JOB SAFETY ANALYSIS

COMPANY/ PROJECT NAME or ID/ LOCATION ( City, State) / DATE
August 20, 2015 / NEW
REVISED / PAGE 1 of 2
WORK ACTIVITY (Description):
WACKER ROLLER
DEVELOPMENT TEAM / POSITION / TITLE / REVIEWED BY: / POSITION / TITLE
Dave Ruzich / Safety Coordinator
MINIMUM REQUIRED PERSONAL PROTECTIVE EQUIPMENT ( SEE CRITICAL ACTIONS FOR TASK-SPECIFIC REQUIREMENTS)
REFLECTIVE VEST
HARD HAT
LIFELINE / HARNESS
SAFETY GLASSES / GOGGLES
FACE SHIELD
HEARING PROTECTION
SAFETY SHOES / AIR PURIFYING RESPIRATOR
SUPPLIED RESPIRATOR
PPE CLOTHING / GLOVES Cut-resistant
OTHER
¹JOB STEPS / ²POTENTIAL HAZARDS / ³CRITICAL ACTIONS TO MITIGATE HAZARDS
1)  Preparation / ·  Personnel on site
·  Slope of land
·  Ground Structure
·  Eg Hard, Soft, Boggy etc
·  Proximity of structures services. / ·  Operator has required Brieser Equipment Training & documentation..
·  Inspect machine w/ Brieser Daily Equipment Checklist.
·  Ensure service log is up to date.
·  Isolate work area from unessential personnel and traffic
·  Inspect land slope for safe operation of machine as per Operator’s Manual.
·  Erect barricades or other isolating device for structures and services (as required)
·  Identify all services above and below ground
2)  Operation / ·  Operation of machinery
·  Plant Movement
·  Personnel in immediate area and other plant and equipment / ·  Secure loose clothing and long hair
·  Refer Manufacturer’s Instructions for correct operation of machinery
·  Ensure adequate ventilation
·  Ensure all personnel are well clear of the machines
·  Ensure all safety requirements are fitted as per the operator’s manual
·  Ensure the machinery does not exceed the operating perimeters as per operator’s manual
3)  After Use Care / ·  Restore equipment to a safe condition
·  Tidy area / ·  Ensure machine is restored to a safe condition.
·  Tidy area and return any aids (eg barricades)
·  Report any faults or rectify

¹