 490 mm
13 / Length of tiebar (Deformed) / 640 mm
14 / Maximum Panel size considered in the design / 4m x4m

TYPICAL CROSS SECTIONS ADOPTING (Following at site):

TCS TYPE / Cross section details / Drawing No. / Revision
TYPE–I / Typical Cross Section for Eccentric Widening in Rural area / 012156-C-RP-RD-TC-0001 / A
TYPE–IIA / Typical Cross Section for Eccentric Widening in Rural area / 012156-C-RP-RD-TC-0001 / A
TYPE–IIB / Typical Cross Section for Eccentric Widening in Rural area / 012156-C-RP-RD-TC-0001 / A
TYPE-V / Typical Cross Section for Concentric Widening with Service Road in Urban area (4.5m Median) / 012158-C-RP-RD-TC-0002 / A
TYPE–VI / Typical Cross Section for Concentric Widening with Service Road in Urban area (2.0m Median) / 012158-C-RP-RD-TC-0003 / A
TYPE–VIB / Typical Cross Section for Left side Widening with Service Road in Urban area in Urban area (2.0m Median) / 012158-C-RP-RD-TC-0004 / A
TYPE-VIC / Typical Cross Section for Right side Widening with Service Road in Urban area in Urban area (2.0m Median) / 012158-C-RP-RD-TC-0005 / A
TYPE–VII / Typical Cross Section at Approach ramps for Flyovers/VUP’s/PUP’s/ROB’s) / 012158-C-RP-RD-TC-0006 / A
TYPE-VIIA / Typical Cross Section at Approach ramps with 50m PROW (Height up to 1.75m) / 012158-C-RP-RD-TC-0010 / PA
TYPE-VIIB / Typical Cross Section at Approach ramps with 50m PROW (Height > 1.75m)
TYPE-VIIC / Typical Cross Section at Approach ramps with 60m PROW (Height up to 3.00m) / 012158-C-RP-RD-TC-0011 / PA
TYPE-VIID / Typical Cross Section at Approach ramps with 50m PROW (Height > 3.00m)
TYPE–VIII / Typical Cross Section for Re Alignment / Bypass Sections) / 012158-C-RP-RD-TC-0007 / A
TYPE–IX / Typical Cross Section for at approaches of PUP (Without Service Road) / 012158-C-RP-RD-TC-0008 / A
TYPE-XA / Typical Cross Section for Super Elevated Section without Service Road / 012158-C-RP-RD-TC-0009 / PC
TYPE–XB / Typical Cross Section for Super Elevated Section with Service Road
[IE’s MPR, May -2014] / Page 1

Independent Engineer

CDM Smith Inc

In Joint Venture with

Wilbur Smith Associates Pvt.Ltd.

6. PROJECT LOCATION MAP

[IE’s MPR, May -2014] / Page 1

Independent Engineer

CDM Smith Inc

In Joint Venture with

Wilbur Smith Associates Pvt.Ltd.

7. STATUS OF MOBILIZATION OF INDEPENDENT ENGINEER (IE)

SI
No / Name / Designation / Date
Mobilized
Key Personnel (Professional Staffs)
1 / Mr. WH SusilPriyantha / Team Leader / 01.06.2013
2 / Mrs. PremaKumari / Sr. Bridge Design Engineer
3 / Mr. AmarenderMallepaka / Resident cum Highway Engineer -1 / 01.04.2013
4 / Mr. Atul JSakharkar / Resident cum Highway Engineer -2 / 05.04.2013
5 / Mr. Gagan Trivedi / Highway Design Engineer – 1 / 18.03.2013
6 / Mr. Jimmy Thamos / Highway Design Engineer – 2 / -
7 / Mr. T. Linga Murthy / Bridge / Structural Engineer / 18.03.2013
8 / To Be Named (TBN) / Sr. Pavement Specialist / 18.03.2013
9 / Mr. SK M.M. Ahammad / Sr. Quality cum Material Expert / 18.03.2013
10 / Mr. VittalPuvvada / Traffic & Transportation Expert / 18.03.2013
11 / To be named (TBN) / Road Safety Expert
12 / Mr. M. Shankar Narayanan / Financial Expert
13 / Mr. J. Dhanvandh / Legal Expert
Sub-Professionals
1 / To be named (TBN) / Survey Engineer-1
2 / To be named (TBN) / Survey Engineer-2
3 / To be named (TBN) / Survey Engineer-3
4 / To be named (TBN) / Survey Engineer-4
5 / To be named (TBN) / Asst. Highway Engineer-1
6 / To be named (TBN) / Asst. Highway Engineer-2
7 / To be named (TBN) / Asst. Highway Engineer-3
8 / To be named (TBN) / Asst. Highway Engineer-4
9 / To be named (TBN) / CAD Expert-1
10 / To be named (TBN) / CAD Expert-2
11 / To be named (TBN) / Environmental Engineer
12 / To be named (TBN) / Asst. Bridge Engineer-1
13 / To be named (TBN) / Asst. Bridge Engineer-2
14 / To be named (TBN) / Asst. Bridge Engineer-3
15 / To be named (TBN) / Asst. Bridge Engineer-4
16 / To be named (TBN) / Asst. Quality cum Material Engineer-1
17 / To be named (TBN) / Asst. Quality cum Material Engineer-2
18 / To be named (TBN) / Asst. Quality cum Material Engineer-3
19 / To be named (TBN) / Asst. Quality cum Material Engineer-4
20 / To be named (TBN) / Electrical Engineer-1
21 / To be named (TBN) / Electrical Engineer-2
22 / To be named (TBN) / HTMS/ Toll Expert
23 / To be named (TBN) / HTMS/ Toll Expert
24 / To be named (TBN) / Quantity Surveyor -1
25 / To be named (TBN) / Quantity Surveyor -2
26 / To be named (TBN) / Horticulture cum Landscaping Expert
27 / To be named (TBN) / Horticulture cum Landscaping Expert
[IE’s MPR, May -2014] / Page 1

Independent Engineer

CDM Smith Inc

In Joint Venture with

Wilbur Smith Associates Pvt.Ltd.

[IE’s MPR, May -2014] / Page 1

Independent Engineer

CDM Smith Inc

In Joint Venture with

Wilbur Smith Associates Pvt.Ltd.

8.0 INSPECTION AND MONITORING OF THE CONSTRUCTION WORKS.

8.1 Progress up to 31-05-2014 as per MIS

Data collected from Concessionaire

SI No / Description / Target % / Achieved % / Ahead /- Behind %
1 / Physical Progress / Nil / Nil / Nil

Cumulative Physical Progress as per MIS:

Data collected from Concessionaire Nil

Cumulative Financial Expenditure as per MIS:

Data collected from Concessionaire (as per Statutory Auditors certificate) Nil

[IE’s MPR, May -2014] / Page 1

Independent Engineer

CDM Smith Inc

In Joint Venture with

Wilbur Smith Associates Pvt.Ltd.

8.2. ACHIEVEMENT of PHYSICAL TARGETS FOR 2013 – 2014 -Nil-

STATUS OF DESIGN & DRAWINGS OF HIGHWAY AND STRUCTURES AS ON 31.05.2014

Summary of Design Review As on14/05/2014
Legend:
UNR / Submitted by Concessionaire & Reply pending
PWC / Reviewed by IE & Waiting for Concessionaire Reply
REC / Review Completed
GFC / GFC Submitted by Concessionaire for approval
APP / Approved GFC
Sl. No / Design Category / Section / Unit / Total Scope / Submitted / Balance to be submitted / UNR / PWC / REC / GFC / APP / % Submitted / % Review
completed
over
Submittal / % Review completed over Total Scope
1 / Horizontal Alignments / Karnataka / KM / 75 / 75 / 0 / 28 / 0 / 46 / 0 / 0 / 100%
Andhra Pradesh / KM / 70 / 70 / 0 / 1 / 15 / 38 / 16 / 0 / 100%
Total / 145 / 145 / 0 / 100%
2 / Plan & Profile main Carriageway / Karnataka / KM / 75 / 75 / 27 / 45 / 0 / 0 / 0 / 100%
Andhra Pradesh / KM / 70 / 70 / 0 / 16 / 54 / 0 / 0 / 0 / 100%
Total / 75 / 75
3 / Plan & profile Service Roads / Karnataka / KM / 27 / 0 / 0 / 0 / 0
Andhra Pradesh / KM / 25 / 0 / 0 / 0 / 0
4 / Alignment shift / Karnataka / 7 / 0 / 0 / 0 / 0
Andhra Pradesh / 4 / 0 / 0 / 0 / 0
5 / Typical Drawings / 3 / 0 / 0 / 0 / 0
6 / Typical Cross Sections / 0 / 11 / 0 / 0 / 0
7 / Pavement Design reports / 2 / 0 / 0 / 0 / 0
8 / Investigation Reports / 3 / 0 / 0 / 0 / 0
9 / Project concern Reports / 1 / 1 / 2 / 0 / 0
[IE’s MPR, May -2014] / Page 1

Independent Engineer

CDM Smith Inc

In Joint Venture with

Wilbur Smith Associates Pvt.Ltd.

Structures:

Sl. No / Design Category / Section / Unit / Total Scope / Submitted / Balance to be submitted / UNR / PWC / REC / GFC / APP / % Submitted / % Review completed over Submittal / % Review completed over Total Scope
1 / Major Bridges / Karnataka / Nos. / 1 / 0 / 1
AP / Nos. / 2 / 0 / 2
Total / Nos. / 3 / 0 / 3
2 / Minor Bridges / Karnataka / Nos. / 25 / 25 / 0 / 15 / 10 / 0 / 0 / 0 / 100%
AP / Nos. / 22 / 20 / 2 / 14 / 6 / 0 / 0 / 0 / 91%
Total / Nos. / 47 / 45 / 2 / 29 / 16 / 0 / 0 / 0
3 / ROB/RUB / Karnataka / Nos. / 1 / Not Required
AP
Section / 1 / 1 / 1
Total / Nos. / 2 / 0 / 0
4 / Fly Over Bridges/VUP / Karnataka / Nos. / 4 / 1 / 3 / 1 / 0 / 0 / 0 / 0
AP
Section / Nos. / 3 / 0 / 3 / 0 / 0 / 0 / 0 / 0
Total / Nos. / 7 / 1 / 6 / 1 / 0 / 0 / 0 / 0
5 / Pedestrain Under Passes / Karnataka / Nos. / 7 / 7 / 0 / 0 / 7 / 0 / 0 / 0
AP
Section / Nos. / 7 / 7 / 0 / 0 / 7 / 0 / 0 / 0
Total / Nos. / 14 / 14 / 0 / 0 / 14 / 0 / 0 / 0
6 / Hume Pipe Culverts / Karnataka / Nos. / 94 / 77 / 17 / 0 / 0 / 0 / 0 / 0
AP
Section / Nos. / 65 / 53 / 12 / 0 / 0 / 47 / 0 / 0
Total / Nos. / 159 / 130 / 29 / 0 / 0 / 47 / 0 / 0
7 / Box/Slab Culverts / Karnataka / Nos. / 19 / 7 / 12 / 7 / 0 / 0 / 0 / 0
AP
Section / Nos. / 49 / 48 / 1 / 15 / 33 / 0 / 0 / 0
Total / Nos. / 68 / 55 / 55 / 55 / 55 / 55 / 55 / 55 / 55

8.4 Construction Program: Appointed Date taken by the Concessionaire i.e. 01.04.2014 but still they have not started any Physical activity at Site.

8.5 Construction Safety

Work not yet commenced

8.6 Method Adopted in Construction.

Work not yet commenced

8.7 Conformity of Construction Works

8.8 Defects and Deficiencies

8.9. Non Conformance Reports (NCRs) (Refer Pg No.101-104)

Month Wise status of NCRs
Month / Issued / Closed / Balance

8.10. Maintenance of the Existing 2- lane highway

8.11. Road Accident Report

8.12. Survey Works

8.13.Review and Concurrence of Materials

8.14. Requests for Inspection (RFI)

RFIs are being taken care of by field staff of IE regularly.

8.15Physical Works Programme

The concessionaire has submitted the physical work programme with S-curve and target and achievements. Concessionaire is advised to submit the work programme with break up particulars in details at the earliest.

8.16Planned Weightage Physical Progress.

8.17 Progress Report from the Concessionaire

8.18Dignitary’s Site Visit

8.19 Completed Bituminous Concrete(BC)March– 2014.

8.20. IE Factory Visit Report:

IE visitedPipes manufacturing unit at Nagpur two times in the month of April’13 and July’13.

8.21. Supply of Video Recording

Concessionaire Started video recording of Existing Road both sides

8.22. TollPlazas: 2 Toll Plazas

9.0 Progress of Road Works: Nil

10. LAND ACQUISITION and UTILITY SHIFTING

Data collected from Concessionaire

Total area required for the Project: - 920 Ha.
KAR- Ha / AP- Ha
Concerned Department / Activity / Month / Possession Handed over area in Sqm / Cumulative Possession Handed over area in Sqm. / % of Land Handed over / Remarks
Andhra Pradesh / Tamil Nadu / Total in Ha. (a+b)
Revenue Department / Land acquisition
Total / Ha
Obstructions due to Utilities
Description / KAR Section / A.P Section / Total / Remarks
Electrical Poles / Lines / Km / Km / Km.
Water Pipe Lines / Sewer Lines. / Km / Km / Km.
Land Pending Issues / As per Site condition as on 31/05/2014
S. no / Chainage in km / Length in m / Village Name / Reason / Remarks / Length in m. (Clear)
From / To
Total
Length affected due to LA Problems

Toll Plaza

Sl.
No. / Chainage / Length in m / Village Name / Reason
From / To

Wayside Amenities

Sl.
No. / Chainage / Length in m / Village Name / Reason
From / To
1
2

Approved Estimates pending for shifting of various utilities and payment of supervision charges.

In KAR section from Km 348.800 to Km. 423.800:

In AP section from Km 423.800 to Km 493.800

1. Shifting of Electrical Poles/Lines from Km

2. Shifting of Water Supply lines, Bore Wells etc.

LIST OF RELIGIOUS STRUCTURES IN BOTH SECTION.

SL.NO / Proposed Chainage / Types of Structure / Mandal / Status
LHS / RHS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
LIST OF RELIGIOUS STRUCTURES IN T.N SECTION
SL.NO / Proposed Chainage / Types of Structure / Status
LHS / RHS

11. Progress of Structures up to May-2014

The Concessionaire continued to work on structures both in Karnataka and Tamil Nadu sections.

KAR Sections
Description / 4-LANE / 2 – LANE
Total / Completed / In progress / Yet to start / Total / Completed / In progress / Yet to start
LHS / RHS / LHS / RHS / LHS / RHS / LHS / RHS
Box Culvert
Slab Culverts
(Widening)
Pipe Culverts
(Widening)
Minor Bridges
Major Bridges
ROB
VUP
PUP
KAR Section
Description / 4-LANE / 2 – LANE
Total / Completed / In progress / Yet to start / Total / Completed / In progress / Yet to start
LHS / RHS / LHS / RHS / LHS / RHS / LHS / RHS
Box Culvert
Slab Culverts
Minor Bridges
Major Bridges
ROB
VUP
PUP

12. Progress of Quality Control Report of May – 2014 KAR Section

13. Weather Report ofMay -2014 - KAR Section

Data collected from Concessionaire.

WEATHER & RAIN FALL REGISTER FOR THE MONTH OF MARCH- 2014
S.No. / Date / Temperature / Humidity
(%) / Rain Fall in mm / Weather / Remarks
Max (oC) / Min (oC)
1 / 01-May-14
2 / 02-May-14
3 / 03-May-14
4 / 04-May-14
5 / 05-May-14
6 / 06-May-14
7 / 07-May-14
8 / 08-May-14
9 / 09-May-14
10 / 10-May-14
11 / 11-May-14
12 / 12-May-14
13 / 13-May-14
14 / 14-May-14
15 / 15-May-14
16 / 16-May-14
17 / 17-May-14
18 / 18-May-14
19 / 19-May-14
20 / 20-May-14
21 / 21-May-14
22 / 22-May-14
23 / 23-May-14
24 / 24-May-14
25 / 25-May-14
26 / 26-May-14
27 / 27-May-14
28 / 28-May-14
29 / 29-May-14
30 / 30-May-14
31 / 31-May-14
Rainfall (mm) / Nil

Weather Report of May -2014 –A.P. Section

Data collected from Concessionaire.

WEATHER & RAIN FALL REGISTER FOR THE MONTH OF MAY- 2014

S.No / Date / Temperature / Humidity (%) / Rain Fall in mm / Weather / Remarks
Max (oC) / Min (oC)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Rainfall (mm) / Nil

14. PLANTS AVAILABLE AT SITE:

PLANTS IN KAR SECTION

Sl.
No. / Description / Nos. / Status
1
2
3
4
5
PLANTS IN ANDHRA PRADESH SECTION
Sl.
No. / Description / Nos. / Status
1
2
3
4
5
6

15. COMMENTS OF TEAM LEADER:

16. ANNEXURES:

[IE’s MPR, May -2014] / Page 1