ANNEXURE ‘E’
DELHI DEVELOPMENT AUTHORITY
BUILDING SECTION VIKAS SADAN
(PERFORMA FOR PROVISIONAL OCCUPANCY)
CERTIFICATE AND COMPLETION CUM OCCUPANCY
(To be submitted in duplicate)
File No.______Name of the Lessee/Owner______
Plot No.______pkt. No.______Block No.______Sector No.______
Area of the Plot______Scheme______
Date of sanction______.
The following documents have been received at Counter Vide Dy. No.______Date______.
DOCUMENTS FOR PROVISIONAL OCCUPANCY CERTIFICATE
S.No. Description Page No.
1. The Certificate by the owner, Architect/Engineer Yes/No. ______
Structural Engineer and Supervisor in the form Appendix
B-3(Bye Law No. 7.5.2).
2. One set of structural drawings as executed duly signed Yes/No. ______
by owner, Architect and Structural Engineer.
3. Copy of Lease Deed. Yes/No. ______
4. Valid extension of time upto the date of applying for Yes/No. ______
Completion Certificate, and in case completion is
applied in phases,valid extension of time would be
required upto the last phase.
5. Revalidation of plan upto the date of application of Yes/No. ______
completion certificate.
6. Valid Certificate of Architect/Engineer Yes/No. ______
7. Qualification Certificate of Structural Engineer Yes/No. ______
8. Clearance from Chief Fire Officer, Delhi (in duplicate), Yes/No. ______
Wherever applicable.
9. Clearance/NOC from DVB regarding handing over/taken Yes/No. ______
over of electric sub-station(s), wherever applicable.
10. Certificate from the Lift inspector,GNCTD, wherever Yes/No. ______
applicable.
11. Undertaking regarding day/night marking as per ICAO Yes/No. ______
standards, wherever applicable.
12. Sewer connection permission from DDA in case ‘D’
Form is already issued.
13. Qualification Certificate of Structural Engineer. Yes/No. ______
14. 2 sets of Superimposed layout and building plans.(No. of Yes/No. ______
drawings______).
15. Confirmation of draw of flats where ‘D’ form is already Yes/No. ______
issued for group housing schemes of Cooperative Societies
16. Approval of Sewerage/Water Supply and Storm Water Yes/No. ______
Drain Scheme from DJB/MCD/DDA, wherever applicable.
17. Numbering plan for group housing schemes. Yes/No. ______
18. EWS Fund of Rs. ______vide cheque/DD Yes/No. ______
No.______dated______wherever applicable.
19. Three sets of Completion Plans (Layout Plan, Building Plans, Yes/No. ______
Elevations & Sections) alongwith actual area at site i.e. ground
Coverage FAR, Green Parking with other details. Subsequently,
based on site inspection calculations Society/Architect will submit
3 sets of above said plans. (No. of drawings______).
DOCUMENTS FOR COMPLETION CUM OCCUPANCY CERTIFICATE
20. The certificate by the owner, Architect/Engineer, Yes/No.______
Structural Engineer and Supervisor in the form Appendix.
21. DUAC Proforma (in duplicate) for completion certificate. Yes/No.______
22. Two sets of building photographs (coloured)(in size of Yes/No.______
8’x10”)
23. Two sets of model photograph (coloured)(in size of 8’ Yes/No.______
X10”)
24. External Finish Certificate (in duplicate) from Architect. Yes/No.______
25. Certificate regarding deviations from the Architect (in Yes/No______
duplicate).
26. One set of attested copies of sanctioned plan. Yes/No.______
27. Two sets of Completion Plans for forwarding to DUAC Yes/No.______
(No. of drawings______)
28. Any other document/information. Yes/No._____
Total No. ______
All the documents have been checked and found in order.
The application is returned on account of non-submission of documents mentioned at S. No.______.
Received Rs. ______vide Receipt No.______Date______.
JE (Counter(Building)
(Stamp with date)
Cashier (Bldg. Sec.)
Received by Owner/Lessee/Architect/Representative
Name
Address Signature
Note:
1. All photocopies are required to be attested by the Architect / Engineer.
2. All Affidavits/Undertakings are required to be attested by Oath Commissioner/Notary Public/First Class Magistrate.
3. One set of Building Plans/Schemes is acceptable initially and remaining sets can be submitted later on.