Education / Certificate
1999 / : / Certificate scheme of Welding Inspection Personal (CSWIP Grade 3.0)1999 / : / Completed Certificate Scheme of Welding Inspection.
Personal (CSWIP Grade 3.1) Course
1996 / : / Diploma in Mechanical Engineering, Federal Institute of Technology
1992 / : / Certificate in Technology of Manufacturing Engineering Polytechnic, Kota Bharu
Achievement
Improved presently worked workshop’s ( Jutasama Sdn.Bhd.and Jord Malaysia) quality according to U-Stamp level as certified by ASME.Working Experience
July 2007 – March 2010 / Moody International (M) Sdn. Bhd.Designation / Senior Vender Surveillance Insp.cum Expeditor(Freelance)
January 2007 – June 2007 / Jord Malaysia Sdn. Bhd
Designation / QA/QC Manager
April 2003 – December 2006 / Jord International Pte Limited
Designation / Senior QA/QC Inspector & Expeditor
April 2001– April 2003 / Moody international (M) Sdn. Bhd.
Designation / Engineering Inspector
Oct 1993 – March 2001 / Jutasama Sdn.Bhd.
Designation / Senior Quality Control Inspector
Familiarities
International codes e.g.ASME SECTION 1, ASME VIII DIV. 1, ASME Part II-A, ASME Part II-C, ASME SEC IX & ASME B31.1, API 1104, 661, 16C, 16F, AWS D.1.1 EN 287/288, AS Standard specification and etc. as per client requirement.Duties and Responsibilities at Transocean Offshore International USA.
- Conduct internal progress meeting as well as attending conference call with Houston project team every week for job updates.
- Overseeing the development and implementation of quality assurance processes to maintain proper product functionality on weldingand quality as well as documentation and MRB compilation.
- Survey on Aker Sub Vendor facilities e.g. machining of the Boxes / Receptacle, Guide Plates, Clamps and etc.
- Main task and single contact point for client as well as Transocean sub vendor for deliveryof the free issue items.
- Expedite project and recommend solution to speed up the project delivery date.
- Carry out material inspection and verification on the heat no as per mill certificate.
- Monitor and witness wall thickness measurement / inspection (for plate, pipe, and tubes).
- Monitor and witness dimensional inspection and verification as per cutting plan and uponcompletion of welding.
- Monitor welding and in progress welding surveillance.
- Witness WPS, PQR and WQT qualification as per contractual codes & specifications.
- Witness FAT e.g. Three joint test, Lifting clamps load test, Hydro test, Stab test, and testingsuch as PMI, Surface NDT and etc.
- Verify / monitor Post Weld Heat Treatment (PWHT) activity and review / approve the chart & report.
- Investigate damage / failure and revert to Transocean for further action and clarification for any design deviation found.
- Monitor and witness coating, blasting and painting inspection works if required.
- Monitor and inspect Non Destructive Testing (NDT) such as Dye Penetrant test, Ultrasonic and Magnetic particle test according to code requirements.
- Review NDT reports for final acceptance.
- Witness and monitor assembly of the Riser according to standard and specification requirements.
- Documentation control and Inspection package approval prior to release for assembly of the joint Riser.
- Auditing Sub Vendor whenever necessary.
- Pre-Shipment survey (including packing, marking and supervision of loading inspection) and issue final release note prior to delivery.
Review and accept final MRB.
Inspection Experience as a Vendor lead Surveillance Inspector cum Expeditor
Client / : / Transocean Offshore International – February 2008 ~ 26th March 2010.Job Scope / : / Inspection of Drilling Riser Hundred Five units including pup joints on behalf of Transocean Offshore International USAfor Discoverer Luanda 3504 project. Coverage includes PIM, in progress inspection as per ITP and final inspection before release at Aker Solution Port Klang Malaysia.
: / Global Santa Fe – February 2008 ~ 26th March 2010.
: / Inspection of Drilling Riser of Hundred Six units including pup joints on behalf of Global Santa Fe Singapore for Development Driller III project. Coverage includes PIM, in progress inspection as per ITP and final inspection before release at Aker Solution Port Klang Malaysia.
Duties and Responsibilities at Single Buoy Moorings France and Flour Australia.
- Inspection exercised to perform an independent assessment of the condition of inspection item of specific time interval in order to determine the integrity from point of view of safety and fitness for use at specific design condition. The method of assessment will normally confine to physical thorough visual examination, supplemented by non-destructive test.
- Responsible for providing technical assistances to Client, Monitoring, Inspection, Co-ordination, Expediting and Presenting information to Client in their Technical area.
- Review fabrication documentation which includes WPS, PQR, Welder qualification, relevant drawing, mill certificates, NDE & PWHT report, Procedures, Inspection report and etc. Any repair or modification which will constitute an important input with regards to final decision on the acceptance of the proposed repair or modification, which effect the integrity upon completion of thorough visual examination a professional judgment about the condition of inspected item to be forwarded to client in the standard report format.
- Witnessed and endorsed welding procedure qualification test (WPQT) and welder performance qualification test (WQT).
- Review radiography film & report witness Mechanical Test for WPQT, WQT, Process Piping, Pressure Vessel and other welding works as well.
- Inspect Pressure Vessel which newly fabricated and witness Hydrostatic test.
- Verify equipment used in the inspection and informed the result to the vender as well as to client.
- Managing and direct QC department and to guide the mechanical engineers to meet the quality standards
- Review inspection records, suggesting and recommend for the findings of deterioration or defect that might have an impact in quality. Suggest method of repair if required to be undertake prior to further and follow-up to ascertain that fabrications accordance with codes acceptance, standards and specifications.
- Ensure fabrication is undertaken strictly in conformance to the ITP and fabrication procedures. The equipments delivered with acceptable quality. Customer punch list and NCR’s properly raised and closed out.
Client / : / Single Buoy Moorings. – October 2007 ~ January 2008.
Job Scope / : / Inspection of forty three units Pressure vessels at Vessel Tech and AMC Kuantan. Work involves Witness of NDT, HT, Dimensional, Fit-Up Joint, Surface Preparation / Painting and FAT. Other inspection is monitoring of welding activities and welders approval.
Client / : / Fluor – July 2007 ~ September 2007
Job Scope / : / Inspection of Bearing House (SAG Mill) Six unitson behalf of Fluor Perth Australia for Oxiana Prominent Hill Project. Coverage includes PIM, in process inspection as per ITP and final inspection before release at Steeline Engineering Malaysia Sdn Bhd Rawang Malaysia.
Duties and Responsibilities at Jord Malaysia & Jord International Pte Limited
- Ensure fabrication is undertaken strictly in conformance to the ITP and fabrication procedures. The equipments delivered with acceptable quality. Customer release notes and NCR’s properly raised and closed out.
- Continual quality improvements, monitor and reduction of fabrication re-work.
- Review documents / MDR for projects submitted to Singapore office with clear instructions.
- Projects planning, status reporting, expediting and resolving issues to maintain delivery schedule.
- Sub component and materials receipt and handling correctly identified quantity and specified and stored.
- Nurturing relationships with Departments Occupation Safety & Health (DOSH), customer, third party inspector and Jord fabrication partner.
- Authorise to sign off on acceptance quality and what is not acceptable to halt project where activities are accordance to Jord Procedures.
- Perform welding procedure and performance qualification as per code / customer requirements, documentation and record keeping / updating.
- Preparation of weld plan & test plan / QA plan, PWHT analysis and review.
- Consumable planning, testing and monitoring.
Inspection Experience as a Quality Manager / Senior QA/QC Inspector & Expeditor
Client / : / Technip/France.Job Scope / : / Inspection of Fuel Gas Mixing Drums (3 units) on behalf of Technip France for Qatar gas LNG Debottlenecking project. Coverage includes PIM, in process inspection as per ITP and final inspection before release.
Client / : / PSC-Resak Compression Platform Project
Job Scope / : / Inspection of scrubber package at Kvaerner Process. Work scope involves from material receiving to final inspection prior to delivery to site.
Client / : / Nooter Eriksen, USA
Job Scope / : / Inspection of 7 numbers HRSG boilers at AMC, Subang. Daily monitoring of work, dimensional inspection, headers hole drilling monitor and final inspection prior to delivery of material to AMC Kuantan for further fabrication
Client / : / Phillips Petroleum Pty Ltd, Australia – Bayu Undan Gas Recycle Project.
Job Scope / : / Complete Inspection of 6 in numbers Miscellaneous Filters Package at Syarikat Steelcon. Work involves Witness of NDT, HT, Dimensional, Fit-Up Joint, Surface Preparation / Painting and FAT. Other inspection is monitoring of welding activities and welders approval. Reporting of status and any deviation from the BHP specification used in this project.
Client / : / Dow USA
Job Scope / : / Inspection of 3 units of two bundles each ACHE (Low Temperature Service) and 2 units of tube bundle each ACHE at Jord sub supplier Atjori . Work involves monitoring of welding activities, material receiving & verification, marking & cutting monitoring, witness of fit-up, witness PWHT, witness Charpy impact test, witness cleanliness prior to closing, witness Hydrotest, Witness mock up test, witness final dimensional and witness of FAT
Client: / : / Dow Benelux, Germany
Job Scope / : / Inspection of 18 numbers of header boxes fabrication from 25.4mm to 63mm thickness for ACHE at Jord sub supplier Ajori. Work involves as per Client Dow scope except for and FAT
Client: / : / Bechtel International, Malaysia
Job Scope / : / Inspection of 1 in number Propylene Oxide Shell and tube Exchanger a Ikatan Engineering. Work involves material verification, fit-up inspection, overlay, and SS304L welding inspection, welding monitoring, in progress / final dimension inspection, witness of pneumatic and hydrostatic test.
Client: / : / McConnell Dowell, Australia
Job Scope / : / Inspection of various type material/thickness API 661 ACHE at Tepat Teknik and 80m stack at Pentagon for the BP NAM CON Project. Work includes complete inspection from receiving material to performance test and delivery inspection.
Inspection of 80 Meter Flare Stack package at Pentagon for the BP Nam Com Son Project. Work involves from material receiving inspection till delivery
Client: / : / J P Kenny, U.S.A
Job Scope / : / Inspection of A, B, C, D, E, F, and G type Aluminium bracelet anode for the Bombay Pipeline project at MPE. Work includes inspection of formulation, raw material, anode, moulds, anode cores, furnace preparation, production casting, melting, sampling, anode casting, anode marking, anode painting, laboratory test which includes chemical composition, electrochemical potential and capacity test, finish anode visual, dimension and weight check, packing, storage and delivery.
Client: / : / Clough Offshore Engineering, Australia
Job Scope / : / Inspection of 4 shell and tube heat exchangers with copper nickel cladding and 7 in nos. pressure vessel (cladded) at KNM, Melaka for The Transfer of Hydrogen From SHU to MAA Project. Inspection scope from material receiving, WQT, fit-up/edge preparation monitoring, welding monitoring, final visual & dimensional inspection, NDE witness/review, HT witness, surface preparation check, packing and preservation inspection.
Client: / : / Malaysia Shipyard & Engineering Sdn Bhd
Job Scope / : / Inspection of 1 unit Air Compressor and Dryer Package at Ingersoll-Jati Malaysia Sdn Bhd for E11 K project and 2 units pump skid package for Lundin Project. Work involves material verification, marking, cutting, welding, monitoring, fit-up NDT, dimensional and visual inspection, witness hydrotest surface preparation / painting, FAT and review documentation including packing and delivery.
Inspection of 2 units of pump skid package for the Lundin topside Project. Work involves material receiving, fit-up & welding inspection, visual & dimensional inspection, hydrostatic test witness, leak test witness, performance test witness, blasting and painting monitor and final packing and delivery inspection
Client: / : / GEA Power Cooling Systems, Inc U.S.A
Job Scope / : / Inspection Structural Steel and steam ducting for GEA-TIC Front Range Power Project and Bechtel Athens Power Project at Kai Peng Berhad. Resident Inspector till delivery of materials to site
Client: / : / Airliquid, UK
Job Scope / : / Stage and final inspection of HRSG at Tepat Teknik. Scope of work is material verification, final dimensional / visual, and painting and shipment inspection.
Duties and Responsibilities at Jutasama Sdn. Bhd
- Conduct Q.C. meeting with Client, Contractor and Sub-Contractor prior to start of work.
- Verify materials and accessories which included Plates, Pipes, Pipe Fitting, Studs, Bolts, Gaskets, Valves and instruments.
- Carry out inspection on vendor’s sub contractor place.e.g. Dish head forming, Thick wall shell rolling and etc.
- Advice and carry out inspection on repairing work on Pipe Line, Pressure Vessel, Column, Heat exchanger and etc.
- Inspect marking, cutting, rolling, fit-up, welding, visual, dimensional on fabrication , erection and installation of Pressure Vessel including heavy wall and Cladded for process equipment Storage tanks, Hot oil heater, Column, Steel structural, Diverter, system, Reactor, Filters, Hopper, Pipe line and Heat exchangers for process Plant and oil and gas industries.
- Carry out in house Dye-penetration testing on welded dish head.
- Nozzles collar, nozzle to shell joint and etc.
- To arrange Radiography test, Magnetic particular test, Dye-penetration test, Ultrasonic test and Post weld heat treatment by third party according to spec. and codes.
- Review and approve the Radiography film and all above mention tests.
- To carry Hydrostatic test upon completion of equipment and arrange witnessing by third party and DOSH for approval
- To prepare WPS , PQR , WQT and carry out PQR and WQT testing witnessing by third party and DOSH according to international code standard and requirement.
- To witness the mechanical testing at testing lab.
- To carry out inspection on vendors Blasting, Painting,PWHT, and etc. according to spec. and codes.
- Finally collect and compile all reports to prepare the manufacturing data report (MDR) for individual equipment.
Inspection Experience Senior Quality Control Inspector
Client / : / Technip Geoproduct Malaysia Sdn. Bhd.Owner / : / Cabot Malaysia Sdn. Bhd
Project / : / CMSB 3 ProjectPort Dickson.
Job Scope / : / Fabricate, erection and installation six (6) units of Silo eight (8) units of main unit filters, dryer, reactor and feedstock heater.
Owner / : / Ministry of Oil & Gas industry & Mineral Resources of Turkmenistan.
Project / : / Turkmenbashi MSCC Project.
Job Scope / : / Fabricate and erection seventeen (17) units of carbon steel drums.
Owner / : / Titan Polyethylene (M) Sdn. Bhd.
Project / : / 100 KTA HDPE Project Pasir Gudang Johor.
Job Scope / : / Fabricate and erection one (1) unit stainless steel Hopper at Pasir Gudang site.
Owner / : / Vinyl Chlorida ( M ) Sdn. Bhd
Project / : / Kertih Polyvinyl Chlorida Project (KPVC)
Job Scope / : / Fabricate and erection three (3) units of stainless steel storage tank at kertih site
Owner / : / Titan Polyethylene (M) Sdn. Bhd.
Project / : / 100 KTA HDPE Project Pasir Gudang Johor
Job Scope / : / Fabricate one unit of Drain Pot and one unit of LP Holding drum U-Stamp drum for Titan HDPE Project.
Owner / : / Petlin Kertih Terangganu Malaysia
Project / : / Kertih LDPE Project Malaysia.
Job Scope / : / Twenty- Six units of Carbon Steel and Stainless Steel Pressure Vessel.
Client / : / GEA - Btt
Owner / : / Northern Utility Resources Sdn. Bhd.
Project / : / KHTP Independent Power Utility Project
: / Job designated was to carry out QA/QC, Supervising on job done to finalise documentation and quality rendered in house and by vendors. Example: painting and insulation.
Owner / : / Northern Utility Resources Project
Project / : / KHTP Independent Power Utility Project
: / Fabricate Manifolds 4 sets (115 ton), Steam duct 2 sets (175 ton)
Client / : / Letec Diverter & Exhaust System B.V.
Owner / : / Petronas Gas Berhad Malaysia.
Project / : / CUF - Kerteh Power Station Malaysia.
Job Scope / : / Job designated was to carry out repairing off 6 unit’s diverter on structural welding cracks. Being in charge of the entire project at site, scop of work also includes meeting client for job planning, carrying out usual inspection and dye – penetration test upon completion of welding, submission of job report for client approval
Client / : / Oil-Line Engineering and Associate Sdn. Bhd
Owner / : / Esso Production Malaysia Inc
Project / : / Larut ‘A’ Central Processing Platform.
Job Scope / : / Fabricaton of Six (6) units of Carbon Steel and Claded Heat Exchanger.
Owner / : / Petronas Carigali Sdn. Bhd.
Project / : / Angsi ANPG - A Central Processing Platform.
Job Scope / : / The scope of work involves TEMA ‘R’ court for 11 units Heat Exchanger for Petronas Carigali Sdn. Bhd. (PCSB) for ANGSI-A Central Processing Platform and 6 units of Heat Exchanger for ESSO production Malaysia Sdn. Bhd. constructed for Larut ‘A’ Central Processing Platform located at South China Sea of east coast of Peninsular Malaysia.
Client / : / JJE Lurgi Engineering ( M ) Sdn. Bhd.
Owner / : / Intercontinental Speciality Fats Sdn. Bhd.
Project / : / 200 TPD SCD Plant.
Job Scope / : / Fabricate seventeen (17) units of carbon steel and Stainless steel pressure vessel, sixteen (16) units of heat exchanger and sixteen (16) units of atmospheric tanks.
Owner / : / Akzo Nobel Oleo chemicals Sdn. Bhd.
Project / : / C 096 - 96 Akzo Nobel.
Job Scope / : / Fabricate twenty-one (21) units of carbon steel and Stainless steel pressure vessel, ten (10) units of Heat exchanger.
Owner / : / Intercontinental Speciality Fats Sdn. Bhd
Project / : / C 104 - 97 1000 TPD Refinery Plant.
Job Scope / : / Fabricate fourteen (14) units of carbon steel and Stainless steel pressure vessel, six (6) units of Heat exchanger and six (6) units of atmospheric Tanks.
Client / : / Kaneka Engineering Corporation.
Owner / : / Poly plastic Asia Pacific Sdn. Bhd.
Project / : / MP - 1 Project.
: / Fabricate one (1) unit of duplex/stainless steel Reactor column and carbon steel Re boiler, three (3) units of stainless steel columns, thirty-six (36) units of stainless steel / duplex heat exchanger and seven (7) units of carbon steel / stainless steel pressure vessel.
Client / : / Letec Diverter & Exhaust System B.V.
Owner / : / Petronas Gas Berhad Malaysia.
Project / : / CUF - Kerteh Power Station Malaysia.
: / Fabricate, insulate and test the flap on three (3) Units of Diverters.
Owner / : / Northern Utility Resources Sdn. Bhd.
Project / : / KHTP Independent Power Utility Project
: / Fabricate, insulate and test the flap on four (4) units of Diverters and Exhaust duct for Kulim Power Station
Client / : / MHE Demag Logistic ( M ) Sdn. Bhd.
Owner / : / Kuala LumpurInternationalAirport (KLIA)
Project / : / KLIA supporting steel structure for Automatic Monorail
: / Fabricate, insulated the steel structure For KLIA Automatic Monorail.
Client / : / Challenge Engineering Ltd.
Owner / : / Milk Product Holding (Sea) PTE. LTD.
Project / : / Apollo Project
: / Fabricate, installed the pipe line and pipe rack for milk processing plant.
Client / : / Unichema ( Malaysia ) Sdn. Bhd.
Owner / : / Unichema
: / Fabricate and Erected three (3) unit of stainless storage tank for product storage at Unichema site (Malaysia) Sdn. Bhd.
Listed below are the companies / organisations services rendered to apart from above
mentioned;
- Sumitomo Chemical Engineering Co. Ltd.
- Nestle Food (Malaysia) Sdn. Bhd.
- Samsung Corning (Malaysia) Sdn. Bhd.
- Zanwa Sdn. Bhd.
- Henkel Oleochemicals (Malaysia) Sdn. Bhd.
- HexagonTower Sdn. Bhd.
- Southern Energy Sdn. Bhd.