Subsequent to the pre bid discussions conducted at NRSC ES Shadnangar on 09/03/2018 following clarifications are issued
Sl.No / IN RFP / IN COMPLIANCE STATEMENT (ONLINE)Existing Clause / To Be Read As / Existing Clause / To Be Read As
01 / VI(a).Three axis tracking Pedestal sub assembly at pageno: 10.
The tracking pedestal sub assembly consists of the following major parts, namely Train axis housing, Azimuth housing, Elevation housing, Yoke fixing plates, Yoke arms, Counter weights, Antenna mounting frame and stow lock mounting brackets. All the 3 stages of tracking pedestal (Azimuth, Elevation and Tilt housing) will have Leveling mechanism to maintain parallel or perpendicularity to the ground plane. / VI(a).Three axis tracking Pedestal sub assembly at pageno: 10.
- The tracking pedestal sub assembly consists of the following major parts, namely Train axis housing, Azimuth housing, Elevation housing, Yoke fixing plates, Yoke arms, Counter weights, Antenna mounting frame and stow lock mounting brackets.
- Tilt housing (bottom housing) will have machined base for Leveling purpose to maintain parallel or perpendicularity to the ground plane.For Azimuth and Elevation housing leveling /verticality/parallelism shall be maintained during the machining of respective modules.
- Provision for routing of RF, Servo & Power cables through the AZ/EL/Train housings to be provided.
- All the 3 axes will have hand cranking facility.
First row:
- The tracking pedestal sub assembly consists of the following major parts, namely Train axis housing, Azimuth housing, Elevation housing, Yoke fixing plates, Yoke arms, Counter weights, Antenna mounting frame and stow lock mounting brackets.
- All the 3 stages of tracking pedestal (Azimuth, Elevation and Tilt housing) will have Levelingmechanism to maintain parallel or perpendicularity to the ground plane.
First row:
- The tracking pedestal sub assembly consists of the following major parts, namely Train axis housing, Azimuth housing, Elevation housing, Yoke fixing plates, Yoke arms, Counter weights, Antenna mounting frame and stow lock mounting brackets.
- Tilt housing (bottom housing) will have machined base for Leveling purpose to maintain parallel or perpendicularity to the ground plane. For Azimuth and Elevation housing leveling / verticality / parallelism shall be maintained during the machining of respective modules.
- Provision for routing of RF, Servo & Power cables through the AZ/EL/Train housings to be provided.
- All the 3 axes will have hand cranking facility.
02 / VI (b). ANTENNA
REFLECTOR SUB ASSEMBLY AT PAGE NO.15:
Antenna reflector assembly consists of radial panels, radial trusses, central hub, bracing members, Z-Sections, cleat angles, web connecting cleats, sub reflector, sub reflector mounting bracket, quadruped assembly, junction box and lightning arrestor & aviation lamp assemblies etc. / VI (b). ANTENNA
REFLECTOR SUB ASSEMBLY AT PAGE NO.15:
Antenna reflector assembly consists of radial panels, radial trusses, central hub, bracing members, Z-Sections, cleat angles, web connecting cleats, sub reflector, sub reflector mounting bracket, quadruped assembly, junction box and lightning arrestor & aviation lamp assemblies etc. The power & earthingcables for aviation lamps and lightning arrestor will have separate routing and will not be mixed with RF cables. / VI(b) in TS –Form -4 (Compliance Statement) Antenna Reflector sub assembly
First row
Antenna reflector assembly consists of radial panels, radial trusses, central hub, bracing members, Z-Sections, cleat angles, web connecting cleats, sub reflector, sub reflector mounting bracket, quadruped assembly, junction box and lightning arrestor & aviation lamp assemblies etc. / VI(b) in TS –Form -4 (Compliance Statement) Antenna Reflector sub assembly
First row
Antenna reflector assembly consists of radial panels, radial trusses, central hub, bracing members, Z-Sections, cleat angles, web connecting cleats, sub reflector, sub reflector mounting bracket, quadruped assembly, junction box and lightning arrestor & aviation lamp assemblies etc. The power & earthingcables for aviation lamps and lightning arrestor will have separate routing and will not be mixed with RF cables.
03 / VI(C).Feed system sub assembly at page no:18 Point No.d & sub point No.7.
All Wave guide components should be highly polished and silver –plated from inside. After silver plating gold flash should be given. / VI(C).Feed system sub assembly at page no:-18 Point No.d & sub point No.7.
All X-band Wave guide components should be highly polished and silver –plated from inside. After silver plating gold flash should be given.
All S-band wave guides should be conductive chromatised only. / VI(C).Feed system sub assembly in TS-Form-5 (Compliance Statement) - Point no g.
All Wave guide components should be highly polished and silver –plated from inside. After silver plating gold flash should be given. / VI(C).Feed system sub assembly in TS-Form-5 (Compliance Statement) - Point no g.
All X-band Wave guide components should be highly polished and silver –plated from inside. After silver plating gold flash should be given.
All S-band wave guides should be conductive chromatised only.
04 / VII (a). FACTORY TESTS at page no:-20
Assembly tests shall be carried out by the Vendor in his shop to ensure proper fitting of parts, specified tolerances, surface R.M.S. checks, panel fixture checks etc. The system shall be operated to demonstrate general operating characteristics of the pedestal and detailed tests on a proper concrete foundation and properly secured on anchor bolts. The tests to be conducted are as follows:
- Rated speed and counter balancing
- Travel limits and shock absorber testing.
- Manual operations of stow locks.
- Lubrication of the bearings, gear boxes, drive units, hand drive, stow pin etc.
- Backlash of Azimuth, Elevation & Train axes.
- Slewing ring bearing wobbling
- Orthogonality between AZ & EL housings.
- Feed alignment with respect to sub reflector as per drawing dimensions
- Surface accuracy check of main and sub reflectors.
- Satellite tracking and demonstration.
- Pointing accuracy and tracking accuracy
- Natural frequency testing of total antenna system
Assembly tests shall be carried out by the Vendor in his shop to ensure proper fitting of parts, specified tolerances, surface R.M.S. checks, panel fixture checks etc. The system shall be operated to demonstrate general operating characteristics of the pedestal and detailed tests on a proper concrete foundation and properly secured on anchor bolts.
The tests to be conducted are as follows:
- Rated speed and Acceleration
- Counter weight balancing.
- Travel limits and shock absorber testing.
- Manual operations of stow locks and AZ/EL/Train axes hand cranking.
- Lubrication of the bearings, gear boxes, hand drive, stow pin etc.
- Backlash of Azimuth, Elevation & Train axes.
- Slewing ring bearing wobbling
- Orthogonality between AZ & EL housings (axes).
- Feed alignment with respect to sub reflector as per drawing dimension
- Surface accuracy check of main and sub reflectors.
- Natural frequency (LRF) testing of total antenna system
Assembly tests shall be carried out by the Vendor in his shop to ensure proper fitting of parts, specified tolerances, surface R.M.S. checks, panel fixture checks etc. The system shall be operated to demonstrate general operating characteristics of the pedestal and detailed tests on a proper concrete foundation and properly secured on anchor bolts. The tests to be conducted are as follows:
•Rated speed and counter balancing
•Travel limits and shock absorber testing.
•Manual operations of stow locks.
• Lubrication of the bearings, gear boxes, drive units, hand drive, stow pin etc.
• Backlash of Azimuth, Elevation & Train axes.
• Slewing ring bearing wobbling • Orthogonality between AZ & EL housings.
• Feed alignment with respect to sub reflector as per drawing dimensions
• Surface accuracy check of main and sub reflectors. •Satellite tracking and demonstration.
•Pointing accuracy and tracking accuracy
•Natural frequency testing of total antenna system / VII(a) in TS –Form -5 (Compliance Statement) FACTORY TESTS
Assembly tests shall be carried out by the Vendor in his shop to ensure proper fitting of parts, specified tolerances, surface R.M.S. checks, panel fixture checks etc. The system shall be operated to demonstrate general operating characteristics of the pedestal and detailed tests on a proper concrete foundation and properly secured on anchor bolts.
The tests to be conducted are as follows:
- Rated speed and Acceleration
- Counter weight balancing.
- Travel limits and shock absorber testing.
- Manual operations of stow locks and AZ/EL/Train axes hand cranking.
- Lubrication of the bearings, gear boxes, hand drive, stow pin etc.
- Backlash of Azimuth, Elevation & Train axes.
- Slewing ring bearing wobbling
- Orthogonality between AZ & EL housings (axes).
- Feed alignment with respect to sub reflector as per drawing dimension
- Surface accuracy check of main and sub reflectors.
- Natural frequency (LRF) testing of total antenna system
05 / VIII(b).Preliminary Design Review at page no:-21.
•Angle of movement - Horizontal
•Angle of movement – Vertical / VIII(b).Preliminary Design Review at page no:-21.
These points are deleted / In Item Specs –VI Program Clauses (Compliance Statement)- In Point No (b) Preliminary Design Review
Second row
•Angle of movement - Horizontal •Angle of movement - Vertical / In Item Specs -6 Program Clauses (Compliance Statement)- In Point No (b) Preliminary Design Review
These points are deleted
06 /
IX. TECHNICAL TERMS & CONDITIONS in page 23. Point No 5
Vendor has to supply all the required documentation at least two weeks before all the scheduled reviews/events like PDR, FAT, OSAT, Installation etc. /IX. TECHNICAL TERMS & CONDITIONS in page 23. Point No 5
Vendor has to supply all the required documentation at least two weeks before all the scheduled reviews/events like PDR, FAT, Installation, OSAT etc.The tests to be conducted during OSAT are as follows:
- Rated speed and acceleration
- Counter weight balancing
- Travel limits and shock absorber testing.
- Manual operations of stow locks and AZ/EL/Train axes handcranking.
- Lubrication of the bearings, gear boxes, drive units, hand drive, stow pin etc.
- Backlash of Azimuth, Elevation & Train axes.
- Feed alignment with respect to sub reflector as per drawing dimensions
- Surface accuracy check of main reflector.
- Satellite tracking and demonstration.
- Pointing accuracy and tracking accuracy checks.
Vendor has to supply all the required documentation at least two weeks before all the scheduled reviews/events like PDR, FAT, OSAT, Installation etc. / In Item Specs -VIITechnical Terms & conditions (Compliance Statement)- In Point No 5
Vendor has to supply all the required documentation at least two weeks before all the scheduled reviews/events like PDR, FAT, OSAT, Installation etc.
The tests to be conducted during OSAT are as follows:
- Rated speed and counter balancing
- Travel limits and shock absorber testing.
- Manual operations of stow locks.
- Lubrication of the bearings, gear boxes, drive units, hand drive, stow pin etc.
- Backlash of Azimuth, Elevation & Train axes.
- Slewing ring bearing wobbling
- Orthogonality between AZ & EL housings.
- Feed alignment with respect to sub reflector as per drawing dimensions
- Surface accuracy check of main and sub reflectors.
- Satellite tracking and demonstration.
- Pointing accuracy and tracking accuracy
Sd/-
Sr Purchase & Stores Officer