ICP DOCUMENT CHECKLIST
Document No. / Document Title / Mandatory DocumentICP is required to comply fully with this document. The ICP will use the UKPN published version and not their own created version. / Advisory Document
ICP must ensure its own rules and procedures are at least to an equivalent standard to that set out in this document. The ICP will create and use their own version which will be to no lesser standard than this version. / ICP Operatives on site expected to have a copy in their possession at all times whilst on site /
DOCUMENTS FOR ALL UK POWER NETWORKS ACTIVITY
DISTRIBUTION SAFETY RULES / a(ICP Staff authorised under Option 2 of CoP) / a(ICP Staff authorised under Option 1 of CoP)
UKPN MATERIALS SPECIFICATIONS / a
ENA ENGINEERING RECOMMENDATIONS G81 / a
UKPN ENGINEERING RECOMMENDATIONS G81 APPENDICES / a
UKPN JOINTING MANUAL / a / a
EOS 09-0100 / SITE RECORDING OF CABLES, PLANT AND EQUIPMENT / a
HSS 40 052 / ENERGISATION AND DISCONNECTION OF ELECTRICAL APPARATUS & PLANT INCLUDING ALL CABLES / a
ECS 02-0019 / INSTALLATION OF UNDERGROUND CABLES / a
DSR 01 016 / PROCESS TO ENSURE LV CUSTOMERS HAVE CORRECT POLARITY AND PHASE ROTATION / a
DSR 01 018 / IDENTIFICATION OF LV CABLES / a
DSR 01 018A / LOW VOLTAGE CABLE IDENTIFICATION CHECKSHEET / a / a
DSR 01 014 / EXCAVATING NEAR ELECTRICITY CABLES / a
HSS 40 045 / BASIC REQUIREMENTS FOR LIVE WORKING ON LV APPARATUS / a
HSS 40 045A / LV LIVE WORK OR TESTING ASSESSMENT / a / a
NOP 50 021 / OPERATIONAL CONTROL OF UKPN LOW VOLTAGE SYSTEM / a
NOP 50 021A / LV SWITCHING OPERATIONS SCHEDULE / a
NOC 04 005 / ICP APPROVED SIGNAL INJECTION SERVICE ENQUIRY PROCEDURE / a
NOC 04 006 / ICP LINKING AND FUSING SERVICE ENQUIRY PROCEDURE / a
NOC 04 006A / ICP LINKING AND FUSING SERVICE APPLICATION FORM / a
ADDITIONAL DOCUMENTS FOR STREET FURNITURE UNMETERED LV JOINTING ACTIVITY
EDS 08-0133 / SERVICES TO UNMETERED STREET FURNITURE / a
NOC 04 003 / ICP UNMETERED JOINTING TO SERVICES [UJ2S] PROCEDURE / a
NOC 04 002 / PILOT FOR ICP UNMETERED JOINTING TO SERVICES [UJ2S] PROCEDURE [EPN & SPN] / a
NOC 04 004 / ICP UNMETERED JOINTING TO MAINS [UJ2M] PROCEDURE / a
ADDITIONAL DOCUMENTS FOR STREET FURNITURE METERED LV JOINTING ACTIVITY
NOC 04 001 / ICP STREET FURNITURE METERED JOINTING TO MAINS (SFMJ2M) PROCEDURE / a
Document No. / Document Title / Mandatory Document
ICP is required to comply fully with this document. The ICP will use the UKPN published version and not their own created version. / Advisory Document
ICP must ensure its own rules and procedures are at least to an equivalent standard to that set out in this document. The ICP will create and use their own version which will be to no lesser standard than this version. / ICP Operatives on site expected to have a copy in their possession at all times whilst on site /
ADDITIONAL DOCUMENTS FOR METERED LV & HV JOINTING ACTIVITY
CON 08 115 / ICP SELF-CONNECTION & OPERATIONAL ACTIVITY PROCEDURE / a
CON 08 115A
CON 08115B / SORN REQUEST FORM – LV JOINTING & OPERATIONAL ACTIVITY / a
CON 08 115B / SORN REQUEST FORM – HV JOINTING MECHANISM 1 / a
CON 08 115C / SORN REQUEST FORM – HV JOINTING & OPERATIONAL MECHANISM 2 / a
EDS 08-0129 / UNDERGROUND SERVICES UP TO 100A / a
EDS 08-0136 / EARTH FAULT LOOP IMPEDANCE REQUIREMENTS / a
COP 01 006 / SYSTEM ALTERATION NOTICE PROCEDURE / a
COP 01 006A / SYSTEM ALTERATION NOTICE FORM EPN / a
COP 01 006B / SYSTEM ALTERATION NOTICE FORM LPN / a
ADDITIONAL DOCUMENTS FOR LV & HV OPERATIONAL ACTIVITY
HSS NB 171 / CLARITY ON ROLES & RESPONSIBILITIES FOR WORK BY ICPs ON UKPN HV & LV NETWORKS / a
EOS 09-0001 / HIGH VOLTAGE INSULATION TESTING POLICY / a
EOP 03-0071 / USE OF TEST PLUGS FOR USE WITH SECONDARY SWITCHGEAR / a
HSS 40 042 / HV SWITCHING - REMOTE OPERATING DEVICES / a
HSS 40 043 / HIGH VOLTAGE SYSTEM PHASING CHECKS / a
HSS 40 046 / SUBSTATION ACCESS AND ENTRY / a
HSS 01 139 / MAINTENANCE OF SPIKING GUNS & CARTRIDGE STORAGE / a
DSR 01 007 / IDENTIFICATION OF HV CABLES / a
DSR 01 009 / OPERATION OF SF6 SWITHGEAR / a
DSR 01 010 / WORK IN LIVE SUB-STATIONS – SAFE ZONES OF WORK / a
DSR 01 013 / SAFETY DOCUMENTS / a
ADDITIONAL DOCUMENTS FOR UNMETERED LV OVERHEAD LINE CONNECTION ACTITIVTY PILOT
UKPN OVERHEAD LINE CRAFT MANUAL – SECTION 01, 02, 03, 06, 10 / a / a
UKPN OVERHEAD LINE CONSTRUCTION MANUAL – SECTIONS 01, 05 / a / a
HSS 01 067 / WORKING AT HEIGHT / a
HSS 01 068 / WORKING AND CLIMBING ON WOOD POLES / a
EDS 08-0133 / SERVICES TO UNMETERED STREET FURNITURE / a
EDS 08-0061 / PILOT FOR UNMETERED LIVE CONNECTIONS TO OVERHEAD LINES / a
NOC 04 007 / PILOT FOR ICP UNMETERED CONNECTIONS TO OVERHEAD LINES [UC2OHL] PROCEDURE / a
NOC 04 007a / SORN REQUEST FORM FOR PILOT FOR ICP UNMETERED CONNECTIONS TO OVERHEAD LINES [UC2OHL] / a
ADDITIONAL DOCUMENTS FOR ICP METERED DISCONNECTIONS PILOT
NOC 04 008 / ICP METERED DISCONNECTIONS PILOT PROCEDURE / a
NOC 06 001 / DISCONNECTIONS PROCEDURE / a