Courses:June 1995
High Voltage Protection Systems Design
University Of Victoria & ESAA
April 1996
Insulation Co-ordination in High Voltage AC Systems
University Of Queensland & ESAA
July 2000, July 2003
Integral Energy Resuscitation and Rescue Training
September 2000
Integral Energy HV Access Permit Issuers and Recipients Training
March 2001
Citect Configuration and Programming
September 2002
Confined Space Entry/Access training
Licenses
Qualified Supervisor Certificate
Electrician
Lisc # 29702S
Contractor License
Electrical
Lisc # 116667C
Performance Electrics
BRN # BN97704299
ABN # 84 083 197 624
Summary of Experience
2001 - present
Performance Electrics
Sydney, NSW
Self Employed Electrical Engineering Consultant (Power System Specialist). Working in co-operation with E.J. Reynolds Consulting
All aspects of High Voltage power system analysis and design including Generator transient stability, Loadflow, Protection Co-ordination, Harmonic Filtering, Power Factor Correction and DC Traction.
Experienced in new and existing heavy industrial power systems within NSW, Victoria, South Australia and Tasmania.
Recent projects include:
- Proposed and Existing heavy industry plant 33kV and 11kV power system detailed review of loadflow and protection systems review and resetting – NSW Metropolitan, Wollongong, South Australia
- NSW Passenger Rail SystemTrain Demand Modelling, 1.5kV DC system load modeling based on future timetable, DC CB protection setting calculation, DC overhead wiring thermal modeling, rectifier and rectifier transformer thermal modeling, 33kV and 11kV AC supply system load flow modeling and protection analysis –RailCorp NSW
- 415V/22kV Generator Transient Stability simulation and analysis with subsequent protection system design – Victoria
- 6.6kV Generator Transient Stability simulation and analysis of interconnection arangement – South Australia
- 22kV Power factor correction design to 40 MVAr – Tasmania
- 110kV to 22kV and 3.3kV industrial power system capacity review - Tasmania
- Transformer inrush time domain simulation – Queensland
- 6.6kV to 415V industrial system power supply security analysis and recommendations – South Australia
- 33kV 16 MVAr damped second order harmonic filter design - Wollongong
- 6.6kV system harmonic filter commissioning investigation and design review – NSWCentralCoast
- 33kV/415V rural system fault study and analysis – NSW Rural
- Development of three phase time domain 22kV to 240V Submerged Arc Furnace model using Matlab
- Developed Excel based software “PowHarm” for analysis of load flow, fault level, protection system timing, harmonic distortion analysis and harmonic impedance calculation using a single model description. To be used in professional consultancy with the aim of reducing cost to the client via more efficienct analysis tools.
1998 - 2004
Crane Enfield Metals
Penrith, NSW
Plant Electrical Engineer
De-commissioned 450 Hp Westinghouse variable speed drive system and replaced with digitally controlled reliance DC drive.
Automated high speed machine control withmaterial position sensing using linear camera sensor. Position sensing provides an infeed system speed feedback loop to otherwise manually controlled machinery.
Implemented high speed servo control systems based on Allen Bradley SLC500 and PLC5 platforms. Projects included hydraulic travel shear control, upgrade of DC motor based ball screw cut to length carriage control with AC spindle motor speed control and outer position control loop, Re-wrote triple draw cascade PLC5 program to make a highly automated non functioning German machine operate as intended, Data Highway Plus networking PLC systems to integrate and fully automate several machines and processes.
Analysis and post commissioning optimization of PVC copper tube lagging extrusion machine to improve reliability and machine throuput.
Designed and built automated ultrasound concentricity meter. Designed and built sound detection system for extrusion process machine protection.
Designed and built several pneumatic and hydraulic control systems.
Designed, built and commissioned 415V harmonically tuned, 18 step switched capacitor bank for power factor correction of 3500 tone extrusion press.
Implemented Gas furnace control to increase productivity and quality in heating copper billets ready for extrusion.
Detailed specification and installation supervision for $1.25M Extrusion runout upgrade.
Supervised numerous electricians, fitters and dual trade apprentices in breakdown repair work.
1994 - 1998
BHP Engineering
North Sydney, NSW
Electrical Engineer: Power Systems Consultant
High voltage power system design and evaluation for Dc Drive Rolling Mills, Cycloconverter driven Rolling Mills, Tin Plating Mills, Electric Arc Furnaces, Submerged Arc Furnaces.
Developed and applied analysis techniques to design power factor correction and harmonic filtering installations. The role involved intensive modeling and analysis of transient switching, steady state operation and frequency response characteristics.
Typical analysis included fault level calculations, load flow, harmonic penetration studies, voltage flicker analysis, protection system analysis and design, operational security analysis, transient modeling, installation layout design, supply specification, commissioning and testing specification.
Projects included BHP Temco 22kV Upgrade, BHP Port Kembla Steel Works Hot Strip Mill 33kV Harmonic Filter upgrade, BHP Port Kembla Steel Works Tin Mill 2000 11kV harmonic filter design, BHP Steel International Thailand Flat Products Project 22kV Harmonic filter design, BHP Steel Delta Ohio Rolling Mill, BHP Steel Sabayek (Saudi Arabia) Manganese plant, BHP Steel Sydney Mini Mill, Shorko Australia 22kV & 415V staged PFC, Comalco Power Factor Correction Analysis.
Designed and specified for manufacture a 37MVAr harmonic filter installation approved by the Thailand Provincial Electricity Authority which was installed as a key part of a BHP Cycloconverter driven Rolling Mill. The 22kV filter was commissioned in June 1997.
Undertook technical investigation projects including Electric Arc modeling for Electric Arc Furnaces, High powered capacitor bank switching stress analysis, Equipment failure analysis, Commissioning failure analysis.
1990 - 1994
CityRail Engineering
Sydney, NSW
Cadet Electrical Engineer
Industrial experience included exposure to high voltage AC and DC power system design and maintenance.
Gained experience with 1500V DC traction system overhead wiring design, 1500V DC circuit breaker maintenance, HV AC oil immersed circuit breaker maintenance, substation maintenance, distribution system transmission line design, DC and AC protection systems, Low voltage installation, capital projects budget forecasting, worksite co-ordination and supervision.