GHULAM SHABBIR
House No. 1756/32-A
Street#14 Qadeerabad,
Multan.
Ph No. +92614032473
Mobile No. +923236719738, +923005147223
E-mail:
Objective: Seeking a responsible and rewarding career in a prosperous growing company where educational back ground, ability and determination are considered valuable.
Education: Diploma of Associate Chemical Engineer.
Professional Experience (More than19 years)
June 2005 to Present Dewan Petroleum Pvt Ltd (Salsabil Gas Plant, Rodho) Pakistan
Position: Process Senior Supervisor
Company Profile: Dewan Petroleum Ltd working as E & P (Exploration and Production) company in oil and gas sector at sufeed Koh block. Dewan Petroleum processing 60 MMscfd of sales gas and 300 bbl of condensate and newly commissioned Chiltan train having capacity 100 MMscfd.
Responsibilities: 1. To operate DCS from a central control room to optimize physical and chemical process of different processing units.
2. Start up and shut down and trouble shooting.
3. Directions to field operators during normal and emergency situations.
4. To coordinate with services department in support of production and equipment maintenance.
5. To optimize plant performance by interpreting plant parameters.
6. Participated in erection,commissioning and smooth operation of following sections
a. Well head operation
b. Three phase separation
c. Gas sweetening by MDEA(Ucarsol)
d. Dehydration(Triethylene glycol)
e. Molecular Sieve
f. Hydrocarbon dew point control by Propane compression unit
g. Condensate stabilization
h. Produced water treatment
i. Sales gas metering
j. Condensate storage and filling
k. Reverse Osmosis unit
Jul 2000 to 2005: OGDCL Pakistan Ltd DHODAK GAS CONDENSATE FIELD
Position: Process Supervisor gas plant
Company Profile:
The Dhodak Gas Condensate field is located in the tribal area of Dera Ghazi Khan, about 230 Kms north-west of Multan. The field was discovered in May 1976 and was brought on regular production in December1994. Dhodak Gas Condensate Processing Pant. Gas Dehydration, LPG Recovery & Condensate Fractionation.
Sales Gas : 50MMSCFD, LPG : 190MT , Naphtha : 1944 BPD
Kerosene : 417 BPD , HSD : 173 BPD, DFO : 112 BPD
Responsibilities: Working as a shift Supervisor at 50 MMSCFD capacity natural gas . purification plant. Excellent Organizational Skills . Experienced with Control Systems and Gas Processing Operation. Ability to read and . understand engineering drawing and specifications . Competent with . DCS, and Pneumatic control systems , RTU,s Ultrasonic Meters, gas . chromatographs SIL systems and associated piping & instrument
dehydration Unit , Hydrocarbon dew Point , Molecular Sieves , .. Condensate flash drum , Sour Water Stripper , RO Unit ( Reverse . .. Osmosis ) ,LPG Unit , Condensate handling & (Filling Section ). .. .. Gas plant Start up & Shutdown / Successfully Grantee run Period. .. DCS & GC Operating on gas plant.
March 1998 to 2000: Dewan Salman Fiber Ltd (DSFL) Unit # 4 Ex-Dhan Fibre Limited Hattar industrial Estate, Hattar Haripur (NWFP)
Position: Process Superintendent (DCS)
Company Profile: DSFL Unit # 4 Manufactures Polyethylene terephthalate (PET) and then staple Fibre. DSFL Unit # 4 process is polymerization of monomer Bi-Hydro-Oxy-Ethylene terephthalate (BHET). Pure terephthalic Acid And Mono Ethylene Glycol Reacts to form Monomer then it Polymerized in a chain of Polycondensation reactors in presence of catalyst (Sb2O3) Polymer undergoes spinning, Drawing and then cut into specific length of staple Fiber.DSFL Unit # 4, Plant design, Engineering and know-how provided by m/s Zimmer Germany.
Responsibilities: 1. To operate DCS from a central control room to optimize physical and chemical process of different processing units.
2. Start up and shut down and trouble shooting.
3. To ensure safe and smooth operation to achieve product quality and quality targets.
4. Directions to field operators during normal and emergency situations.
5. To coordinate with services department for production.
Feb 1995 to Feb 1998: AIF (IBN-e-Rashid Yambu) Saudi Arabia
Position: DCS Operator (Petrochemical Plant) Manufactures Polyethylene terephthalate (PET) and then BGC process is polymerization of monomer Bi-Hydro-Oxy-Ethylene terephthalate (BHET). Pure terephthalic Acid And Mono Ethylene Glycol Reacts to form Monomer then it Polymerized in a chain of Polycondensation reactors in presence of catalyst (Sb2O3) Polymer BGC. Engineering and know-how provided by m/s Zimmer Germany.
Process controlled by distributed control system (Fisher rose mount)
Responsibilities:
Work from pre commissioning, start up, shutdown & successfully guarantee run period after that working on DCS Operator (Petrochemical Plant) Polymer capacity 440 ton per day on ZIMMER Technologe from Germany 1. To operate DCS from a central control room to optimize physical and chemical process of different processing unit
2, To ensure safe and smooth operation to achieve product quality and quality targets.
3, Directions to field operators during normal and emergency situations.
4, To coordinate with services department in support of production and equipment maintenance.
Aug 1991 to Mar1995 Dewan Salman Fiber Limited (DSFL)
Hattar Industrial Estate. Hattar, Haripur (NWFP) Pakistan.
Position: Shift Supervisor / Board Man
Company Profile: DSFL is a joint venture of Sam Yang of Korea, Mitsubishi of Japan and Dewan Salman of Pakistan. DSFL manufactures 51,000 MTPA of polyethylene terephthalate (BHET). Pure terephthalic Acid And Mono Ethylene Glycol Reacts to form Monomer then it Polymerized in a chain of Polycondensation reactors in presence of catalyst (Sb2O3) Polymer undergoes spinning, Drawing and then cut into specific length of staple Fibers.
Responsibilities: Worked in different positions as shift supervisor and then a Board Man, participated in pre-commissioning, commissioning, and master start up of DSFL # 1
1. To supervise and manage operation team to get maximum production as per specification.
2. To co-ordinate with other services department in support of production targets and equipments.
3. Schedule and emergency switch over of equipments.
4. To do chemical cleaning of equipment and reactors after switch over or shut down.
5. To assist in the design and modification of plant layouts and draw rough sketches.
6. Mono & Tri-Ethylene Glycol vacuum distillation.
During Plant Erection Activity Participated in followings:
1. Pressure testing of pipe lines.
2. Vacuum leak test.
3. Level calibration of vessels and reactors.
4. Steaming and flushing of pipelines.
5. First heat transfer oil filling.
6. Pre-commissioning / commissioning and master start up.
7. To review piping layouts in support of a safe operation
June1989 to March1991: SIHALA CHEMICAL COMPLEX (Islamabad)
Position: Operator
Responsibilities:
Worked as Operator at 50 tons capacity weight pigment Plant
Courses & Trainings:
- Fire Fighting Course
- H2S Gas Emergency Evacuation and Rescue
- Basic First Aid Training
- Safe Driving Procedures
- Implementation of Hot, Cold & Confined Space PTW
- Stop Card System
- TQM, ISO 9902 & safety training in Ibn-e-Rushd Saudi Arabia
- Successfully complete course 5186 DCS operator training for continuous console about polymer plant.
Personal Information:
Father’s Name: Muhammad Ali
Date of Birth: September 07, 1968
Marital Status: Married
NIC No. 13302-0538952-7
Languages Proficiency:
1. English
2. Urdu
Computer Skill: MS Office / Internet