Minutes – CuS project meeting, September 6thand 7th, 2011
Date:Tuesday and Wednesday, September 6thand 7th, 2011
Time:09:00 – 17:00 and 9:00 – 16:00
Place:Linz, Austria
See Appendix B for Venue, accommodation and transport
Enclosure:None
Participants:Boštjan Topolovec, SODO (represent Section IPET), SI
Emma Lindgren, Vattenfall, SE
Gerrit Fokkema (Vice convenor), EDSN, NL
Kees Sparreboom, TenneT, NL
Margit Reiter, Energie Ag, AT
Ove Nesvik (Secretary), EdiSys, NO
Sacha Perret, swissgrid, CH
GuestTicket398
pshtvvmgzq
1Approval of agenda
The agenda was approved with the following additions:
- Correction of the ebIX profile, see 10.1 under AOB
- Harmonised role model and definition of accounting point, see 10.2 under AOB
2Minutes from previous meeting
The minutes from previous meeting were approved with the following comments:
- From the previous minutes:
The process Obtain upfront meter reading was discussed and Kees noted that this process actually is a part of the Determine meter reading process from EMD. The Obtain upfront meter reading was replaced by the Determine meter reading process.
The conclusion from previous meeting was re-discussed and it was agreed that this is an additional upfront process of the EMD collect meter read process.
- In the sixth bullet point on page 1 the word stateswas replaced by states.
3Comments to published requirement views version 3.1.A
- Change of Supplier
- End of supply
- Notify MP characteristics
The published documents were reviewed with the following comments:
- The business entities used in the activity diagrams needs to be updated to the business entities reflecting the business documents to be exchanged, in line with UMM:
4Final review of requirements for publication after September meeting 2011
The requirements were reviewed. As homework CuS will do updates and verification by mail and thereafter publish the documents at the ebIX® web-site.
UseCase descriptions: / Responsible for proof reading of document / StatusRequest metering point characteristics / Joachim and Christian /
- Ove will make some final updates
- Thereafter the BRV will be sent on circulation for comments to CuS
Change of balance responsible party / Thilo and Anita /
- Ove will update diagrams and layout
- Thereafter the BRV will be sent on circulation for comments to CuS
Change of transport responsible party / Anita and Sacha /
- Ove will make some final updates
- Thereafter the BRV will be sent on circulation for comments to CuS
Change of metered data responsible / Sacha and Gerrit /
- Ove will update diagrams and layout
- Sacha and Gerrit will review the UC description
- Thereafter the BRV will be sent on circulation for comments to CuS
End of metered data responsible / Gerrit and Leif /
- Ove will update diagrams and layout
- Gerrit and Leif will review the UC description
- Thereafter the BRV will be sent on circulation for comments to CuS
General corrections for all documents:
- Change he or she to it or similar where applicable.
- Remove link to the Structure UC in all UC diagrams.
- The business entities used in the activity diagrams needs to be updated to the business documents to be exchanged, to be in line with UMM.
- Remove “A process area within the European energy market structuring process” form all front pages
- Verify the text in the header
- Verify links
- Verify text in the introduction (about this document) with the text in Change of supplier.
- In the MD model change to the UC Determine Meter Read for Switch under Measure where this is referenced.
- All roles and domains should have the first letter in every word in capital.
- All undefined attributes will be changed to a cardinality of [1]
- Verify that the business entity diagram is updated.
- Change Consumer to Customer where applicable (and also verify the usage of Party connected to grid)
5Final review of requirements for publication after November meeting 2011
The requirements for Query metering point characteristics were reviewed. As homework CuS will do updates and verification by mail and thereafter publish the documents at the ebIX® web-site.
A review of Customer move, both move in and move out, was started and a new UseCase diagram for Customer move in was proposed. However there were several unclear issues and the discussion will have to be continued at the next CuS meeting in the beginning of 2012.
A principle was used during the discussion where a move out (not the CuS process, but the actual move out) will trigger a emptying of all attributes (boxes) in the Metering Point DB for the relevant MP. Contrary the Move In will be used to fill in the empty elements.
Principle 1: Box per box
Principle 2: sets of lids to connect and disconnect
Principle 3: Move leads to emptying of several boxes at the same time .
Kees will come up with a proposal for text for the above principles for the minutes.
UseCase descriptions: / Responsible for proof reading of document / StatusCustomer move, both move in and move out / Leif and Joachim / Will be continued in 2012
Query metering point data for identification / Christian and Kees /
- Ove will update diagrams and layout
- Christian and Kees will update the UC description
- Thereafter the BRV will be sent on circulation for comments to CuS
6Comments to published (hopefully) information models, approved by ETC
- ebIX Business Information Model for Change of Supplier Draft for v3r1A 20110720.doc
- ebIX Business Information Model for End of supply Draft for v3r1A 20110720.doc
- ebIX Business Information Model for Notify MP characteristics Draft for v3r1A 20110720.doc
- XML schemas 20110720.zip
Kees asked if the complete MD model version 2011.A should be published including the unapproved Business Requirements Views. The answer was YES.
7Question from Belgium
Belgium had asked for clarification on the message structure on page 9 in the Business Requirements for Notify Metering Point (MP) characteristics. Belgium is wondering why only “Estimated annual volume” can be part of the “Volume Information”? In Belgium, they have monthly read customers, so they esteem that “Estimated monthly volume” (EMV) should also be a possible element that can be communicated in the message.
The question from Belgium was briefly discussed. It seems from some mail exchange related to the question that the estimated monthly volumes used in Belgium are connected to the reconciliation process and not master data. For the time being we do nothing in the Notify or response MP characteristics.
8Updates of the ebIX® web-site
Review and decide updates of CuS items on the web site.
9Meeting schedule
- March Tuesday 20th and Wednesday 21th, Aarau (Switzerland)
10AOB
10.1Correction of the ebIX profile
From Emma
In the description of Balance Responsible, in the Harmonised Role model, there is an extra “that” in the 3rd paragraph between signifies and quantity.
Kees corrects MD model and HG will be informed at next meeting.
10.2Harmonised role model and definition of accounting point
There has been longer discussions between ENTSO-E and ebIX® related to the definition of the domains Metering point and Accounting point (earlier Local metering point), which has delayed the publication of an updated role model. The latest proposal for definitions was reviewed:
Metering pointAn entity where energy products are measured or computed.
Accounting pointAn entity for which commercial business processes are defined such as balance responsibility and balance supply
Additional information:
These entities are usually defined in a contract.
This is a type of metering point.
The definitions have, among others been discussed and agreed between ebIX® (Vlatka, Kees and Marc), EFET (Liam) and ENTSO-E (Konstantin, Maurizio, Herwig, Cecilia…).
The HG proposal final agreement is:
1)Validation of the new definition in the Harmonization Group: deadline 20th of September 2011. Validation can be carried out by e-mail and if necessary by a telephone conference call which I will organize if necessary.
2)Validation of the definition by the 3 organisations ebIX, EFET and ENTSO-E between the 21th of September and the 21th of October 2011. If all organisations agree to this definition than the new version of the Harmonized Role Model can be published mid November 2011 (after approval by the ENTSO-E Market Committee)
The CuS WG agreed to the definition.
Appendix AMember list
Members:
Name / Company / Telephone / Mobile / E-mailFranz Fischer / AT / Energie Ag /
Margit Reiter / AT / Energie Ag / +4373290003508 / +43 664601653508 /
Patrick Dellaert / BE / UMIX /
Koen Reynvoet / BE / Indexis /UMIX / +32478 340 695 /
Sacha Perret / CH / swissgrid /
Eva Lepperhoff (Convenor) / DE / RWE / +49 20112 49835 / +49162250 4430 /
Joachim (Joe) Schlegel / DE / RWE / +49 2314384426 / +49 1722364396 /
Christian Odgaard / DK / Energinet.dk / +45 76 22 44 63 / +45 23 33 85 55 /
Gerrit Fokkema / NL / EDSN / +31355480 180 / +31622907787 /
Kees Sparreboom / NL / TenneT / +31 622 66 7911 /
Leif Morland / NO / +47 52 86 70 12 / +47 934 08 717 /
Ove Nesvik (Secretary) / NO / EdiSys / +47 22 42 13 80 / +47 928 22 908 /
Tor Heiberg / NO / Statnett / +47 22 52 70 00 / +47 99353 969 /
Emma Lindgren / SE / Vattenfall / +46 8687 3112 / ++46 70311 0957 /
Boštjan Topolovec / SI / Represent Section IPET /
Observers:
Thilo.Lombardo / DE / EDNA / +49241/9671 194 / +49172/7181742 /Anita Buchholz/
Jörg Ferchow / DE / SAP / +49 6227 748487 / +49 171/3085281 /
Stefan Weyand / DE / cx4u /
Erkki Lindepuu / EE / Estonian Energy /
Priit Tampere / EE / Estonian Energy /
Anne Gaëlle Le Saout / FR / EDF Réseau de Distribution /
Danièle Bui / FR / EDF Réseau de Distribution /
Sylvie Malet / FR / EDF R&D /
Juraj Horvat / SK / Vychodoslovenska energetika a. s / +421 55610 2951 / +421 915 932 285 /
Gordon Brown / UK / AMT-Sybex / +44 2 890 781 616 / +44 7 808 901 219 /
Appendix B
Venue, accommodation and transport
Venue:
Energie AG Oberösterreich
Entrance: Coulinstraße / Kärntnerstraße (Corner)
4021 Linz
IBIS Hotel Linz ***
Kärntner Strasse 18-20
4020 LINZ
Hotel Courtyard by Marriott ****
Europaplatz 2
4020 Linz
Hotel Am Domplatz ****
Stifterstraße 4
4020 Linz
Austria Trend Hotel Schillerpark ****
Schillerplatz
4020 Linz
The airport is about 10 km off the city. We recommend to take a taxi (about 20 min, EUR31).
Public transport:
Airport-Shuttle bus every clock hour (6:00 – 19:00) to Linz Central Station (stop Linz Hbf Kärntner Straße)
(EUR 2,60, 19 min),
ebIX/CuSPage: 1