Document 007300Supplementary Conditions (Two-Year College Sample)

Edit this sample document to include conditions specific to the Two-YearCollege’s projects.

Certifications

These Supplementary Conditions amend and supplement the General Conditions and other provisions of the Contract Documents as indicated below. All provisions not amended remain in full force and effect. The terms in these Supplementary Conditions defined in the Contracting Definitions or the General Conditions shall have the meanings assigned to them in those documents.

These Supplementary Conditions are authorized, by the Ohio Facilities Construction Commission, for use on projects constructed by and for «insert Two-Year College name».

Insert the name and relevant general contact information for the Two-YearCollegebelow.

Contracting Authority and Owner

«insert Two-Year College name»

«insert street address»

«insert city, state zip code»

«insert phone number»

«insert website»

Insert the name and title of the Person (Institutional Designee) acting in the place of the Executive Director of the Commission.

Institutional Designee

«Institutional Designee»

«Title»

Modifications to General Conditions

Insert modifications to the General Conditions that are applicable for projects specific to the Two-YearCollege below. Prior to use on any project, modifications must be authorized by the Commission in consultation with the Attorney General’s Office. The Commission will post authorized Supplementary Conditions on its website and must be downloaded from that location. A link to that location may be included on the Two-YearCollege’s website. The sample provisions below eliminate the EDGE program language.

Delete Section 1.8 in its entirety.

ReplaceSection 9.3.1with the following:

9.3.1Within 10days of receipt of the Notice to Proceed, or other period as mutually agreed by the Contractor and the Contracting Authority, the Contractor shall submit to the A/E a Schedule of Values on a form published by the Commission, with separate amounts shown for labor and materials for each branch of Work, following the numbers and titles of the Construction Specifications Institute’s MasterFormat for individual work results, or UniFormat for assemblies in place.All costs shall indicate labor and material cost associated with each item specified on the cost breakdown.

Delete Section 9.3.1.1 in its entirety.

Delete Section 9.4.1.6 in its entirety.

Delete Section 9.8.2.6 in its entirety.

Insert additional revisions to the General Conditions that are applicable to projects by and for the Two-Year College below and place them in order with the sample provisions above.

Insert Sections X.X, X.X.X, X.X.X.X, and X.X.X.X.X as follows:

X.X«Paragraph»

X.X.X«Subparagraph»

X.X.X.X«Clause»
.X«Sub-clause»

In Section X.X.X, replace the first sentence with the following:

Replace Section X.X.X with the following:

Delete Section X.X.X.

Insert Supplementary Conditions that are applicable to projects by the Two-YearCollegebelow.

Insert Article 13 with associated Sections as follows in its entirety:

ARTICLE 13 -Miscellaneous Supplementary Conditions

13.1«Paragraph»

13.1.1«Subparagraph»

13.1.1.1«Clause»
.1«Sub-clause»

END OF DOCUMENT