In India, there are 11 lac government schools and almost 16 cr. kids are studying in these schools. Out of these schools, 47% of the schools do not have toilets for girls; which force them to defecate in open or wait till they get home; and schools which have girls’ toilet, 61% of those lack privacy. Almost 32% toilets are non functional. This is an extremely poor scenario and leads to all macro level problems related to education and community in India.

So far, Yuva Unstoppable has transformed 250 government schools across India and our target is 2,000 for 2016.

Impact measured by IIM Ahmedabad

(Asia’s No. 1 Management Institute)

Impact Measurement parameters / Before / After
Out of 10 / Out of 10
Satisfaction with the ambience of school / 3.8 / 8.9
Comfort level (Classroom, playground, eating area) / 3.6 / 8.4
Usability of space (Playground, eating area) / 1.6 / 8.9
Overall hygiene level of the school / 4.0 / 8.9
Privacy in washrooms / 2.8 / 8.8
Benefits in education due to availability of resources / 3.7 / 9.3

Looking forward to build Unstoppable India together.

Regards,

Amitabh Shah

Founder, Yuva Unstoppable

EMAIL- ; PHONE NUMBER - +91 9825047457

(Audited by KPMG and Impact Measurement by IIM – Ahmedabad)

www.yuvaunstoppable.org

How do we use your donation?

Transformation Blueprint

Yuva Unstoppable will utilize the allocated funds in the following areas. Sanitation being the first priority followed by access to water facilities and last being the campus renovations.

S. No. / Priority Wise Particulars / What we do? / Amount
1. / SANITATION / ·  Renovation / New Construction of Toilets of boys and girls
·  Providing and cleaning drainage
·  Lavatories
·  Buckets
·  Basins for hand washing
·  Leveling and repairing the tiling
·  Getting doors and pipelines in working condition
·  Windows
·  Adequate flow of water in taps and flush etc.
·  Others
*Cost may vary in upgradation, renovation and new built-up / INR 3,50,000
Or
$5,800
2. / IMPROVEMENT IN ACCESS OF WATER AND CAMPUS RENOVATION
/ WATER TANK
·  Involves cleaning tiling and repairing of the water tanks
DRINKING WATER AREA
·  Repairing or replacing broken or leaking taps
·  Drainage clogging
·  Separating drinking water area from dishwashing area
·  Tiling
WATER PURIFIER OR RO (as per the need)
DISH WASHING AREA
·  Repairing or replacing broken or leaking taps
·  Drainage clogging, tiling, and so on
CAMPUS RENOVATION
·  Plaster in classrooms
·  Color work in classrooms and campus
·  Provision of fabrication shade
·  Educational paintings or slogans in campus and classrooms / INR 1,50,000
Or
$2,500

Maintenance Intervention & Behavioural Change

S. No. / Particulars / Details / Amount
1. / SUPERVISION after the renovation / ·  10% Supervision charge of Yuva Unstoppable team
·  An official, a supervisor, is recruited to oversee the maintenance for 2 years
·  Training session (WASH) designed by UMC of Health and Hygiene for sweeper and students will be conducted once
·  Experts shall provide training to improve self-esteem, pride for school & basic civic rules shall be provided to children, teachers & sweepers
·  Additional stipend may be given to sweepers
·  Contingency fund shall be maintained if any funds remain unutilized / INR 1,00,000
Or
$1,700

The Evolution Blueprint requires a total sum of INR 6 Lakh or $10,000 from a corporate per school.

We ensure maximum output from a minimum input!

*The costs and bifurcation are a rough estimate and can vary according to the individual requirements of the school.

*Allocation of fund are done on priority basis,priority wise particulers are mentioned in blueprint.

Chart presenting our blueprint