FermilabTechnicalDivision
ES-298031RevA
HeliumLeakDetectorOperation,CalibrationandMaintenanceProcedures
Initiatedby Frank Juravic Jr.Date10/29/01
ApprovedbyTed BealeDate10/29/01
HeliumLeakDetector
Operation,CalibrationandMaintenanceProcedures
Purpose
Thepurposeofthisprocedureistoprovidetheheliumleakdetectoroperatorwithanoverviewofoperationrequirements,calibration,andmaintenanceofleakdetectorsfortheTechnicalDivision.It,alsoincludes,Fermilab’sengineering specificationspertainingtotheheliumleakcheckrequirements,weldingprocedures, etc...Thisisintendedforanoperator'sreferencenottraining.
Preface
ITheleakdetectorsystemthatisusedatFermilabevolvedfromthe needtopumponvarioussizedvolumeswithanassortmentoffixturing,toprotectthesuperconductingmagnetsfromoilbackstreamingfromtheroughingpumpandtoreducethepermeationofhelium.
ITheleakdetectorsystemconsistsofaMassSpectrometerLeak
Detector(MSLD),RoughingSystem,inletmanifoldwithgaugingandaheliumstandardleak.
ITheleakdetector'smanualisthereferenceforalloperation,
maintenanceandtroubleshootingfortheleakdetector.
I Theproceduresforstartupandshutdownpresentedinthismanual
havebeendevelopedtoutilizetheAutoProtectioncircuitontheMSLDandtheRoughingSystem.
LeakDetectorSystem
RoughingSystem
1.RoughingValve
2.RoughingColdTrap
3.VentValve
4.StandardLeak
5.MicronGauge
6.RoughingPump
7.InletManifold
LeakDetector
8.DiffusionPumpValve
9.DiatronValve
10.OutputMeter
11.Pressure
12.ElectronicStripChart
Index
IStartUpProcedures
IDailyOperationILeakChecking
Procedures
IShutDownProcedure
IAVS2.1Calibration I Maintenance
PreventativeMaintenance
MaintenanceProcedures Troubleshooting
***EngineeringSpecificationsandAVS2.1are foundinLeakDetectorfolder.***
FlowDiagramofOperation,
CalibrationandMaintenance
StartupProcedure
DailyStartupforLeakDetectorStation*
RoughingPumpSystem
1.CloseVentValve
2.Closesystemvalveorblankoffinlet.
3.OpenRoughingValve.
4.CheckPressureonMicronGauge:<30microns
5.FillRoughingColdTrap.(PPErequired)
LeakDetector
1.SwitchAuto-protectionOFF,listenfor fore pumptogurgle.
2.Checkdiffusionpumpstatus(SwitchONtwentyminutewait).
3.OpenDiffusionPumpIsolationValve.
4.OpenDiatronIsolationValve.
LeakDetector(Cont..)
5.SwitchGaugeON;CheckPressureon Leak Detector.
A.Mid-scaleorless,fillcoldtrap.(PPErequired).
B.Ifscaleisgreaterthanmidscaleswitchgaugeoffforaminuteandtryagain.
6.SwitchFilamentON.
A.IonizingCurrent(Mid-scale).
B.Accelerator(60-80volts)}.
7.SwitchAuto-protectionON.
Allgaugereadingsarefornormaloperation.Ifareadingdeviatesfromnormal,checkMaintenanceTroubleshooting
*DailyStart-upProceduresarefollowedondaysthattheDailyShut-downProcedureswereperformedpreviously.
DailyStartupforLeakDetectorStation*
RoughingPumpSystem
1.CloseVentValve
2.CloseSystemValveorblankoffinlet.
3.OpenRoughingValve.
4.CheckPressureonMicronGauge:<30microns
5.FillRoughingColdTrap.(PPErequired)
LeakDetector
1.SwitchAuto-protectionOFF,listenforfore pumptogurgle.
2.CheckValvestatus.
3.OpenDiatronIsolationValve.
4.SwitchGaugeON;CheckPressureonLeakDetector.
A.Mid-scaleorless,fillcoldtrap.(PPErequired).
B.Ifscaleisgreaterthanmidscaleswitchgaugeoffforaminuteandtryagain.
6.SwitchFilamentON.
A.IonizingCurrent(Mid-scale).
B.Accelerator (60-SOvolts)}.
7.SwitchAuto-protectionON.
WeekendStartupforLeakDetectorStation*
LeakDetector
1.SwitchAuto-protectionOFF,listenforfore pumptogurgle.
2.SwitchDiffusionPumpON.(Allow20minutesforwarmup)
RoughingPumpSystem
1.OpenRoughingValve.
2.CheckPressureonMicronGauge:20microns
3.FillRoughingColdTrap(PPErequired)
LeakDetector
1.OpenThrottle Valve;CheckMicronGauge,20Microns,OpenDiatronIsolationValve;CheckMicrongauge20Microns
2.OpenDiffusionPumpIsolationValve.(Allow20minutesforwarmup)
3.CloseThrottleValve
4.SwitchGaugeON;CheckPressureonLeakDetector.
A.Mid-scaleorless,fillcoldtrap.(PPErequired)
B.Ifscaleisgreaterthan midscaleswitchgaugeofffor aminuteandtryagain.
5.SwitchFilamentON.
A.IonizingCurrent(Mid-scale).
B.Accelerator(60-80volts).
6.SwitchAuto-protectionON.
Allgaugereadingsarefornormaloperation.Ifareadingdeviatesfromnormal,checkMaintenanceTroubleshooting
WeekendStart-upProceduresarefollowedondaysthattheWeekendShut-downProcedureswereperformedpreviously.
TotalStartupforLeak-DetectorStation*
LeakDetector
1.AssureRoughingValve,ThrottleValve,DiatronIsolationValve,DiffusionPumpIsolationValveareclosed.
2.Switch PowerONlistenforfore pumptogurgle.
3.SwitchAuto-protectionOFF.
4.SwitchDiffusionPumpON.(Allow20minutesforwarmup)·
RoughingPumpSystem
1.SwitchRoughingPumpON
2.OpenRoughingValve.
3.CheckPressureonMicronGauge:30microns
4.FillRoughingColdTrap.(PPE required)
LeakDetector
1.OpenThrottleValve;CheckMicronGauge,30Microns,OpenDiatronIsolationValve;CheckMicrongauge30Microns
2.OpenDiffusionPumpIsolationValve.(Allow20minutesforwarmup)
3.CloseThrottleValve
4.SwitchGaugeON;CheckPressureon LeakDetector.
A.Mid-scaleorless, fillcoldtrap.(PPErequired)
B.Ifscaleisgreaterthanmidscaleswitchgaugeoffforaminuteandtryagain.
5.SwitchFilamentON.
A.IonizingCurrent(Mid-scale).
B.Accelerator(60-80volts).
6.Switch Auto-protectionON.
Allgaugereadingsarefornormaloperation.Ifareadingdeviatesfromnormal,checkMaintenanceTroubleshooting
TotalStart-up ProceduresarefollowedondaysthattheTotalShut-downProcedureswereperformedpreviously.
DailyOperation
I Calibration
LeakDetection
Maintenance
IPayAttention
IEmergencyShutDown
T e c h n i c a lD i v i s i o nES-298031RevAF r a n k1 u r a v icJ r.
Daily Operation*
I Calibration12OSADuPont/CEC
Openleakdetectortostandard(STD)leak.
*PeakHeby adjustingAcceleratorVoltageformaximumoutputmeterdeflection.
CalculateaMDL.
DailyOperation*
Calibration112OSAAmetek
•Open leak detector to STD leak.
•*CalibrateforHe(Ifnecessary,peakHewithHeliumadjust).
•CloseSTDleak;Adjusttozeroonmostsensitivescale.
•OpenSTDleak;Keepmeteronscale;adjustCalibratetomatchSTDvalue.
DailyOperation
I LeakDetection
I Visuallyinspectwelds
Checktheprintforthetypeofweld
IfnotasspecifiedwriteQCRorDR
IConnectleakdetectortopartorsystemandleakcheckperspecification.
IfleakcheckisOK,fillinappropriatelabeloridentifier
IfleakcheckfailswriteQCRor DR
Doastripchartofleakcheckasrequired.
DailyOperation
ILeakDetection
Allleakcheckingshouldbewithappropriatefixturing.
- Useo-ringswithlowpermeabilitytoHe.
- Metalhose.
- Useputtyonlyinextremeemergencies.
- Supportbellowsfromcollapsingwhennecessary.
DailyOperation
ILeakDetection
Typesofleakchecking
- Vacuuminside,Bagandspray.
- Vacuumoutside,Heliumpressurenottoexceed30psig.
- Snifferprobe,Heliumpressurenottoexceed30psig.
DailyOperation
Maintenance
ColdTrapcleaning.
Fixtures
Checkforcleanliness
Checkforscratchesinsealingsurface
O-rings;checkforcuts.
DailyOperation
I PayAttention
Astheoperatorofamassspectrometerleakdetectoronehastobeonconstantvigilance.
Poorornosensitivity
Highbackground
Slowcleanuptohelium
Irregularoutputmeteroperation
Roughingsystemcontamination(high backgroundwithroughvalveopen)
DailyOperation
I OccasionallytheColdTraphastoberemoved duringthedayandtheoperatorhastobeabletocontinueleakchecking.
ReturntonormaloperationbyfollowingColdTrap
Removal(SpecialCases)MaintenanceProcedure
DailyOperation
I IfyoufallowedtheemergencyshutdownprocedureinDailyOperationsandwanttoresume leakchecking.
ColdTrapWarm:FollowTotalStartupProcedure
ColdTrapCold:FollowEmergencyStartupProcedure
•DailyOperation
I Emergency ShutDown
I CloseDiatronIsolationValve;DiffusionPump
IsolationValve;ThrottleValve.
I SwitchFilament,Gauge,DiffusionPumpOFF
I CloseRoughingValve;Switch Roughing
PumpOFF.
I Makesuretherearenoscrewsholdingthecoldtraptight.
I ThistakeslessthanThirtySecondstoperform.
LeakTestProcedure
I Leaktestsetup
Visuallyinspectallweldsperprintspecifications.
Visuallyinspectsealingsurfacesforscratches.
InspectforcleanlinessperES-107220,ifnecessary.
IIfanyoftheabovefailwriteQCRIDRandwaitfordisposition.
..•
LeakTestProcedure
LeakTestSetup
Considerationswhenselectingproperfixturing.
Fixturingmayrequiresomeimagination.
Selectfixturingandgasketsthatdonothinderjointverification.
Caution:Bellowsaresubjecttoforcesthatcan damagethepart.Useexpansionfixturesdesignedforthatbellows.
KeeptheuseofApiezonvacuumputtytoaminimum(assurenottocoverwelds).
LeakTestProcedure
IRoughingSystem
Connectpartorsystemtoleakdetectorsystem.
Assureastandardleakispartofsystemandpreferablyattheoppositeendofsystemfromthepump. Duringpumpdownkeepstandardleakopen
Open RoughingValve.
CAUTION:Theforcescreatedwhenpumpingaresufficient todamagethetestitem.Ifsomethinghappenstothetestitemduringpumpdown,thefirstactionistoopentheventvalve.
Monitormicrongauge,at20micronsclosestandardleak.
NOTE:Smallcomponentpartstakeashorttimetoreach20microns.
Onlargepartsormagnetsthetimetopumpdownto100microns,withjusttheroughingpump,isthefollowingformula.
V
t=12ps
IMSLD
LeakTestProcedure
SwitchmultipurposemetertoPressure.
OpenThrottleValve.
CAUTION:Thisprocedurerequirestheinspectortouseextremecaretopreventtheleakdetector'sinternalvacuumtoreachalevelthatcancausedamagetothefilament(abovemid-scale).
NOTE1:Iftheauto-protectionactivates,closeThrottleValveandretry.
NOTE2:Onapumpdownthatexceedstheestimatepumpdowntimeandif500microns,slowlyopentheThrottleValvekeepingthePressureneedlemidscale.Sprayhelium,checkingforlargeleaks.If noleaksarefoundcheckforcleanlinessproblemsortheroughingpumpneedsanoilchange.
IMSLD
LeakTestProcedure
WhenThrottleValveiscompletelyopenandPressureis
<midscale,closeRoughingValveslowlymonitoringthePressurenottoriseovermidscale.
CheckOutputMeterfor<85%mostsensitivescale.
NOTE:IfoncleanpartsyouhavetowaitforOutputMetertoread
<85%,sprayheliumlookingforleaks.Ifnoleaksarefoundchangeo-ringsand/orgasketsfortheymayhavepermeabilityproblems.
WhenOutputMeteris<85%onmostsensitivescaleandthe
RoughingValveisclosed,thepartisreadyfortesting.
LeakTestProcedure
I LeakTest/LeakTestLabel
NOTE:VacuumLeaktestperES-107240.ThefollowingitemsexpandonderivingnecessarydataforLeakTestLabel(LTL).
SCALEUNITSBEFOREHELIUMPROBE
FollowES-107240testprocedure#3 FollowES-107240testreport#1
Ifcauseforrejection,endtest.WriteQCRIDR. RecordonLTLOutputMeterposition
SCALEUNITSWHILEENCLOSUREFLOODING
FollowES-107240testprocedure#3
FollowES-107240testreport#1
Ifcauseforrejection,endtest.WriteQCRIDR.
RecordonLTLOutputMeterposition
LeakTestProcedure
ILeakTest/LeakTestLabel
DETERMINATION OFMINIMUMDETECTABLELEAK
MDS
Page 1 of 80
UsethedeterminationfromMSLDstripchartforAVS2.1
RecordonLTL.
RESONSE
OpenStandardLeak(keepOutputMeteronscale).
RecordonLTLOutputMeterposition.
Page 1 of 80
......
Page 1 of 80
CloseStandardLeak(keepOutputMeteronscale).
RecordonLTLOutputMeterposition.
LEAKVALUE
ValueofStandardLeak fortestatmcc/sec(helium)
Page 1 of 80
RecordonLTL.
Page 1 of 80
MDL
CalculateMDL
RecordonLTL.
Page 1 of 80
LeakTestProcedure
IPostLeakTest
Testsetupremoval.
CloseThrottleValve.
OpenVentValve.
Removetestitemfixturing. Closeventvalve.
Cleanandstoretestitem.
Cleanandstoretestfixturing/gaskets.
Documentationoftestitem.
LTLperES-107240 testresult#4
Completetestpaperworkandsignoff.
Page 1 of 80
ShutDownProcedure
Page 1 of 80
DailyShutDown
LeakDetector
1.SwitchFilamentandGaugeOff
2.CloseDiatronIsolationValve
3.Maintenance;ColdTrapCleaningProcedure
4.CloseThrottle
Page 1 of 80
WeekendShutDown
LeakDetector
1.SwitchFilamentandGaugeOff
2.CloseDiatronIsolationValve
3.Maintenance;ColdTrapCleaningProcedure
4.CloseThrottle
RoughingPump
1.OpenVent
2.ShutoffRoughingPump
3.OpenRoughingValve
4.Remove,cleanandreinstallRoughingColdTrap(safetyequipmentrequired).
5.CloseVentValve,RoughingValve
Page 1 of 80
TotalShutDown
LeakDetector
1.SwitchFilamentandGaugeOff
2.CloseDiatronIsolationValve
3.Maintenance;ColdTrapCleaningProcedure
4.CloseThrottle
5.SwitchPower OFF
1.OpenVent
RoughingPump
2.ShutOffRoughingPump
3.OpenRoughingValve
4.Remove,cleanandreinstallRoughingColdTrap(safetyequipmentrequired).
5.CloseVentValve,RoughingValve
T e c h n i c a lD i v i s i o nES-29803lRevAF r a n kJ u r a v icJ r.
I
T e c h n i c a lD i v i s i o nES-29803JRevAF r a n kJ u r a v icJ r.
AVS2.1Calibration
I Equipment Start-up
Allow MSLD to warm up for 30 minutes.
Allow chart recorder to warm for 30 minutes.
Peak helium response on MSLD.
Close Throttle Valve.
Open Standard Leak and Roughing Valve.
T e c h n i c a lD i v i s i o nES-298031RevAF r a n kJ u r a v i cJ r.
AVS2.1Calibration
I Equipment Start-up
Allow MSLD to warm up for 30 minutes.
Allow chart recorder to warm for 30 minutes.
Peak helium response on MSLD.
Close Throttle Valve.
Open Standard Leak and Roughing Valve.
T e c h n i c a lD i v i s i o nES-298031RevAF r a n kJ u r a v i cJ r.
AVS2.1Calibration
I Record MSLD Output Meter on Strip Chart
Name file per section requirements.
Enter MSLD property number.
Enter Standard Leak's value.
Run for twenty minutes.
I
T e c h n i c a lD i v i s i o nES-298031RevAF r a n kJ u r a v i cJ r.
I
AVS2.1Calibration
I Record helium response on Strip Chart
Open Throttle Valve; Close Standard Leak; Roughing Valve
Zero on most sensitive scale.
Open Standard Leak; Calibrate on White 1o-8
Scale
Run for five minutes. Close Throttle Valve.
Stop Chart Recorder
T e c h n i c a lD i v i s i o nES-298031RevAFr n n kJ u r a v i cJ r.
AVS2.1Calibration
I Evaluate Strip Chart
Determine straight line approximations of the chart for each 1 - minute interval (1 - min).
Drift
Drift equals the sum of total change in chart's slope for each 1- min in output, divided by 20
Drift
Total Change
------
20
T e c h n i c a lD i v ii o nES-298031RevAF r a n kJ u r a v icJ r.
AVS2.1Calibration
I Evaluate Strip Chart
Determine straight line approximations of the chart for each 1 - minute interval (1 - min).
Noise
Noise equals the average of the maximum peaks in 1- min, multiplied by two, divided by 20
Noise =
2x
NOTE: Neglect any large peak within any 5 - min
AVS2.1Calibration
I StoreStripChart
Storefileindepartment’s StripChartlocationonserver
Maintenance
Preventative Maintenance
Maintenance
PreventativeMaintenance
I Keepingleakdetectorsandroughingsystemsreliablerequiresapreventativemaintenanceprogram.
NOTE:Metalhoses,fixtures,o-ringsandgasketsshouldalsohavearegimethat assurescleanliness.
Maintenance
PreventativeMaintenance
Leakdetectorscanhavealongintervalbetweencleaningsifnotabused.
TheDiffusionPumpoilhastobereplacedwhenunusually goodsensitivityisdetected.
Onlyreplacefilamentsasneeded.
Maintenance
PreventativeMaintenance
Leakdetector'sforepumpoilshouldbereplacedBi-annually.
TheVBeltshouldbeinspectedbi-annually.
AnydoubtinconditionofVBelt,replace
Maintenance
PreventativeMaintenance
Roughing pumpsshouldhavetheoilchangedeverythreemonthsifused continuously.Heavydutyworkmayrequireoilchangemonthly.
TheVBeltshouldbeinspectedbi-annually.
AnydoubtinconditionofVBelt,replace.
Maintenance
PreventativeMaintenance
Metal bellowsshouldbecleanedwithanultra-sonicbathBi-annuallyorasnecessary.
Fixturingshouldbecleanedandinspectedfordamageasused.
Maintenance
PreventativeMaintenance
I Gasketando-ringsbecometroublesomewith permeability ofhelium.Replaceasnecessary.
Maintenance
Procedures
II / ShutDown;ColdTrapSpecialCases;ColdTrap / I
I
ChangeRoughingPumpOil
ChangeLeakDetector
ForePumpOil
I / ChangeFilament / I
Maintenance
Procedures
I ColdTrapRemovalforShutDowns
CloseRoughingValve;CloseSystem Valve(Blankoffinletmanifold);
OpenVentValve
SwitchFilamentOFF;GaugeOFF;AutoProtectionOFF
CloseDiatronIsolationValve;CloseDiffusionPumpIsolationValve;
SwitchDiffusionPumpOFF(DailycanbeleftON)
OpenThrottleValve
Cautiouslyremoveanddumpcoldtrap(PPErequired)
Clean ColdTrapWell andinspecto-ring
InstallcleanedColdTrap
CloseVent Valve;OpenRoughingValve
CheckMicronGauge<20Microns
CloseThrottleValve
Maintenance
Procedures
I ColdTrapRemoval(SpecialCases)
CloseRoughingValve;CloseSystemValve(Blankoffinletmanifold);
OpenVentValve
SwitchFilamentOFF;GaugeOFF;Auto ProtectionOFF
CloseDiatronIsolationValve;CloseDiffusionPumpIsolationValve
OpenThrottleValve
Cautiouslyremoveanddumpcoldtrap(PPErequired)
CleanCold TrapWellandinspectoring
InstallcleanedColdTrap
CloseVentValve;OpenRoughing Valve
CheckMicronGauge <20Microns
OpenDiatron(checkMicronGauge20Microns)
Page1
Maintenance
Procedures
I ColdTrapRemoval(SpecialCases)
Close ThrottleValve
OpenDiffusionPumpValve
SwitchGaugeON;CheckPressureonLeakDetector.
A.Mid-scaleorless,fillcoldtrap.(PPErequired)
B.Ifscaleisgreaterthanmidscaleswitchgaugeoffforaminuteandtryagain.
:SwitchFilamentON.
A.IonizingCurrent(Mid-scale).
B.Accelerator(60-80volts).
SwitchAuto-protectionON.
Resumeoperation.
Page2
Maintenance
Procedures
Start-upafterEmergencyShutDownFrostoncoldtrap
1.OpenRoughingValve;OpenVentValve;CloseSystemValve(Blankoffinletmanifold).
2.Carefully removeColdTrap;Empty LN2toasafeplace(PPErequired).
3.Warmcoldtrapandcoldtrapwellthencleanandreinstall.
4.CloseRoughingValve;SwitchRoughingPumpON;AutoProtectionOFF(Listenforforepumptogurgle).
5.OpenThrottleValve:Carefully removeColdTrap;Empty LN2toasafeplace(PPErequired).
5.Warmcoldtrapandcoldtrapwellthencleanandreinstall.
6.OpenRoughingValve;SwitchDiffusionPumpON(20minutewarmup).
a.CheckMicrongauge20microns
b.OpenDiatronValve(checkMicronGauge20Microns)
Page3
Maintenance
Procedures
Start-upafterEmergencyShutDown
7.CloseThrottleValve;OpenDiffusionPumpValve(20minutewarmup).
8.SwitchGaugeON;CheckPressureonLeakDetector.
a.Mid-scaleorless,fillcoldtrap.(PPErequired)
b.Ifscaleisgreaterthanmidscaleswitchgaugeoffforaminuteandtryagain.
9.SwitchFilamentON.
a.IonizingCurrent(Mid-scale).
b.Accelerator (60-80volts).
10.SwitchAuto-protectionON.
11.Resumeoperation.
Page4
Maintenance
Procedures
Start-upafterEmergencyShutDown
1.SwitchRoughingpumpON;SwitchAutoProtectionOFF;SwitchDiffusionPumpON(20minutewarmup)
2.OpenRoughingValve
a.CheckMicrongauge20microns
b.OpenDiatronValve(checkMicronGauge20Microns)
3CloseThrottleValve;OpenDiffusionPumpValve(20minutewarm up).
4.SwitchGaugeON;CheckPressureonLeakDetector.
a.Mid-scaleorless,fillcoldtrap.(PPErequired)
b.Ifscaleisgreaterthanmidscaleswitchgaugeoffforaminuteandtryagain.
5.SwitchFilamentON.
a.IonizingCurrent(Mid-scale).
b.Accelerator (60-80volts).
6.SwitchAuto-protectionON.
7.Resumeoperation.
Maintenance
Procedures
IRoughingpumpoilchange.
If theroughingcoldtrapisfull emptyperdirectionsintheColdTrapCleaningProcedure.
OpenVentValve;OpenRoughingValve
SwitchRoughingPumpOFF
Openoildrain
Whenflowisveryslow,jogpumptoremoveoiltrappedinthevaneregionofpump.
Alsolookatusedoilforsludge.Ifsludgeisexcessive,removeoilcoverandclean.Removalofoilcoverrequiresaspecialgasket.
Closeoildrainandfillwith HE-200oilandquantityoilrecommendedbymanufacture.(Normallymiddleofsightglass.)
Resumenormaloperation.
Maintenance
Procedures
IMSLDForePumpoilchange.
UseTotal ShutDownProcedure.
OpenLid;RemovebackofMSLD
RemoveV-beltcover;InspectVbelt(Anydoubtreplace);ReplaceV-beltcover.
Openoildrain
Whenflowisveryslow,jogpumptoremoveoiltrappedinthevane regionofpump.
CloseoildrainandfillwithHE-200oilwithquantityofoilrecommendedbymanufacture.(Normallymiddleofsightglass.)
ReplacebackofMSLD;Closelid
IChangeFilament
Maintenance
Procedures
Note:IfFilamentisblownduetohigh pressureandleakdetection willberesumed.
IDailyShutDownProcedure
ILoosenMagnetholderandremovemagnet
IRemoveFuse;Disconnectpre-amp
IRemoveDiatronEnvelopewithDiatron.
IRemoveDiatron.(Replacefilamentpermanualinstructions)CleanDiatronEnvelope
IReplaceDiatron (checkingforalignment);replaceDiatronEnvelope;Magnet
IDailyStartUp
IAlignmagnetperleakdetectormanualinstructions
Maintenance
Troubleshooting
Maintenance
Start-upTISProcedures
I20microns
Cleanroughingsystemcoldtrap(PPErequired)
Changeoilinroughingpump(HE-200)
Leakcheckroughingsystem
I100microns
Leakcheckroughingsystem
Changeoil(HE-200)
Overhaul roughingpump
Maintenance
Start-upT/SProcedures
Autoprotection-nogurgle
ReplaceForePumpVbelt
SomeproblemswithstartuparecoveredinDailyOperatingT/S
Maintenance
DailyOperationsT/SProcedures
INOTE:Ifnotthesolutiontoproblemrefertoleakdetectormanualfor furthertroubleshootingsuggestions.
1NoSensitivity:
IfthefilamentlightisglowingverybrightandthereisnoIonizingCurrent,replacethefilament.
2Poor Sensitivity:
CleanColdTrap(PPErequired).
3ExcessiveSensitivity:
Changediffusionpumpoil.
4Excessivenoise:
Checkforloosescrewsonpre-amplifier.
Page1
Maintenance
DailyOperationsT/SProcedures
I NOTE:Ifnotthesolutiontoproblemrefertoleakdetectormanualfor furthertroubleshootingsuggestions.
IPoorpressure‘pressuregauge’reading:
Leaktestleakdetector.
IUnusuallyslowcleanup:
Cleancoldtrap(PPErequired).
IOutputmeterdeflectsfullscale(positive/negative):
Checkforloosescrewsonpre-am
Page2
EngineeringSpecification
Mostengineeringspecificationastheyrefertovacuum,welding, cleaningetc.areinbackofbook.
TheprocedureAVS2.1isalsoinaPDFfile.
Conclusion
Thismanualshouldhelpyouthroughmanysituations
Whenindoubtrefertomanualsprovidedwiththeequipment
rcalling3014
DuPont Super Leak Detector Start-Up Procedure
Gloves and face shield are recommended when using liquid nitrogen
James 03/03/10
1)Open the standard leak
2)Remove the cold trap bucket
3)If the bucket is trapped the machine was shut down incorrectly. Break the vacuum at the KF16 connection to the fore pump.
4)Close the diffusion pump valve.
5)Switch on the main power.
6)Let the fore pump run a minimum of two minutes.
7)Switch on the diffusion pump.
8)The diffusion pump will take a minimum of twenty minutes to warm up.
9)Close the roughing pump valve and start the roughing pump.
10)Let the rougher warm up a minimum of two minutes.
11)Close the manifold vent valve.
12)Close the throttle valve.
13)Turn off the auto protection (red button) auto protection is off when the LED is lit.
14)Open the roughing pump valve.
15)The fore pump will take at least a minute to pump out the back side of the throttle valve
16)Let the Hastings gauge bury.
17)Check the O ring on the cold trap.
18)Wipe down the cold trap bucket with alcohol.
19)Insert the cold trap bucket.
20)Open the throttle valve.
21)Add nitrogen at 50 microns or less.
22)Let the Hastings gauge bury.
23)Check the boil, it should be calm.
24)Slowly open the analyzer cell valve
25)Let the Hastings gauge bury.
26)Close the throttle valve.
27)Open the diffusion pump valve.
28)Let the analyzer cell pump for at least five minutes.
29)Check the boil, it should be calm.
30)Press / hold the (green button) until the relay picks up (~ three seconds) and release.
31)Let the analyzer cell warm up a minimum of twenty minutes.
32)The background initially should be around 4.5E-9 and dropping
33)Pirani gauge should show one bar only.
34)Turn on the auto protection (red button) protection is on when the LED is not lit.
35)After warm up the background should go down to 2.5E-10 +/- .5 nominal. Also known as 0 This may require more time. It is important to remember that until the background is at some base line, calibrating should not be performed.
36)After background nominal or base line is reached check calibration.
37)Check the Hastings, it should be buried.
38)Slowly open the throttle valve.
39)Check the Hastings, it should be buried.
40)Slowly open the throttle valve.
41)Close the roughing pump valve.
42)Compare the standard leak value with the read out.
43)Let the standard leak pump down to a base line.
44)Divide the standard leak value by the signal output
45)The sensitivity specification is 1.0 to 2.5
46)If tuning is necessary follow these steps.
- Press the Spectro button.
- Triode pressure should be no higher than one
- Press next three times.
- Accelerator voltage is the only adjustment.
- Accelerator voltage nominal is 211-213
- To adjust voltage press F2.
- Press +/- to calibrate.
- Press F2
- Close the calibrated leak to see manifold background. (Background should be in the E-10 range)
- Press the next button to leave the Triode Pressure displayed
Some important things to remember:
Regardless of what any gauge reads the cold trap never lies. If the boil is not calm there is pressure in the system.
Don’t let the cold trap run dry as it will release contaminates into the system.
If a nominal value cannot be reached there is a reason. Some of the most common causes are as follows:
- High pressure
- Internal or external leak
- Diffusion pump oil is contaminated
- Fore pump oil is contaminated
- Analyzer cell is contaminated
- Cold trap is or was dry
- Insufficient time has been given to reach the value
- Standard leak valve in the closed position is bleeding through
- Standard leak O ring shaft seal is bleeding through
- Manifold vent valve in the closed position is bleeding through
Protect the analyzer cell. It should not be out of a state of vacuum at any time.
Protect the diffusion pump. It cannot run out of a state of vacuum.
In both these cases damage always occurs, it’s just a question of how much.
DuPont Super Leak Detector Shut-Down Procedure
James 03/12/10
1)Close the throttle valve
2)Turn off the analyzer cell (round black button)
3)Close the analyzer cell valve
4)Close the diffusion pump valve
5)Turn off the auto protection (red button) auto protection is off when the LED is lit
6)Wait approximately 15 second for the back side of the throttle valve to pump out
7)Turn off the diffusion pump
8)Close the roughing pump valve or turn off the roughing pump
9)Vent the manifold (leave open)
10)Slowly open the throttle valve
11)This will free the cold trap bucket
12)Remove the cold trap bucket
13)Recycle the nitrogen into a hand dewar
14)Let the diffusion pump cool down a minimum of twenty minutes
15)After cool down turn off the main power
16)Open the diffusion pump valve to vent the fore pump
If the cold trap bucket is reinserted and seated prior to venting the fore pump it will become trapped under vacuum and this will necessitate breaking vacuum at the KF16 connection to the fore pump to release it.
DuPont Super Leak Detector Cold Trap Bucket Exchange
James 03/12/10
During leak detector operation often a fresh clean cold trap bucket is advantageous and sometimes necessary. It never hurts to exchange the bucket.
Here are some typical conditions for which this is true.
1)Extended pumping will not reduce pressure
2)Extended pumping will not reduce background
3)Pumping on a dirty part
4)Pumping on water
5)Chemical contamination ( WILL DISTROY THE ANALIZER CELL )
There are cases in which a bucket may have to be exchanged several times. A water load is a classic example. If the bucket is removed and found to have ice / snow on the walls, exchanges must be done until the majority of the water is removed. As this is being done the pressure should be reduced with each exchange. Pumping time for each exchange will vary with the condition of the source.
Don’t waste time warming up the bucket, Have a fresh clean bucket ready.
During the exchange pressure is rising in the analyzer cell.
So methodically change it quickly.
Procedure:
1)Turn on the roughing pump (valve closed)
2)Close the throttle valve
3)Turn off the auto protection (red button) auto protection is off when the LED is lit
4)Wait approximately 15 second for the back side of the throttle valve to pump out
5)Turn off the analyzer cell (round black button)
6)Close the analyzer cell valve
7)Close the diffusion pump valve
8)Vent the manifold ( leave open )
9)Slowly open the throttle valve to release the cold trap bucket ( leave it open )
10)Remove the bucket
11)Check the O ring
12)Insert the fresh bucket
13)Close the manifold vent valve
14)Open the roughing pump valve
15)Check the Hastings gauge
16)Add nitrogen at 50 microns or less
17)Let the gauge bury
18)Check the boil, it should be calm
19)Close the throttle valve
20)Open the diffusion pump valve
21)Check the boil, it should be calm
22)Wait a minimum of a minute
23)Open the analyzer cell valve
24)Wait a minimum of two to three minutes for stabilization
25)Turn the analyzer cell back on
26)Turn on the auto protection (red button) protection is on when the LED is not lit