Guidelines to Prepare Your ProgressReport
FUNSAT Team
Evaluation Reference
- It’s a progress report, so each team’s progress towards the flight model designwould be central in this evaluation
- FUNSATis a1.33 kg, 4”x 4”x 4” cube satellite (6U – 8 kg).Please consider it when you evaluate “Design maturity and feasibility” of their deign
- In every evaluation category, each team’s progress should be marked as “Satisfactory” and “Unsatisfactory,” then provide your suggestion/guidance for the future work.
- If possible, please email us “softcopy” of your evaluation sheet
- The progress report format can be found in the next page.
Evaluation Criteria
- Design & Development:40%
- Design maturity and feasibility: Design details & parts selection
- Budget & funding plan for the Flight Model (FM)development
- Teaming
- Classes/ Student organizations
- Mentor (including faculty)
- Plan for two (2) year project
- Technical Merits: 50%
- Mission, science, and/or engineering
- Preparation for the Prime Contractor (only for teams participating in the whole Cubesat): 10%
- Build the for a Florida satellite: collaboration plan/scheme
- Facility: lab, ground station, etc
- Others: Bonus up to 10%
- Launch opportunity: application for aCubeSat Launch (e.g. ELaNa due 11/24)
- Band application
FUNSAT Progress Report Format
FUNSAT Team
- 30 pages maximum for main body
- Appendix document that includes all design supporting documents such as simulation & analysis results, drawings, information of the major components, etc (not be counted for the page limit)
Executive Summary
Focus on your team’s progress towards the detailed design and Flight Model development. Also, clearly address the technical innovation of your mission and/or satellite design
Table of Contents
List of figures
List of tables
Mission
Systems Engineering:
Technical budgets, estimated,(mass, power, etc.)
Trade study and contingency plans
Technical verification/validation plan (simulation, analysis, test plan, etc)
Payload Design
Bus Subsystems Design
Plan for the Detailed Design
Major developments required for the detailed design
Major tasks & time table
Plan for the Flight Model Development
Teaming of two years
Budget required, Funding plan, and Sponsors
(If develop the whole CubeSat) Plan for the launch opportunity and band application
Appendix (not be counted for the page limit)
Application for a CubeSat Launch (e.g. ELaNa due 11/24)
Technical analysis and simulation including trade studies
Information of major parts/components