RESUME

Name : Ravi Teja.A

Phone : +91-9533747775

E-mail id:.

Objective:

Intend to build a career with leading environment with committed & dedicated people, which will help me to explore myself fully and realize my potential. Willing to work as a key player in challenging & creative environment.

Domain Skills:

Good understanding of the workings in a Process Industry& Power plants.

Good at handling Process supporting equipment in the plant.

Good theoretical knowledge and having good skills in applying in practical problems and troubleshooting.

Scholastic Profile:

AMIE (B.E) in Electrical Engineering from The Institution of Engineers (INDIA) with 71.2% in June-2014.

Diploma in Electrical and Electronics Engineering from S.M.V.M.Polytechnic, Tanuku with 91 % in April 2011.

SSC certificate from ZPH School Satyawada with 84% in April2007.

11kV License issued by AP Electrical Licensing Board.

Employment History:

Possess Experience of 5 years and 09 months in field ofUtilities (Power House) Electrical Operation and maintenance in ITC Ltd-Bhadrachalam paper mill.

 Having Experience of 3 Months in field of Electrical Maintenance in GSKCH- Rajahmundry.

Last Organization:Glaxo Smith Kline Consumer Healthcare Ltd.

Product:Horlicks

Department:Engineering Electrical.

Designation:Executive

Period:25/02/2017 TO 26/05/2017

Past Organization:ITC - PSPD.

Product:Specialty Papers, Paper Boards, Papers

Department:Utilities Electrical.

Designation:Dept. Officer

Period:16/05/2011 TO 20/02/2017

Work Experience:

O & M of 110 MW Thermal power plant.

O & M of Transformers of different voltage levels (132/11kV,11/6.6kV,11/.415kV)

O & M of DG sets up to 3 MW(Kirloskar and Skoda sets).

O & M of ABB and Allen Bradley (Power flex) Variable frequency drives (VFD).

O & M of 132 kV/11 kV Substation with auxiliaries.

O & M of 11 kV and 6.6 kV Switch gear with auxiliaries.

O & M of LT and HT Switchgears like VCBs, ACBs and SF6 Circuit breakers up to 132kV.

O & M of PLC based Coal and Ash handling systems.

O & M of Battery chargers and UPS systems.

Having knowledge on DCS operation and computer skills.

Having knowledge on ABB Power Management System.

Job Responsibilities:

ITC PSPD Ltd:

Trouble shooting of electrical related problems coming from SIX Turbo generators of 110 MW installedcapacity, sevencoal fired boilers and it’sauxiliaries, Coalhandling plants(50,90,120&150 TPH),DM plant,132/11kv Grid Yardand ETP.

Synchronizing of different sources like Generator toGenerator, Generatorwith Grid supply.

Controlling of total mill electrical system from the Power Management System(PMS).

Protection Relay coordination study for new changes in the electrical system.

Planning and implementing loadsheddingbased on load requirements to prevent unwanted loaddisturbances.

Issuing of High tension Electrical work permits in the entire plant.

Preventive Maintenance of All Electrical equipment’s like Induction motors, Switch Gears, PCC's, MCC's, Transformers, ESP,s VFD's and Generators.

Up keepingtheDown time of the plant andcarryingout WHY-WHY’s and Fishbones to prevent repetition of breakdowns.

Trouble shooting the Electrical complaints in ESP's.

Up keepingall the records as per different audit requirements(ISO,OSHAS,EHS andBSC)

Responsible to drive TPM activities effectively in my area.

GSKCH Ltd:

Preventive Maintenance of Transformers, PCC’s, MCC’s and Motors.

Troubleshooting in Electrical equipment.

Commissioning of PCC having Auto DG and TG synchronization facility.

Up keepingall the records as per different audit requirements(CAG,CEHS, etc.,)

Training Programs:

Attended for Environment, Health and Safety training Program.(Industrial Safety)

Attended training on Electrical first aid and safety.

Attended training on SIEMENS MOTORS.

Attended training on Power System Operation.

Attended training on Excitation Systems.

Major Duties Performed:

Commissioned ABB PMS System.

Leading member of Power System Study project at ITC Ltd PSPD.

Technical Skills:

Having good Experience in Protection Relay Coordination.

Having good Experience in Electrical Operation & Maintenance of Co-gen Power plant.

Having good Troubleshooting skills

Having good Experience in finding root cause for electrical breakdowns.

Having good Experience in reviewing of Power System Study reports.

IT Skills:

Software exposure :MS OFFICE (Word, Excel, Power point) and AUTO CAD.

Personal Profile:

Name :Ravi Teja.A

Father’s name:Rama Krishna

Sex:Male

Date of Birth:24-05-1992

Marital status:Unmarried

Nationality:Indian

Languages Known:English, Telugu

Hobbies:Reading books

Permanent Address:Ravi Teja.A

S/o Rama Krishna.

D.No: 3-107,

Chilakapadu, Undrajavaram Mdl

Pin: 534216, W.G dist.,A.P.

Personal Traits::-

  • Dynamic Team Player
  • Sense of Responsibility
  • Highly Inquisitive
  • Creative and Resourceful
  • Dependable
  • Energetic

Declaration:

Ibelieve that I have the competitive drive in me. Together with my analytical ability and technical knowledge I believe that I can deliver my best for the development of your organization. Iassure that the Information provided in this resume is correct to my best knowledge.

Yours Faithfully,

Ravi Teja.A