JOB SAFETY ANALYSIS
COMPANY/ PROJECT NAME or ID/ LOCATION ( City, State) / DATEAugust 20, 2015 / NEW
REVISED / PAGE 1 of 2
WORK ACTIVITY (Description):
WACKER ROLLER
DEVELOPMENT TEAM / POSITION / TITLE / REVIEWED BY: / POSITION / TITLE
Dave Ruzich / Safety Coordinator
MINIMUM REQUIRED PERSONAL PROTECTIVE EQUIPMENT ( SEE CRITICAL ACTIONS FOR TASK-SPECIFIC REQUIREMENTS)
REFLECTIVE VEST
HARD HAT
LIFELINE / HARNESS
SAFETY GLASSES / GOGGLES
FACE SHIELD
HEARING PROTECTION
SAFETY SHOES / AIR PURIFYING RESPIRATOR
SUPPLIED RESPIRATOR
PPE CLOTHING / GLOVES Cut-resistant
OTHER
¹JOB STEPS / ²POTENTIAL HAZARDS / ³CRITICAL ACTIONS TO MITIGATE HAZARDS
1) Preparation / · Personnel on site
· Slope of land
· Ground Structure
· Eg Hard, Soft, Boggy etc
· Proximity of structures services. / · Operator has required Brieser Equipment Training & documentation..
· Inspect machine w/ Brieser Daily Equipment Checklist.
· Ensure service log is up to date.
· Isolate work area from unessential personnel and traffic
· Inspect land slope for safe operation of machine as per Operator’s Manual.
· Erect barricades or other isolating device for structures and services (as required)
· Identify all services above and below ground
2) Operation / · Operation of machinery
· Plant Movement
· Personnel in immediate area and other plant and equipment / · Secure loose clothing and long hair
· Refer Manufacturer’s Instructions for correct operation of machinery
· Ensure adequate ventilation
· Ensure all personnel are well clear of the machines
· Ensure all safety requirements are fitted as per the operator’s manual
· Ensure the machinery does not exceed the operating perimeters as per operator’s manual
3) After Use Care / · Restore equipment to a safe condition
· Tidy area / · Ensure machine is restored to a safe condition.
· Tidy area and return any aids (eg barricades)
· Report any faults or rectify
¹