GF1T 23SVQ in Plastering (Construction)at

Level 3 - Structure

To attain the qualification candidates must complete 8 Units in total. This comprises:
5 Mandatory Units
3 Optional Units

Please note the table below shows the SSC identification codes listed alongside the corresponding SQA Unit codes. It is important that the SQA Unit codes are used in all your recording documentation and when your results are communicated to SQA.

Mandatory Units: Candidates must complete 5Units
SQA code / SSCcode / Title / SCQF level / SCQF credits
F7A904 / VR 209 / Confirm Work Activities and Resources for the Work / 6 / 18
F7AA04 / VR 210 / Develop and Maintain Good Working Relationships / 8 / 8
F7AB04 / VR 211 / Confirm the Occupational Method of Work / 6 / 14
FN2J04 / VR 641 / Conform to General Workplace Health, Safety and Welfare / 6 / 12
B66404 / Integrative Assessment in the Construction Industry / - / -
Optional Units: Candidates must complete 3 Units from either Group 1 or Group 2
Group 1 - Solid Plastering: Candidates must complete the following 2 Units plus 1 Unit from the options section
SQA code / SSCcode / Title / SCQF level / SCQF credits
DY8L 04 / VR 76 / Produce Complex Internal Solid Plastering Finishes / 6 / 21
DY8K 04 / VR 77 / Produce Complex External Rendering Finishes / 6 / 21
Group 1 Options
DY2J 04 / VR 68 / Install Direct Bond Dry Linings / 5 / 15
DY12 04 / VR 71 / Install Mechanically Fixed Plasterboard / 5 / 14
F007 04 / VR 80 / Run In-situ Mouldings / 6 / 26
Group 1 Additional Extras
DY94 04 / VR 78 / Produce Granolithic Paving Work / 6 / 22
DY98 04 / VR 79 / Produce Specialised Plasterer's Surfaces / 6 / 25
Group 2 – Fibrous Plastering : Candidates must complete the following 2 Units plus 1 Unit from the options section
DY8P 04 / VR 81 / Produce Complex Plasterwork Moulds / 7 / 29
DY29 04 / VR 82 / Install Complex Fibrous Plaster Components / 7 / 26
Group 2 Options
F007 04 / VR 80 / Run In-situ Mouldings / 6 / 26
F003 04 / VR 83 / Repair Complex Fibrous Plaster Components / 6 / 26