HERTFORDSHIRE COUNTY COUNCIL

Waste Management PANEL

THURSDAY 29 JUNE 2006 at 2.00 P.M.

HERTFORDSHIRE WASTE PARTNERSHIP STUDY TOUR TO WASTE TREATMENT SITES IN GERMANY

Report of the Director of Environment

Author: Matthew Evans Tel: 01992 556174

Executive Member: Derrick Ashley

1. / Purpose of report
1.1 / To summarise to the Panel the Hertfordshire Waste Partnership’s (HWP) waste treatment study tour to Germany and explain how it links with the Joint Municipal Waste Management Strategy for Hertfordshire.
2. / Background
2.1 / Between 22-24 May a group of Officers and Councillors representing the Hertfordshire Waste Partnership (HWP) travelled to Germany to visit waste disposal/treatment sites. The trip was facilitated by the Department for Environment, Food and Rural Affairs’ (Defra) Waste Implementation Programme (WIP).
2.2 / The trip was organised to help implementation of the Hertfordshire Joint Municipal Waste Management Strategy, part of which involves delivering future waste disposal infrastructure for Hertfordshire. The trip entailed visiting working examples of some of the potential disposal options available to Hertfordshire to assist with the diversion of biodegradable waste from landfill. These facilities were unavailable in the UK or were only available on a limited scale.
2.4 / The following were the main objectives of the visits:
·  Understand how the plants operate and perform, particularly against the recycling/landfill diversion targets Hertfordshire faces
·  Form an impression of their environmental impacts
·  Understand the economics of the processes (given that it would be within the German context)
·  Assess their potential use in Hertfordshire set against the planning framework, public opinion and the urgency of the Hertfordshire situation.
3. / The Sites
3.1 / Four sites were visited, each treating residual Municipal Solid Waste (MSW), including 3 Mechanical Biological Treatment (MBT) plants and an Energy from Waste (EfW) plant. All sites were receiving residual waste collected from within areas where kerbside recycling initiatives were in operation.
3.2 / MBT is a generic term encompassing a variety of technologies, but all of which involve some sort of mechanical sorting and separating of the waste and also a biological treatment of the waste to change its form. The aim is to treat and separate out MSW into useable fractions for materials and/or energy recovery.
3.3 / The MBT plants all involved a mechanical sorting and preparation process and biological treatment although the order and technicalities of these processes differed. Each produced a combination of the following outputs: material for recycling (possibly including inert material to landfill), a stabilised material which can be landfilled and a fuel. The output produced is dependant on the particular process used which, in turn, is driven by the requirements of the ‘customer’.
3.4 / Herhof Biodrying MBT (Osnabruck)
·  pre-shredding
·  aerobic digestion (Biodrying) – using the natural biological activity within waste to generate heat and dry the waste
·  mechanical separation
·  metals recycling
·  inert material separation (used in landfill engineering)
·  RDF production
Issues (negative):
Limited holding capacity (inflexible in the case of breakdown)
Biological element of RDF minimally reduced should an outlet not be found for the RDF and it subsequently landfilled
Issues (positive):
No apparent odours or excessive noise
As heavy metals are removed before the RDF is produced, less onerous cleaning of exhaust fumes required compared to traditional EfW.
Not a large footprint
3.5 / Pohlsche Heide Anaerobic Digestion MBT
Located at a landfill site which had vast amount of void space
Included separate composting facility on site
·  Shredding and sieving
·  Mechanical separation – metal separation
·  Size separation (<60mm directly to biological; >60mm organic fraction and mineral component further separated with sieve and then further shredding
·  Anaerobic digestion – methane into Combined Heat and Power Plant (CHP); 0.5MW of electricity and heat used on site
·  Aerobic digestion – (composting) and sent to landfill as stabilised
·  Bio-stabilised waste to landfill
·  RDF to commercial gasification plant
Issues (negative):
Large footprint (waste is retained on site for 10 weeks)
1/3 of total input sent to landfill (requiring landfill void)
Issues (positive):
Low building and stack
3.6 / Neumunster MBT with Biodegma process
·  Mechanical separation (sieving of high calorific fraction. <80mm further processed removing metals and sent to in-vessel composting (aerobic digestion))
·  Aerobic digestion (material dried and further refined to produce a fuel)
·  >80mm further crushed and metals and contaminated materials separated. Fed into Neumunster CHP.
Issues (negative):
Poor quality of material separated for recycling
Issues (positive):
3.7 / Hamburg Energy from Waste
·  Traditional energy from waste plant
·  Two incinerator units with grate firing and waste throughput of 21.5t/hour – can be operated independently of each other
·  Metal removed for recycling
·  Bottom ash stored then used as aggregate
·  Provides heat and power for local residents and industry
·  Electricity sold and exported to grid
Issues (negative):
Large stack
Issues (positive):
Requires no further disposal outlet other than small amount to landfill
3.8 / Appendix 1 summarises the key data for each site.
4. / Relevant points to consider
4.1 / All of the plants used gas cleaning systems to remove pollutants from the exhaust gas or to reduce its carbon content.
4.2 / It should be noted that in Germany the Landfill Directive was implemented differently from the UK in that, from June 2005, untreated waste could no longer be sent to landfill. This resulted in a saturation of the market with new RDF and a lack of capacity to use it as a fuel. Whilst this was particular to the German industry, it illustrated the sensitivity of MBT to the RDF market. MBT plants which produce a RDF will require an outlet to burn it and without such an outlet, the MBT facility will not sufficiently divert BMW from landfill.
4.3 / Possible outlets for RDF in the UK at the present time are limited to Combined Heat and Power plants (CHP) and cement kilns, although Defra are working towards improving the UK RDF market.
4.4 / Hertfordshire faces a time pressure as a result of the Landfill Allowance Trading Scheme (LATS), meaning that it is likely that some form of disposal/treatment facility will be needed by 20011/12. This places restrictions on the type of facility which could be made operational within this timeframe.
Taking into account current waste projections for Hertfordshire, it is anticipated that by 2012 there could be 300,000 tonnes of waste requiring treatment and disposal.
5. / Conclusion
5.1 / At the closing discussion of the study tour, it was felt that communication with the public will clearly be a very important aspect of delivering waste disposal facilities for Hertfordshire. The WasteAware team has begun working with Communications to develop a communications strategy.
5.2 / The Waste Disposal Options paper, produced as part of the Waste Strategy review, will be considered in light of the treatment facilities viewed on the study tour.
5.3 / This report, together with any further advice or views of the Panel, could be made available to each of the Hertfordshire Waste Partnership authorities for information.
6. / Financial Implications
6.1 / There are no financial implications of this report.

item 2 study tour

1

Appendix 1: Summary of key data for each waste treatment site

Type / Input Tonnage (per year) / Feedstock / Output / Capital Cost (€) / Gate Fee (€ per tonne) / Fee To Burn RDF (€ per tonne) / Land Area
MBT Osnabruck / Biodrying / 90,000 / MSW / 53% RDF
30% condensate
12% inert (landfilled)
5% Metal (recycled) / €25 million / €78 (low due to the plant being taken over from another company that went into insolvency) / €50-60 / Total site: 20,210 m²
Buildings: 6,063 m²
MBT Minden Polsche Heide / Anaerobic followed by aerobic digestion / 100,000 / 40% MSW
40% commercial
12.5% sewage sludge
7.5% other sludges / 33.5% stabilised material to landfill
32% RDF
16.5% moisture losses
8.3 % miscellaneous
2.5% metals / €26 million / € 140 / unknown / Total (incl landfill): 800,000 m²
Buildings: 11,500 m²
Traffic area: 14,500 m²
MBT Neumunster / Aerobic digestion / 260,000 / 200,000 MSW
60,000 commercial / 40% RDF to ChP
12% biostabilised material to landfill
10% inerts
5% rejects (landfill)
5% light plastics (fuel or recycled)
3-5% metals recycled / €40 million / €90-100 / €50-70 / unknown
Hamburg EfW / Conventional incineration / 320,000 / MSW / 22.5% bottom ash (used as aggregate)
2.7% metal recycled
1.9% fly ash landfill
1.3% Hydrochloric acid sold and recycled
0.6% salts to mine storage
0.3% gypsum landfilled
Heat and power to local residents and industry
Electricity sold to the grid / €230 million / € 130 / Not applicable / Total site: 63,000 m²

item 2 study tour

1