Global Project News (Africa): June’2017

Update: June, 2017

Vol. 99

Focus Market

by

Satpreet Kaur

PROJECT EXPORTS PROMOTION COUNCIL OF INDIA

(Set up by Ministry of Commerce & Industry, Government of India)

1112 Arunachal Building, 19 Barakhamba Road, New Delhi

Tel.:+91-11-41514673, 41514284, 41563287, Fax: +91-11-45623110

E-mail: ;

Web-site: www.projectexports.com

1.0 INDEX

Tenders

Project / Country / Dead Line / Page no.
Water/ Irrigation
Construction and Rehabilitation of Gravity-Fed Piped Water Supply Schemes in Rumphi and Nkhotakota Districts / Malawi / 02 August 2017 / 3
Construction and Rehabilitation of Gravity-Fed Piped Water Supply Schemes in Ntcheu and Mangochi Districts, Malawi / Malawi / 02 August 2017 / 6
Central Water Supply and Sanitation Programme II, Uganda / Uganda / 01 August 2017 / 8
Rehabilitation of the reservoirs of Sidi Bousber Center in the province of Ouezzane, Morocco / Morocco / 26 July 2017 / 9
Construction of suction docks and connection to stations at the AIT OURIBLE, AIT IKOU and MAJMAA TOLBA centres (Province of KHEMISSET), Morocco / Morocco / 02 August 2017 / 11
Rehabilitation of the pipeline Bouregreg - Sector dam / Morocco / 02 August 2017 / 13
Reinforcement and rehabilitation of distribution at the main avenue of the DAR GUEDDARI center, Morocco / Morocco / 02 August 2017 / 14
Rehabilitation of the drinking water distribution network in the ZIRARA center tranche 2 (Province of SIDI KACEM). Lot : PIPELINE / Morocco / 02 August 2017 / 16
Works of Rehabilitation of distribution network at the IGHOUD center. (Province of Youssoufia), Morocco / Morocco / 27 July 2017 / 18
Works of Rehabilitation of distribution network at the IGHOUD center. (Province of Youssoufia), Morocco / Morocco / 27 July 2017 / 20
Kenya Towns Sustainable Water Supply and Sanitation Program / Kenya / General Procurement Notice / 22
Construction of Wadelai Irrigation Scheme Infrastructure and Facilities in Nebbi - Lot 1 (Re-Tender) / Uganda / 31 July 2017 / 23
Construction of Shuuku - Masyoro Gravity Flow Scheme Water and Sanitation Project, Phase I. / Uganda / 20 July 2017 / 24
Construction of Wadelai Irrigation Scheme Infrastructure and Facilities in Nebbi - Lot 1 (Re-Tender) / Uganda / 31 July 2017 / 26
Construction of Ezulwini Sustainable Water Supply System / Swaziland / 04 August 2017 / 27
Social Infrastructure
Multinational Uganda – Kenya: Kapchorwa – Suam – Kitale & Eldoret Town Bypass Roads Project / Kenya / General Procurement Notice / 29
Energy
Supply, installation and commissioning of six (6) Generators, Sudan / Sudan / 31 July 2017 / 31
Zimbabwe Alaska – Karoi Power Transmission Rehabilitation Project (AKTP) / Zimbabwe / General Procurement Notice / 32
Rehabilitation and Extension of Bo-Kenema Distribution System, Sierra Leone / Sierra leone / General Procurement Notice / 34
Consultancy
Consultancy Services for Feasibility Study and Detailed Engineering Design of One Stop Border Post (OSBP), Uganda / Uganda / 07 July 2017 / 36
Consulting Services for the Third National Drainage Programme, (NDP III) / Egypt / 06 July 2017 / 38
Eritrea Groundwater Assessment, Aquifer Mapping and Well Development Project / Eritrea / General Procurement Notice / 40

News Items

World Bank injects $125 million for Upper Egypt development 41

Electro-Mechanical Design Group plans $300 million cement plant in Egypt 41

Over 120,000 hotel rooms under construction in Middle East and Africa (MEA) 42

Sierra Leone signs contract for 46km trans-Africa road 43

Uganda and Tanzania to construct electric railway lines 43

Energiya Global to invest $1b in green power projects in Africa 44

Botswana to construct 100MW solar power plant 45

Access Power secure funding for Zambia wind power project 46

Tanzania inks mega deal to expand main port 46

AfDB’s seeks to boost electricity access in Africa 47

Kuwait boosts construction of Tabora Road in Tanzania 48

US$ 4.3m four-star hotel to be constructed in Kenya 49

Chinese firms see Kenya as potential market for Solar energy 49

Construction market in North Africa is on the boom 50

Ghana moves to embrace renewable energy 51

€186 million loan from EBRD, EU for developing infrastructure in Egypt 52

Tenders

Water

Construction and Rehabilitation of Gravity-Fed Piped Water Supply Schemes in Rumphi and Nkhotakota Districts

Project ID No.
/ Lot 1: 021/SRWIHL/W/2017/014a – Rumphi District Lot 2: 021/SRWIHL/W/2017/014b – Nkhotakota District
Project Name: / Sustainable Rural Water and Sanitation Infrastructure for Improved Health and Livelihood Project (SRWSIHL)
Country: / Malawi
Description: / Construction and Rehabilitation of Gravity-Fed Piped Water Supply Schemes in Rumphi and Nkhotakota Districts
Funding agency: / African Development Bank
Last date of bid submission: / 2nd August, 2017at 10.00 hours local time.
Price of bidding document: / MK50, 000.00 or its equivalent
Address for bid submission: / Tender box located on the Ground Floor, next to Room 14,
Ministry of Agriculture,
Irrigation and Water development,
Department of Irrigation and Water Development,
Tikwere House,
City Centre,
P/Bag 390,
Lilongwe 3,
Malawi.

1. This Specific Procurement Notice follows the General Procurement Notice for this program that appeared in the Development Business No.: AfDB608-09/14 of 16th September, 2014.

2. The Government of the Republic of Malawi through Ministry of Agriculture, Irrigation and Water Development received financing from the African Development Bank Group towards the cost of the Sustainable Rural Water and Sanitation Infrastructure for Improved Health and Livelihood project (SRWSIHL) and intends to apply part of the proceeds of those funds to cover the eligible payments under the contract for Construction and Rehabilitation of Hewe, Mlowe, Ntchenachena, Ng’onga and Mhuju Gravity Fed Piped Water in Rumphi District and Dwambadzi Gravity Fed Piped Water in Nkhotakota District.

3. Bidding will be conducted through International Competitive Bidding (ICB) procedures for works in accordance and is open to all eligible Bidders as defined in the ADB’s Rules and Procedure for the Procurement of Goods and Works.

4. The Expected works under this assignment shall involve construction and rehabilitation works of the intake, the treatment works, the transmission and distribution network, service reservoirs and water points.

5. The Procuring Entity shall hold a pre-bid conference in Lilongwe at the City Centre in Tikwere House, Conference Room, Floor No. 2 on 10th July, 2017 from 14.00 pm and conduct Site Visits from 11th July, 2017 at Dwambazi Gravity Fed Systems in Nkhotakota District and Hewe, Mlowe, Ntchenachena, Ng’onga and Mhuju Gravity Fed Piped Water in Rumphi District. All site visits shall be starting at 10.00 am.

6. The Government of Malawi now invites sealed bids from prospective bidders for the following works:

Lot / Contract / Description of Contract / Type of Procurement / Duration of Contract
1 / Construction and rehabilitation works of the Hewe, Mlowe, Ntchenachena, Ng’onga and Mhuju Gravity Fed Piped Water in Rumphi District. / Civil Works for Intake Works and Treatment Works, Transmission Pipeline, Tanks, Distribution Lines, Service Lines and Tap Water Points / ICB / 12 Months
2. / Construction and rehabilitation works of the Dwambazi Gravity-Fed Rural Water Scheme in Nkhotakota District / Civil Works for Intake Works and Treatment Works, Transmission Pipeline, Tanks, Distribution Lines, Service Lines and Tap Water Points. / ICB / 12 Months

7. The Instruction to Bidders and General Conditions of Contract contained in the bidding documents comply with the Bank’s Standard Bidding Documents for the Procurement of Works. A complete set of Bidding Documents in English may be purchased by interested bidders at the address below in 10(b) and upon payment of a non-refundable fee of MK50, 000.00 or its equivalent in a freely convertible currency. The method of payment will be cash or bank certified cheque at the Sustainable Rural Water and Sanitation Infrastructure for Improved Health and Livelihoods project (SRWSIHL) from 08.00 to 12.00 noon and 13.00 to 16.00 hours local time (Monday to Friday, except national public holidays and weekends).

8. Bids shall be valid for a bid period of One Hundred Twenty (120) days after bid opening and must be accompanied by a bid security from a Commercial Bank of MK50 Million for Lot 1 and MK25 Million for Lot 2 or its equivalent in a freely convertible currency. Bids must be delivered to the address shown at 10 (c) and deposited in a box marked ‘Tender Box’ on or before 2nd August, 2017at 10.00 hours local time.

9. Bids will be opened in the presence of the bidders’ representatives who choose to attend in person at the address 11 (d) below at 10:00 hours Local Time on 2nd August, 2017.

10. Bidders MUST be registered with the National Construction Industry Council in the following Civil Engineering Categories: (i) Lot 1-Unlimited Category (ii) Lot 2- 1 Billion Category

11. Address for inspection, issuing, submission and opening of bids;

a. Address for inspection and clarifications of documents only

The Project Coordinator

Sustainable Rural Water and Sanitation Infrastructure for Improved Health and Livelihood,

MANOBEC Complex,

Area 4, Ground Floor,

P/Bag 353, Lilongwe 3,

Malawi

Email:

Attention: Procurement Specialist

b. Address for issuing of Bids

Sustainable Rural Water and Sanitation Infrastructure for Improved Health and Livelihood,

MANOBEC Complex,

Area 4,

Ground Floor,

P/Bag 353,

Lilongwe 3, Malawi

c. Address for Submission of Bids

Tender box located on the Ground Floor, next to Room 14,

Ministry of Agriculture,

Irrigation and Water development,

Department of Irrigation and Water Development,

Tikwere House,

City Centre,

P/Bag 390,

Lilongwe 3,

Malawi.

d. Address for Bid Opening

Ministry of Agriculture,

Irrigation and Water development,

Department of Irrigation and Water Development,

The Conference Room, 2nd floor,

Tikwere House,

City Centre,

P/Bag 390,

Lilongwe 3,

Malawi

Construction and Rehabilitation of Gravity-Fed Piped Water Supply Schemes in Ntcheu and Mangochi Districts, Malawi

Project ID No.
/ Lot 1: 021/SRWIHL/W/2017/015a – Ntcheu District Lot 2: 021/SRWIHL/W/2017/015b – Mangochi District
Project Name: / Sustainable Rural Water and Sanitation Infrastructure for Improved Health and Livelihood Project (SRWSIHL)
Country: / Malawi
Description: / Construction and Rehabilitation of Gravity-Fed Piped Water Supply Schemes in Ntcheu and Mangochi Districts
Funding agency: / African Development Bank
Last date of bid submission: / 2nd August, 2017at 10.00 hours local time.
Price of bidding document: / MK50, 000.00 or its equivalent
Address for bid submission: / Tender box located on the Ground Floor, next to Room 14,
Ministry of Agriculture,
Irrigation and Water development,
Department of Irrigation and Water Development,
Tikwere House,
City Centre,
P/Bag 390,
Lilongwe 3,
Malawi.

1. This Specific Procurement Notice follows the General Procurement Notice for this program that appeared in the Development Business No.: AfDB608-09/14 of 16th September, 2014.

2. The Government of the Republic of Malawi through Ministry of Agriculture, Irrigation and Water Development received financing from the African Development Bank Group towards the cost of the Sustainable Rural Water and Sanitation Infrastructure for Improved Health and Livelihood project (SRWSIHL) and intends to apply part of the proceeds of those funds to cover the eligible payments under the contract for Construction and Rehabilitation of Nanyangu, Dombole, and Kasinje Gravity Fed Piped Water Supply Schemes in Ntcheu and Lingamasa Gravity Fed Piped Water Supply Scheme in Mangochi District.

3. Bidding will be conducted through International Competitive Bidding (ICB) procedures for works in accordance and is open to all eligible Bidders as defined in the ADB’s Rules and Procedure for the Procurement of Goods and Works.

4. The Expected works under this assignment shall involve construction and rehabilitation works of the intake, the treatment works, the transmission and distribution network, service reservoirs and water points.

5. The Procuring Entity shall hold a pre-bid conference in Lilongwe at the City Centre in Tikwere House, Conference Room, Floor No. 2 on 10th July, 2017 from 14.00 pm and conduct Site Visits from 11 th July, 2017 at Nanyangu, Dombole, and Kasinje Gravity Fed Piped Water Supply Schemes in Ntcheu and Lingamasa Gravity Fed Piped Water Supply Scheme in Mangochi District. All site visits will be starting at 10.00 am.

6. The Government of Malawi now invites sealed bids from prospective bidders for the following works:

Lot / Contract / Description of Contract / Type of Procurement / Duration of Contract
1. / Construction and rehabilitation works of the Nanyangu, Kasinje and Dombole Gravity Fed Rural Piped Water Schemes in Ntcheu District. / Civil Works for Intake Works and Treatment Works, Transmission Pipeline, Tanks, Distribution Lines, Service Lines and Tap Water Points. / ICB / 12 Months
2. / Construction and rehabilitation works of the Lingamasa Gravity Fed Piped Rural Water Supply Scheme in Mangochi District / Civil Works for Intake Works and Treatment Works, Transmission Pipeline, Tanks, Distribution Lines, Service Lines and Tap Water Points. / ICB / 12 Months

7. The Instruction to Bidders and General Conditions of Contract contained in the bidding documents comply with the Bank’s Standard Bidding Documents for the Procurement of Works.

A complete set of Bidding Documents in English may be purchased by interested bidders at the address below in 10 (b) and upon payment of a non-refundable fee of MK50, 000.00 or its equivalent in a freely convertible currency.

The method of payment will be cash or bank certified cheque a the Sustainable Rural Water and Sanitation Infrastructure for Improved Health and Livelihood project (SRWSIHL) from 08.00 to 12.00 noon and 13.00 to 16.00 hours local time (Monday to Friday, except national public holidays and weekends).

8. Bids shall be valid for a bid period of One Hundred Twenty (120) days after bid opening and must be accompanied by a bid security from a Commercial Bank of MK50 Million for Lot 1 and MK25 Million for Lot 2 or its equivalent in a freely convertible currency. Bids must be delivered to the address shown at 10 (c) and deposited in a box marked ‘Tender Box’ on or before 2nd August, 2017 at 10.00 hours local time.

9. Bids will be opened in the presence of the bidders’ representatives who choose to attend in person at the address 11 (d) below at 10:00 hours Local Time on 2nd August, 2017.

10. Bidders MUST be registered with the National Construction Industry Council in the following Civil Engineering Categories: (i) Lot 1-Unlimited Category (ii) Lot 2- 1 Billion Category

11. Address for inspection, issuing, submission and opening of bids;