PART3REGIONALANDDISTRICTRULES»ChapterH:Aucklandwiderules»4Naturalresources»
4.14StormwatermanagementIntroduction
Thissectionprovidesthreesetsofrulesformanagingstormwaterthatarisesfromthedevelopmentorredevelopmentofimperviousareasandassociatedactivities.Oneormorerulesmayapply,dependingonthenatureoftheactivityanditslocation.
Stormwaterdiversionanddischargerules
Theserulescontrolthediversionanddischargeofstormwaterfromimperviousareas,pursuanttos.14and15oftheRMA.Therearefourcategoriesofstormwaterdischarge:
a.frompublicstormwaternetworksbyastormwaternetworkdischargeconsent(thesemayincludepublicroads)
b.frompublicroadsoperatedbyroadcontrollingauthorities(wherenotcoveredbyastormwaternetworkdischargeconsent)
c.directedtogroundsoakageortomaintainmoisturelevelsinpeatsoils;
d.fromimperviousareasotherthanthoseconnectedtopublicstormwaternetworks,publicroads,ordischargestogroundsoakage.
Toavoiddoubt,stormwaterfromaprivatesitedirectedtoareticulatedpublicstormwaternetworkisconsideredpartofthestormwaternetworkdischargeprovideditmeetstherequirementsofanyrelevantstormwaternetworkdischargeconsent.Onlyprivatedischargesthatdonotenterapublicstormwaternetworkrequireauthorisationunderclausec.ord.above.
ThediversionanddischargeofstormwaterfromimperviousareasexistingatthedateofnotificationoftheUnitaryPlanarepermittedprovidedthattheyandtheirassociatedeffectsdonotincreaseabovethosethatexistedonthatdate;
Stormwaterdiversionanddischargefromnew/additionalimperviousareasaremanagedbybothdischargeandlanduserules.
Stormwatermanagement–flowrules
Thesearelanduserulesformanagingstormwaterrunofffromimperviousareas,pursuanttos.9(2)ands.30oftheRMA,applyingto:
a.StormwaterManagementArea–Flow1and2overlayareas
b.landusezonesinaccordancewithzoneimperviousareathresholds
c.areasdischargingtothecombinedsewernetwork
d.sitesnotconnectedtothepublicstormwaternetwork.
Stormwatermanagement–qualityrules
Thesearelanduserulesformanagingstormwaterrunoffqualityfromimperviousareaspursuanttos.9(2)ands.30oftheRMA.Theyapplytothefollowinghighcontaminantgeneratingactivities:
a.uncoveredparkingorparkingareas
b.highcontaminantyieldingroofing,spouting,claddingandarchitecturalfeatures
c.highuseroads.
DischargesofstormwaterfromanindustrialortradeactivityareaareaddressedinaseparatesectionoftheUnitaryPlan.The‘industrialortradeactivityarea’isalsodefinedintheplan.
Landusecontrolsareusedtoensurethesamestormwatermanagementrequirementsapply,asappropriate,toactivitieswithaprivatestormwaterdischargeandthosedischargingtoapublicstormwaternetwork.Whereasitealsohasastormwaterdischargetolandorwater,otherthanviaapublicstormwaternetwork,astormwaterdischargeconsentmayalsoberequired.
RulesapplyingspecificallytostormwaterrunofffrompublicroadsoperatedbyroadcontrollingauthoritiesincludebothdischargerulesandlandusecontrolsforhighuseroadsandwithinStormwaterManagementAreas–Flow1and2anddischargestothecombinedsewernetwork.
ThereportAucklandUnitaryPlanStormwaterManagementProvisions:TechnicalBasisofContaminantandVolumeManagementRequirements(AucklandCouncil2013)providesguidanceformeetingthestormwatermanagementrequirementswithinStormwaterManagementArea–Flow1and2andrequirementsapplyingtoHighContaminantGeneratingActivities.
1.Stormwaterdischarges
1.1Activitytable
[rcp/rp]
Diversionanddischargeofstormwatertoland,waterortheCMAincludingthediversionofsurfacewaterfromimperviousareas
Activity / ActivityStatus
Existingimperviousareas
ImperviousareasexistingatthedateofnotificationoftheUnitaryPlan / P
ImperviousareasexistingatatthedateofnotificationoftheUnitaryPlanthatdonotmeetthe
permittedactivitycontrols / RD
Stormwater Networks
Stormwaterfromastormwaternetworkoperatedbyastormwaternetworkutilityoperator / C
Stormwaterfromastormwaternetworkoperatedbyastormwaternetworkutilityoperatorthat
doesnotmeetthecontrolledactivitycontrols / RD
Publicroadsoperatedbyaroadcontrollingauthority
Newimperviousareaslessthanorequalto5,000m2,includingancillaryimperviousareas,that
arepartofapublicroad / P
Newimperviousareas,includingancillaryimperviousareas,thatarepartofapublicroadthat
donotmeetthepermittedactivitycontrols / RD
Groundsoakageandpeatsoils
Newimperviousareasdischargingtogroundsoakageandpeatsoilareas / P
Newimperviousareasdischargingtogroundsoakageandpeatsoilareasthatdonotmeetthe
permittedactivitycontrols / RD
Imperviousareasnototherwiseprovidedforbystormwaternetwork,publicroad,groundsoakage
andpeatsoilrules
Newimperviousareasinaruralarea,includingruralzones,openspacezonesandspecialpurposezonesoutsidetheRUBwheretheimperviousareaislessthanorequalto5,000m2
andwhichdoesnotincreasethetotalimperviousareaofthesitetomorethan5,000m2 / P
Newimperviousareasinanurbanarea,includingopenspacezonesandspecialpurposezoneswithintheRUBwheretheimperviousareaislessthanorequalto1,000m2andwhich
doesnotincreasethetotalimperviousareaofthesitetomorethan1,000m2 / P
Newimperviousareasinanurbanarea,includingopenspacezonesandspecialpurposezoneswithintheRUBwherethetotalsiteimperviousareaisincreasedtogreaterthan
1,000m2butlessthanorequalto5,000m2 / RD
Newimperviousareaswherethedevelopmenthasbeensubjecttostructureorframework
planningthatincludesintegratedlanduseandstormwaterplanning / C
Allotherdiversionanddischargeofstormwaterfromimperviousareas
Thediversionanddischargeofstormwaterfromimperviousareasnototherwiseauthorisedby
stormwaterdischargeanddiversionrules / D
1.2Controls
1.2.1Permittedactivities
1.General
a.thedischargemustnotcauseorincreasescouringorerosionatthepointofdischargeordownstream.
b.thedischargemustnotresultin,orincrease,floodingofotherpropertiesineventsuptothe10percentAEPortheinundationofbuildingsineventsuptothe1percentAEP.
c.thedischargemustnotcausenuisanceordamagetootherproperty.
2.Existingimperviousareas
a.theimperviousareawasexistingonthedateofnotificationoftheUnitaryPlan.
b.stormwaterflowsandvolumesfromexistingimperviousareasmustnotbeincreasedabovethoseatthedateofnotificationoftheUnitaryPlan,includingasaresultofachangeinlanduseorremovalofexistingstormwatermanagementmeasures.
c.theconcentrationandloadofcontaminantsinstormwaterflowsfromexistingimperviousareasmustnotbeincreasedabovethoseatthedateofnotificationoftheUnitaryPlan,includingasaresultofachangeinlanduseortheremovalofexistingstormwatertreatmentmeasures.
d.anyroadancillaryareamustnotbenotusedfor:
i.
ii.iii.
storageofroadingandbuildingmaterialsformorethan14dayscontinuouslystorageofhazardousmaterial
works/buildingyards
e.thediversionanddischargemustnotbeotherwiseauthorisedbyanetworkdischargeconsent.
f.anyredevelopmentofexistingimperviousareasmustmeettheStormwaterManagement–FlowandQualityrequirementsoftheUnitaryPlan
g.themethodoftreatment,diversionandlocationofthedischargemustnotchange.
3.Publicroadsoperatedbyaroadcontrollingauthority
a.thenewimperviousarea,includingfootpaths,cyclewaysandancillliaryareas,mustbelessthanorequalto5,000m2.
b.ataminimum,stormwatertreatmentmustbeappliedtocatchpitsforconcentratedflows,orbydirectingsheetflowsacrossvegetatedareaswhereflowsarenotconcentrated
c.thedrainagenetwork,includingroadsidedrainages,swalesandcatchpitsmustbemanagedandmaintainedtoensureeffectiveoperationandpreventerosion,sedimentgenerationanddischarge
d.wherestormwaterisdischargedtoland,itmustbedispersedtopreventscouranderosion.
e.anyroadancillaryareamustnotbeusedfor:
i.
ii.iii.
storageofroadingandbuildingmaterialsformorethan14dayscontinuouslystorageofmaterialthatmaybehazardoustotheenvironment
works/buildingyards.
4.Groundsoakageandpeatsoils
a.thetotalimperviousareaonthesite,includinganynewareas,mustnotexceedthelesserof:
i.
ii.
theimperviousareathresholdfortherelevantzone;or1,000m2
b.anydevelopmentrequirementsforgroundsoakage,includingdevicestotreatdischargesorsoakagedesign,mustbecompliedwith
c.anyflowsinexcessofsoakagecapacityorfromsoakagefailuremustbedirectedtoastormwaternetworkordischargedwithoutcausingscour,erosionorincreasingriskoffloodingtopeopleandpropertyupordownstream
d.anynewimperviousareamustmeettherelevantrequirementsoftheStormwaterManagement–FlowandQualityrequirementsoftheUnitaryPlan,includinginaccordancewitharesourceconsentgrantedunderthoserules.
5.Newimperviousareaslessthanorequalto5,000m2inaruralareas,includingruralzones,openspacezonesandspecialpurposezonesoutsidetheRUB
a.thetotalimperviousareaonthesite,excludingunsealedorgraveledtracks,mustbelessthanorequalto5000m2.
b.theremustbenoconnectiontothestormwaternetworkavailable.
c.thedischargemustbefromanimperviousareawithinaruralarea,includingruralzones,openspacezonesandspecialpurposezonesoutsidetheRUB.
d.stormwatermustbedischargedtolandinamannerthatdispersestheflowandpreventsscourandpointdischargesforming.
6.Newimperviousareaslessthanorequalto1,000m2inanurbanarea,includingopenspacezonesandspecialpurposezoneswithintheRUB(excludingpublicroads)
a.thetotalimperviousareaonthesite,includinganynewimperviousarea,mustbelessthanorequalto1000m2.
b.theremustbenoconnectiontothestormwaternetworkavailable.
c.thedischargemustbefromanimperviousareathatiswithinanurbanarea,includingopenspacezonesandspecialpurposezoneswithintheRUB.
d.thenewimperviousareamustmeettherelevantrequirementsofStormwaterManagement–FlowandQualityrulesoftheUnitaryPlan,includinginaccordancewitharesourceconsentunderthoserules.
1.2.2Controlledactivities
1.General
Thesecontrolsapplytoallcontrolledactivitiesotherthandischargesfrompublicstormwaternetworks
a.Thedischargemustnotcauseorincreasescouringorerosionatthepointofdischarge.
b.Thedischargemustnotresultin,orincrease,thefloodingofotherpropertiesineventsuptothe10per
centAEPortheinundationofbuildingsineventsuptothe1percentAEP.
c.Thedischargemustoccurwiththeminimumofnuisanceanddamageandinparticularavoidsmorethanminoradverseeffectsonanyotherproperty.
d.AnyneworredevelopmentofexistingimperviousareasmustmeettherelevantrequirementsofStormwaterManagement–FlowandQualityrulesoftheUnitaryPlan,includinginaccordancewitharesourceconsentunderthoserules.
e.Thediversionanddischargemustbemanaged,andwherepossibledispersed,tominimiseerosionandsedimentgeneration.
2.Stormwaternetworks
a.TheapplicationmustincludeanassessmentofadverseeffectsthataddressesthemattersidentifiedinTable1.
3.Newimperviousareaindevelopmentsthathavebeensubjecttoanintegratedstructureplanprocess
a.Thedevelopmenthasbeensubjecttoanintegratedlanduseandstormwatermanagementstructureplanningprocessthataddressestheintegratedmanagementstormwater,freshwaterandwaterqualityobjectivesandpoliciesofthisUnitaryPlan.
1.3AssessmentControlledactivities
1.3.1Mattersofcontrol
Thecouncilwillreserveitscontroltothemattersbelowfortheactivitieslistedascontrolledintheactivitytable.
1.General
a.Monitoringandreporting,includingonanetworkwidebasisforstormwaternetworks.
b.Operationsandmaintenancerequirements.
2.Stormwaternetworks
a.TheimplementationofmeasuresrequiredtoachievetheBPOforpreventingorminimisingtheadverseeffectsofstormwaterdischargesfrombothexistingand,whererelevant,futuredischarges.
b.AnyprogrammeoffurtherinvestigationsandworksrequiredtogiveeffecttotheBPO.
c.TheimplementationofanyprogrammesrequiredtogiveeffecttotheBPO.
3.Newimperviousareasindevelopmentsthathavebeensubjecttoanintegratedstructureorfarmeworkplanprocessthatincludesintegratedlanduseandstormwaterplanning
a.Thelocationofthedischargepoint(s)
b.Measurestoavoiderosion,scourandfloodrisk.
4.Theimplementationandmaintenanceofmeasurestomeetthestormwaterdiversionanddischargerequirementsoftheintegratedlanduseandstormwatermanagementassessment.
a.ConsistencywithanyrelevantnetworkdischargeconsentorpubliclyavailableandcurrentAucklandCouncilstormwatermanagementplans/analysis.
1.3.2Assessmentcriteria
Thecouncilwillconsiderthereleventassessmentcriteriabelowforthecontrolledactivitieslistedabove.
1.Stormwaternetworks
a.WhethertheconsentapplicationadequatelyaddressesthematterslistedinTable1.
b.TheextenttowhichtheproposedmanagementofstormwaterrepresentstheBPOforthereticulatedcatchment,takingaccountofmattersassessedaslistedinTable1.
2.Newimperviousareaswherethedevelopmenthasbeensubjecttostructureorframeworkplanningthatincludesintegratedlanduseandstormwaterplanning
a.WhetherstormwatermanagementisconsistentwithanyrelevantnetworkdischargeconsentorpubliclyavailableandcurrentAucklandCouncilstormwatermanagementplansand/analysis.
b.Theextenttowhichthestructureorframeworkplanandassociatedplanchangeorresourceconsenthasachievedintegratedandeffectivestormwatermanagementacrosstheproposeddevelopmentareaandinparticular:
i.
ii.iii.
adoptswatersensitivedesignandgreeninfrastructure;minimiseshydrologicalchange;
minimises contaminants.
c.Whetherthestructureorframeworkplanandassociatedplanchangeorresourceconsent providesclearrequirementsforstormwatermanagementatbothasiteandsubcatchmentlevelasrelevant.
d.Whetherthereareprocessesinplacetoensurethatstormwatermanagementwillbeimplementedinaccordancewiththestructureplanorframeworkplanrequirements.
e.WhetherthereisclearidentificationofthoseelementsthataretobevestedinCouncilandthattheymeetthecouncilrequirementsforvestedinfrastructure.
f.Theextenttowhichadverseeffectsofstormwaterdiversionsanddischargesarepreventedormitigated,withparticularregardto:
i.
ii.
iii.iv.
v.
thenature,quality,volumeandpeakflowofthestormwaterrunoff
thesensitivityofnaturalfreshwatersystemsandcoastalwaters,includingtheHaurakiGulfMarinePark,totheadverseeffectsofstormwatercontaminantsandflows
thepotentialforthediversionanddischargetocreateorexacerbatefloodrisks
optionstomanagestormwateronsiteortheuseofcommunalstormwatermanagementmeasures
practicallimitationsinrespectofthemeasuresthatcanbeapplied.
g.Theextenttowhichfloodplains,foodsensitiveandfloodproneareasanddevelopmentareamanagedandwhetheroverlandflowpathshavebeenidentifiedandprotected.
1.4AssessmentRestricteddiscretionaryactivities
1.4.1Mattersofdiscretion
1.ExistingImperviousAreas
a.themanagementoftheadverseeffectsofthestormwaterdiversionanddischargeonreceivingenvironments,buildingsandproperty
b.consistencywithanyrelevantnetworkdischargeconsentorpubliclyavailableandcurrentAucklandCouncilstormwatermanagementplans/analysis
c.operationsandmaintenancerequirements.
d.monitoringandreporting.
2.Stormwaternetworks
a.theBPOforthemanagementoftheadverseeffectsofthestormwaterdiversionanddischargeonreceivingenvironments,buildingsandpropertydischarges
b.monitoringandreporting,includingonanetworkwidebasis
c.operationsandmaintenancerequirements
d.theimplementationofstormwatermanagementdevicesandothermeasurestogiveeffecttotheBPOforpreventingorminimisingtheadverseeffectsofstormwaterdischargesfrombothexistingand,whererelevant,future
e.anyprogrammeoffurtherinvestigationsandworksrequiredtogiveeffecttotheBPO
f.theimplementationofanyprogrammesrequiredtogiveeffecttotheBPO.
3.Publicroadsoperatedbyaroadcontrollingauthority
a.theadoptionoftheBPOtopreventorminimiseadverseeffectsofthestormwaterdiversionanddischargeonreceivingenvironments,buildingsandproperty
b.consistencywithanyrelevantnetworkdischargeconsentorpubliclyavailableandcurrentAucklandCouncilstormwatermanagementplans/analysis
c.themanagementandmitigationoffloodeffects,includingonbuildingsandproperty
d.operationsandmaintenancerequirements
e.monitoringandreporting,includingmonitoringandreportingonanetworkwidebasis.
4.Groundsoakageandpeatsoils
a.methodsofsoakage
b.measurestominimisethedischargeofcontaminantstogroundwateraquifers
c.measurestomaintainsoilmoisturelevelsinpeatsoils
d.disposalofstormwaterinexcessofdevicecapacityandthemanagementofassociatedadverseeffects
e.themanagementandmitigationoffloodeffects,includingonbuildingsandproperty
f.operationsandmaintenancerequirements
g.monitoringandreporting,includingmonitoringandreportingonanetworkwidebasis.
5.Imperviousareasnototherwiseprovidedforbystormwaternetwork,publicroad,groundsoakageandpeatsoilrules
a.thelocationandmethodofthedischarge
b.methodsandmeasurestoavoidlandinstability,erosion,scourandfloodrisk
c.themanagementofstormwaterflowandvolumeformaintainingorenhancingstreamchannelsandstreamhealth
d.themanagementoftheadverseeffectsofthestormwaterdiversionanddischargeonreceivingenvironments,buildingsandproperty,includingcumulativeeffects
e.operationsandmaintenancerequirements
f.monitoringandreporting.
6.Infringementofzonemaximumimperviousareacontrolandinfringementofzonemaximumimperviousareawithinariparianyard.
a.thelocationandmethodofthedischarge
b.methodsandmeasurestoavoidlandinstability,erosion,scourandfloodrisk
c.themanagementofstormwaterflowandvolumeformaintainingorenhancingstreamchannelsandstreamhealth
d.themanagementoftheadverseeffectsofthestormwaterdiversionanddischargeonreceivingenvironments,buildingsandproperty,includingcumulativeeffects
e.operationsandmaintenancerequirements
f.monitoringandreporting.
1.4.2Assessmentcriteria
1.Allrestricteddiscretionaryactivities(excludingstormwaternetworksandpublicroadsandinfringingthezonemaximumimperviousareawithinariparianyard)
a.theextenttowhichtheproposalpreventsorminimisestheadverseeffectsofthedischarge,includingcumulativeeffects,totheextentpossiblehavingregardto:
i.
ii.iii.iv.
v.
vi.vii.viii.
thenature,volumeandpeakflowofthestormwaterdischarge
thesensitivityofthereceivingenvironmenttostormwatercontaminantsandflowsavoidingthecreationorincreaseoffloodrisktootherproperties
optionsformanagingstormwateronsiteorthroughcommunalmanagementdevicespracticallimitationsonthemeasuresthatmaybeused
maintainingwaterlevelsinunderlyingpeatsoilsandgroundstability(whererelevant)theadoptionofwatersensitivedesignandgreeninfrastructurewherepracticable
vManaWhenuaandcommunityvaluesanduses
b.optionsfordischargewherethereisnoavailablestormwaternetwork
c.consistencywithanyrelevantnetworkdischargeconsentorpubliclyavailableandcurrentAucklandCouncilstormwatermanagementplans/analysis
d.opportunitiestoreduceexistingadverseeffectsandenhancereceivingenvironments
e.theeffectsonmarinesedimentquality,inaccordancewithCoastalZoneDischargesPolicy10
andassociatedTable1.
2.Infringingthezonemaximumimperviousareawithinariparianyard
a.Developmentthatdoesnotcomplywiththeriparianorcoastalyardcontrolswillneedtodemonstratethat:
i.
ii.iii.iv.
v.
vi.
adverseeffectsonthefunctionoftheyardinmanagingflooding,erosion,orwaterquality,willbeminimised
thecontinuityofanyvegetationcorridorwillbemaintained
Siteworksandassociatedvehiclemovementsareminimisedinthewithintheyard
thereisnopracticablealternativetodevelopmentwithintheyardandthatthedevelopmentislocatedasfarfromtheCoastalMarineArea,orstreamaspossible
locatingdevelopmentwithintheyardisrequiredforthereasonableuseanddevelopmentofthesite,includingfortheprovisionofpublicaccessorinfrastructuresuchasrecreationaltrails,bridges/culverts,undergroundutilities,wastewaterorstormwaterinfrastructure
theadverseeffectsofdevelopmentwithintheyardaremitigatedbyplantingwithnativeplantsand/orprovidingawidersetbackelsewherethatwillenhancethefunctionoftheyard
3.StormwaterNetworksandPublicRoads
a.theextenttowhichtheBPOaddressesthemattersforstormwaternetworksandroadsinAucklandwideWaterqualityandintegratedmanagementPolicy10andTable1.
b.theeffectsonmarinesedimentquality,inaccordancewiththeCoastalzoneDischargesPolicy10andassociatedTable1.
1.5Requirementsforstormwaternetworkdischargeconsents
Table1:
A / Theissuesarisingfromstormwaterandwastewaterdischarges,diversionsandassociatedactivitiesfacingthecatchmentordistrict,including:
i / descriptionofthedrainagenetworksandtheircurrentandpredictedfutureperformanceunderlikelygrowth
scenarios
ii / assessmentofthereceivingenvironmentandtheactualandpotentialeffects,includingcumulativeeffects,
ofdiversionsanddischargesfromthenetwork
iii / identificationofpotentialurbangrowth,landuseintensificationandredevelopmentandtheconsequenceof
thisforthenetworkanddischarges
iv / managementresponsibilitiesforstormwaterandwastewaternetworksandassociateddischarges
v / significantnonnetworklanduseanddischargeactivitiesthatmayhaveamaterialeffectonenvironmental
andstormwatermanagementoutcomes
B / Adescriptionoftheobjectivessoughtforthestormwaterandwastewaterdischargesand
diversionsincluding:
i / social,ecological,economic,amenityandculturalobjectivesincludingthestrategicimportanceofthe
activityandstormwaternetwork
ii / theresultsofanyconsultation
iii / identifiedmilestonesrequiredtoachievethoseobjectives
C / Theproposedapproachtomanagingdiversionsanddischargesincluding:
i / identificationoftheBPOforpreventingorminimisingtheadverseeffectsofstormwaterdischargesfromboth
existingand,whererelevant,futuredischarges
ii / prioritiesforfurtherinvestigationintominimisingtheeffectsofthedischargesanddevelopmentof
managementresponsesandassociatedmilestones
iii / proceduresformonitoringandreportingprogressagainstobjectivesandmilestones
iv / aregionallyprioritisedprogrammeforimplementingimprovementprojectsandworks
v / operationandmaintenanceprogrammesandprocesses
vi / otherprogrammestoassistinachievingoutcomesincludingeducationinitiativesandcommunitybased
programmes
vii / consistencywithotherlanduseprocessoutcomessuchasstructureplans,andpubliclyavailableand
currentAucklandCouncilstormwatermanagementplans/analysis
viii / aprocessforreviewingthemanagementapproachbasedonanincreasedunderstandingofenvironmental
responses,publichealthissues,communityaspirationsandnetworkpriorities
D / PublicRoadNetworks(wherenotincludedinwiderstormwaternetworkdischargeconsents)
i / descriptionofthedrainagenetworksandtheircurrentandpredictedfutureperformanceunderlikelygrowth
ii / assessmentofthereceivingenvironmentandtheactualandpotentialeffects,includingcumulativeeffects,
ofdiversionsanddischargesfrom thenetwork
iii / considerationofalternativeoptionswherepotentialadverseeffectsaresignificant
iv / social,ecological,economic,amenityandculturalobjectivesincludingthestrategicimportanceofthe
activityandstormwaternetwork
v / theresultsofanyconsultation
vi / consistencywithotherlanduseprocessoutcomessuchasstructureplans,andpubliclyavailableand
currentAucklandCouncilstormwatermanagementplans/analysis
vii / identificationoftheBPOforpreventingorminimisingtheadverseeffectsofstormwaterdischargesfromboth
existingand,whererelevant,futuredischarges
viii / operationandmaintenanceprogrammesandprocesses
ix / monitoring
2.Stormwater Management Flow
Itisanticipatedthattechnicalguidancewillbeprovidedthroughbestmanagementpracticeguidelinestosupportimplementationofflowrulesinthischapter.
2.1Activitytable
[rp]
Section9(2)RMAlandusecontrolsformanagingstormwaterflowsActivity / Activitystatus
WithinordischargingtoaStormwaterManagementArea–Flow(SMAF)1or2
Imperviousareas(otherthanforapublicroad)oflessthanorequalto25m2inaSMAF1or2 / P
Imperviousareas(otherthanforapublicroad)greaterthan25m2inaSMAF1or2(otherthan
forapublicroad)thatmeethydrologymitigationrequirements / C
ImperviousareasinaSMAF1or2unabletocomplywiththepermittedandcontrolledactivity
controls / RD
PublicroadsoperatedbyaroadcontrollingauthoritywithinaStormwaterManagementArea–Flow
(SMAF)1or2
Imperviousareaslessthanorequalto1000m2withinaSMAF1or2thatmeetthehydrology
mitigationrequirements / P
Imperviousareasgreaterthan1000m2andlessthanorequalto5000m2withinaSMAF1or2
thatmeethydrologymitigationrequirements / C
ImperviousareaswithinaSMAF1or2thatdonotmeetthepermittedandcontrolledactivity
controls / RD
Imperviousareaswherestormwaterisdirectedtothecombinedsewernetwork(includingfrom
publicroads)
Theredevelopmentofexistingimperviousareaswheretheseareasdirectstormwatertothe
combinedsewernetwork / P
Thedevelopmentofnewimperviousareaswheretheseareasdirectstormwatertothe
combinedsewernetwork / C
Thedevelopmentofneworredevelopmentofexistingimperviousareaswheretheseareasdirectstormwatertothecombinedsewernetworkandareunabletomeetthepermittedand
controlledactivitycontrols / D
Imperviousareasinurbanareas(excludingthestrategictransportcorridorandroads)notconnected
tothestormwaternetwork
Thedevelopmentofnewimperviousareaslessthan25m2wherethetotalimperviousareaon
thesitecompriseslessthanorequalto10%ofthetotalsitearea / P
Thedevelopmentofnewimperviousareasgreaterthan25m2wherethetotalpercentage
imperviousareaonthesiteisgreaterthan10% / C
Thedevelopmentofnewimperviousareasthatdonotmeetthepermittedorcontrolledactivity
controls / D
AllzoneswithanImperviousAreaThresholdwherenototherwisecontrolledwithinSMAF1or2,
combinedsewerornotconnectedtostormwaternetwork(excludingtheHaurakiGulfIslands)
Totalimperviousareaonthesiteislessthanorequaltotheimperviousareathresholdforthe
relevantzone / P
Totalimperviousareaonthesiteisgreaterthantheimperviousareathresholdfortherelevant
zoneinallareas / RD
2.2Controls
2.2.1Permittedactivities
1.PublicroadsoperatedbyaroadcontrollingauthoritywithinaStormwaterManagementArea–Flow(SMAF)1or2
a.thenew/redevelopedimperviousarea,includingfootpaths,cyclewaysandancillaryareasmustbelessthan1000m2
b.stormwatervolumesandflowfromtheareamustbemanagedtoachievethehydrologymitigationrequirementspecifiedinTable2forSMAF1andSMAF2
c.thestormwatermanagementdevicemustbecertifiedbyacouncilapprovedcharteredprofessionalengineerasbeingdesignedtomeettherequiredlevelofhydrologymitigationandisconstructed
inaccordancewiththedesignandsoundengineeringpractice.
d.thestormwatermanagementdeviceisfullyoperationalpriortopublicuseofroad.
e.‘asbuilt’plansandanoperationsandmaintenanceplanareprovidedtocouncilwithinthreemonthsofpracticalcompletionoftheworks.
f.anydevicesaremaintainedinaccordancewiththeoperationsandmaintenanceplan.
2.Imperviousareaswherestormwaterisdirectedtothecombinedsewernetwork(includingpublicroads)
a.theredevelopmentdoesnotresultinanincreaseinimperviousareaandstormwaterrunoffdischargingtothecombinedsewernetwork.
b.thereisnoalternativedischargeoption.
3.Imperviousareasinurbanareas(excludingthestrategictransportcorridorandroads)notconnectedtothestormwaternetwork
a.either:
i.
ii.
theincreaseinimperviousareaabovethatexistingatthedateofnotificationoftheUnitaryPlanislessthan25m2;or
thetotalimperviousareaislessthan10percentofthesiteare.
2.2.2Controlledactivities
1.New/redevelopmentofimperviousareaswithinaSMAF1or2(excludingpublicroads)
a.thetotalsiteimperviousareaislessthanorequaltotheImperviousAreaThresholdfortherelevantzone
b.wherethenewimperviousareaortheredevelopmentofexistingimperviousareacompriseslessthan50percentofthetotalsiteareastormwaterfromtheneworredevelopedareaismanagedtoachievetheHydrologymitigationrequirementsspecifiedinTable2foraSMAF1andSMAF2
c.wherethenewimperviousareaortheredevelopmentofexistingimperviousareascomprisesmorethanorequalto50percentofthetotalsitearea:
i.stormwaterfromthetotalsiteimperviousareaismanagedtoachievethehydrologymitigationrequirementsspecifiedinTable2foraSMAF1andSMAF2.
2.PublicroadsoperatedbyaroadcontrollingauthoritywithinaSMAF1or2
a.thenew/redevelopmentimperviousarea,includingfootpaths,cyclewaysandancillaryareasisgreaterthan1,000m2butlessthan5,000m2.
b.stormwaterrunofffromthenew/redevelopedarea,andanyadditionalexistingareadischargingtothesamedischargepoint(s)ismanagedtoachievethehydrologymitigationrequirementsspecifiedinTable2foraSMAF1andSMAF2.
3.Newimperviousareaswherethestormwaterisdirectedtothecombinedsewernetwork
a.thetotalsiteimperviousareaislessthanorequaltotheImperviousAreaThresholdfortherelevantzone
b.anynewimperviousareadoesnotincreasethetotalimperviousareaorstormwaterrunofffromthesitedirectedtothecombinedsewernetwork.
4.Imperviousareasinurbanareas(excludingthestrategictransportcorridorandroads)notconnectedtothestormwaternetworkorgroundsoakage
a.thetotalsiteimperviousareaislessthanorequaltotheImperviousAreaThresholdfortherelevantzone
b.stormwaterrunoffcanbedischargedfromthesitewithoutgivingrisetosignificantadverseeffects(includingcumulativeeffects)including:
i.
ii.iii.
erosionorscouratornearthepointofdischargefloodingofanyhabitablefloororotherproperty
landinstability,includingcliffandstreambankerosion.
2.3AssessmentControlledactivities
2.3.1Mattersofcontrol
1.Allcontrolledactivities
a.theimplementationofstormwatermanagementsystemsordevicestoachievestormwaterhydrologymitigationrequirement
b.operationsandmaintenancerequirements
c.monitoringandreporting,includingmonitoringandreportingonanetworkwidebasiswhereapplicable.
2.PublicroadsoperatedbyaroadcontrollingauthoritywithinaSMAF1or2
a.theprovisionofdesignspriortoworkstartingandasbuiltplansfollowingcompletionofworks.
3.New/redevelopmentofimpervioussurfacesgreaterthanorequalto1000m2andlessthan5,000m2forapublicroadinSMAF1or2
a.measurestomanagestormwaterrunofftonomorethanexistinglevels.
4.Imperviousareasinurbanlanduses(excludingthestrategictransportcorridorandroads)notconnectedtothestormwaternetwork
a.themethodofstormwatermanagementanddischargemeasuresandtheextenttowhichtheyminimiseormitigateadverseeffects,includingflooding,erosionandlandstability
b.conditionsinrespectofconnectingintoastormwaternetworkshouldonebecomeavailable.
2.3.2Assessmentcriteria
1.Allcontrolledactivities
a.Whetherthesitestormwaterrunoffisdirectedtoanonsitedeviceand/orviaacommunalorpublicmanagementdevicedesignedandsizedtoaccommodatestormwaterrunofffromthesiteandachievethestormwaterhydrologymitigationrequirements.
2.4AssessmentRestricteddiscretionaryactivities
2.4.1Mattersofdiscretion
1.Allrestricteddiscretionactivities
a.themanagementofeffects,includingcumulativeeffects,onstreams,thecapacityofthestormwaternetwork,andfloodingwithinthecatchment
b.thedesignandimplementationofstormwaterflow/volumemanagementmeasures
c.operationsandmaintenancerequirements
d.monitoringandreporting.
2.Imperviousareaswherestormwaterisdirectedtothecombinedsewernetwork(includingfrompublicroads)
a.measurestomitigatepotentialincreasesinoverflowsfromthecombinedsewernetwork.
3.Imperviousareasinurbanareas(excludingthestrategictransportcorridorandroads)notconnectedtothestormwaternetwork
a.methodsofstormwaterdisposal
b.themanagementofpotentialeffectsonlandstabilityanderosion
c.theconnectiontoapublicstormwaternetworkshouldonebecomeavailable.
2.4.2Assessmentcriteria
1.Allrestricteddiscretionaryactivities
a.theextentofexistingfloodingwithinthecatchmentandavoidingcreatingorincreasingexistingflooding,includingincrementaladverseeffects
b.theextenttowhichtheincrementalandcumulativeadverseeffectsofincreasedstormwaterflowsincludingonstreamchannelsandstreamhealth,naturalcharacter,biodiversity,erosionandstabilityandcommunityandManaWhenuavaluescanbeavoided,orifnotavoidedthenotherwiseadequatelymitigated;
c.theabilitytoreduceexistingadverseeffects
d.whetherastormwaternetworkisavailableanditscapacitytocaterforincreasedstormwaterflows
e.whetherstormwaterflowismanagedonsiteorwhethertherearestormwatermanagementdevicesinthecatchmentandtheirabilitytoacceptandcaterforincreasedstormwaterflowstomeetmitigationrequirements
f.theabilityofmitigationmeasurestodetainthe2,10and100year,24hrrainfalleventpeakflowstothepredevelopment(grass)conditionfortheexcessimperviousarea(appliestonew/redevelopmentofimperviousareasinexcessofzoneimperviousareathresholdsonly)
Table2:StormwaterManagementAreaFlowhydrologymitigationrequirements
StormwaterManagement Area / Hydrologymitigationrequirement
SMAF1 / •providedetention(temporarystorage)withavolumeequaltotherunoffvolumefromthe95thpercentile,24hrrainfalleventfortheimperviousareaforwhichhydrologymitigationisrequired;and
•provideretention(volumereduction)ofa10mm,24hrrainfalleventforthe impervious
areaforwhichhydrologymitigationisrequired
SMAF2 / •providedetention(temporarystorage)withavolumeequaltotherunoffvolumefromthe90thpercentile,24hrrainfalleventfortheimperviousareaforwhichhydrologymitigationisrequired;and
•provideretention(volumereduction)ofa8mm,24hrrainfalleventforthe impervious
areaforwhichhydrologymitigationisrequired
3.Stormwatermanagementquality
3.1Activitytable
[rp]
Section9(2)RMAlandusecontrolsformanagingstormwatercontaminantsinrunofffromhighcontaminantgeneratinglanduseactivities
Activity / Activitystatus
Newandredevelopmentofexistinguncoveredparking(includingthatwhichisaccessorytothe
mainuseofthesite)
Uncoveredparking(includingthatwhichisaccessorytothemainuseofthesite)includingentry/exit(includingthatwhichisaccessorytothemainuseofthesite),whichislessthanor
equal1000m2inareaandwhicharenotlocatedintheIndustrialorTradeActivityarea / P
Uncoveredparking(includingthatwhichisaccessorytothemainuseofthesite)includingentry/exit,whicharegreaterthan1000m2inareaandwhicharenotlocatedintheIndustrialor
TradeActivityarea,wherestormwaterqualitymanagementrequirementsaremet / C
Uncoveredparking(includingthatwhichisaccessorytothemainuseofthesite)including
entry/exit,whichdonotmeetthepermittedandcontrolledactivitycontrols / RD
Newhighcontaminantyieldingroofing,claddingorarchitecturalfeatures
Theinstallationofhighcontaminantyieldingroofing,spouting,claddingmaterialor
architecturalfeatures,subjecttomeetingmaximumareathresholds / P
Theinstallationofhighcontaminantyieldingroofing,spouting,claddingmaterialor architecturalfeatures,exceedingpermittedactivityareacontrolsandwherestormwaterquality
managementrequirementsaremet / C
Theinstallationofhighcontaminantyieldingroofingspouting,claddingmaterialorarchitectural
featuresthatdoesnotmeetthepermittedandcontrolledactivitycontrols / D
New,andredevelopmentofexisting,highusepublicroadsoperatedbyaroadcontrollingauthority
Imperviousarealessthanorequalto5000m2 / P
Imperviousareathatdischargesstormwatertoanexistingconsentedstormwaterquality
managementdevice / P
Imperviousareagreaterthan5000m2wherestormwaterqualitymanagementrequirementsare
met / C
Imperviousareathatdoesnotmeetthepermittedactivityandcontrolledactivitycontrols / RD
3.2Controls
3.2.1Permittedactivities
1.New,andredevelopmentofexisting,uncoveredparking(includingthatwhichisaccessorytothemainuseofthesite)
a.Theneworredevelopedparkingincludingentry/exitmustbelessthan1000m2,excludinganyareathatisincludedinanIndustrialorTradeActivityarea.
2.Newhighcontaminantyieldingroofing,spouting,claddingorarchitecturalfeatures
a.Thetotalareaofhighcontaminantyieldingroofing,spouting,claddingorarchitecturalfeaturesusedonthesitemustnotexceed:
i.
ii.
iii.
25m2inurbanarea
25m2inanyruralzonewherethestormwaterrunofffromtheroofing,spouting,claddingorarchitecturalfeaturesispipeddirectlytoawatercourse
250m2inanyruralzonewherethestormwaterrunofffromtheroofing,spouting,claddingorarchitecturalfeaturesisdirectedtoanyvegetateddrain/swale,wetlandorsimilar.
3.New,andredevelopmentofexisting,highusepublicroadslessthan5000m2
a.Thenew/redevelopedimperviousareaofthehighuseroadmustbelessthanorequalto5000m2
b.Stormwaterrunofffromthenew/redevelopedarea,andanyadditionalexistingareadischargingtothesamedischargepoint(s),mustbemanagedbydevicesthataredesignedtomeetthestormwaterqualitymanagementrequirementsfortherelevantcontaminantsofconcerninTables3and4.
c.Thestormwatermanagementdevicesmustbecertifiedbycouncilapprovedcharteredprofessionalengineerasbeingdesignedtomeetthestormwaterqualityrequirementsandisconstructedinaccordancewiththedesignandsoundengineeringpractice.
d.Thestormwatermanagementdevicesmustbebuiltgenerallyinaccordancewiththecertifieddesignandisfullyoperationalpriortopublicuseofthenew/redevelopedroad.
e.‘Asbuilt’plansandanoperationsandmaintenanceplanmustbeprovidedtocouncilwithinthreemonthsofpracticalcompletionoftheworks.
f.Stormwatermanagementdevicesmustbemaintainedinaccordancewiththeoperationsandmaintenanceplan.
g.Acomplianceprogrammemustbeestablishedandfollowedtoensurecompliancewithallpermittedactivitycontrolsandisprovidedtocouncilbythreemonthsofpracticalcompletionoftheworks.
4.New,andredevelopmentofexisting,highuseroadsthatdischargetoexistingstormwaterqualitymanagementdevices
a.Stormwaterrunofffromthenew/redevelopedareamustbedirectedtoanexistingstormwaterqualitymanagementdevice,requiredbyacurrentstormwaterdischargeconsent,subjectto:
i.
ii.
certificationbyacouncilapprovedcharteredprofessionalengineerthattheexistingstormwatermanagementdeviceisdesignedandsizedtoaccommodatetheincreaseinflowfromthenew/redevelopedimperviousareawithoutreducingdesigntreatmentlevelsorcausingscourorerosion;
stormwatermanagementdevicesaremaintainedinaccordancewithresourceconsentrequirementsoranoperationsandmaintenanceplan
3.2.2Controlledactivities
1.New,andredevelopmentofexisting,uncoveredparking(includingthatwhichisaccessorytothemainuseofthesite)
a.Wheretheneworredevelopmentofexistinguncoveredparkingareas,includingentry/exit,comprisesmorethan1000m2butislessthan50percentofthetotalcarparkarea(excludinganyareathatisincludedinanIndustrialorTradeActivityarea):
i.stormwaterrunofffromthenew/redevelopedparkingmustbemanagedbydevicesthataredesignedtomeetthestormwaterqualitymanagementrequirementsfortherelevantcontaminantsofconcerninTables3and4.
b.Wheretheneworredevelopmentofexistinguncoveredparking,includingentry/exit,comprisesmorethan1000m2andisgreaterthan50percentofthetotalparkingarea(excludinganyareathatisincludedinanIndustrialorTradeActivityarea):
i.stormwaterrunofffromtheentireparkingareamustbemanagedbydevicesthataredesignedtomeetthestormwaterqualitymanagementrequirementsfortherelevantcontaminantsofconcerninTables3and4.
2.Newhighcontaminantyieldingroofingspouting,claddingorarchitecturalfeatures
a.Thetotalareaofanyhighcontaminantyieldingroofing,spouting,claddingorarchitecturalfeaturesusedonthesiteexceeds:
i.
ii.
iii.
25m2inanyurbanzone.
25m2inanyruralzonewheretherunofffromtheroofing,spouting,claddingorarchitecturalfeaturesispipeddirectlytoawatercourse.
250m2inanyruralzonewheretherunofffromtheroofing,spouting,claddingorarchitecturalfeaturesisdirectedtoanyvegetateddrain/swale,wetlandorsimilar.
b.Stormwaterrunofffromtheroofing,spouting,claddingorarchitecturalfeaturesismanagedbydevicesthataredesignedtomeetthestormwaterqualitymanagementrequirementsfortherelevantcontaminantsofconcerninTables3and4.
3.New/redevelopedimperviousareaforahighusepublicroad
a.Stormwaterrunofffromthenew/redevelopedimperviousarea,andanyadditionalexistingimperviousareadischargingtothesamedischargepoint(s),ismanagedbyadeviceordevicesdesignedtomeetthestormwaterqualitymanagementrequirementsfortherelevantcontaminantsofconcerninTables3and4.
3.3AssessmentControlledactivities
3.3.1Mattersofcontrol
1.Allcontrolledactivities
a.theimplementationofastormwatermanagementsystemordevicestoachievethestormwaterqualitymanagementrequirements
b.operationsandmaintenancerequirements
c.monitoringandreporting,onanetworkwidebasis.
3.3.2Assessmentcriteria
1.Allcontrolledactivities
a.whetherthesitestormwaterrunoffisdirectedtoanonsitedeviceand/orviaacommunalorpublicmanagementdevicedesignedandsizedtoaccommodatestormwaterrunofffromthesiteandachievethestormwaterqualitymanagementrequirements.
3.4AssessmentRestricteddiscretionaryactivities
3.4.1Mattersofdiscretion
Thecouncilwillrestrictitsdiscretiontothemattersbelowforrestricteddiscretionaryactivities.
1.Infringementofmaximumimperviousareacontrolwithinriparianyardsorinfringementofthecoastalprotectionyard:
a.adverseeffectsonthefunctionoftheyard
b.thecontinuityofanyvegetation
c.siteworksandassociatedvehiclemovements
d.pacticablealternatives
e.reasonableuseanddevelopmentofthesite
f.mitigation.
2.Newandredevelopmentofexistinguncoveredparkingorparkingareas(includingthatwhichisaccessorytothemainuseofthesite)
a.stormwaterqualitymanagementrequirementsforminimisingadverseeffects
b.implementationofstormwaterqualitymanagementmeasures
c.operationsandmaintenancerequirements
d.monitoringandreporting,includingmonitoringandreportingonanetworkwidebasis.
3.Newandredevelopmentofexistingimperviousareaforahighusepublicroad
a.theimplementationoftheBPOformanagingstormwaterqualityandassociatedadverseeffects
b.Stormwaterqualitymanagementrequirements
c.Operationsandmaintenancerequirements
d.Monitoringandreporting,includingmonitoringandreportingonanetworkwidebasis.
3.4.2Assessmentcriteria
Thecouncilwillconsiderthereleventassessmentcriteriabelowforrestricteddiscretionaryactivities.
1.Allrestricteddiscretionaryactivities
a.thenatureofthedischarge;
b.thesensitivityofthereceivingenvironment,includingcoastalwaters,anditssusceptibilitytotheadverseeffectsofstormwatercontaminants
c.theextenttowhichincrementalandcumulativeadverseeffectsofstormwatercontaminantsonreceivingenvironmentsincludingonbiodiversity,communityandManaWhenuausesandvaluescanbeavoided,orifnotavoidedthenotherwiseadequatelymitigated;
d.theabilitytoreduceexistingadverseeffects
e.whetherstormwatercontaminantsaremanagedonsiteorwhethertherearestormwatermanagementdevicesinthecatchmentthatcanacceptandcaterforincreasedstormwatercontaminantloadstomeetmitigationrequirements
f.theeffectsonmarinesedimentquality,inaccordancewithAucklandwidewaterqualityandintegratedmanagementpolicy10andTable1.
2.Infringementofmaximumimperviousareacontrolwithinriparianyardsorinfringementofthecoastalprotectionyard:
a.developmentthatdoesnotcomplywiththeriparianorcoastalyardcontrolswillneedtodemonstratethat:
i.
ii.iii.iv.
v.
vi.
adverseeffectsonthefunctionoftheyardinmanagingflooding,erosion,orwaterquality,willbeminimised
thecontinuityofanyvegetationcorridorwillbemaintained
siteworksandassociatedvehiclemovementsareminimisedinthewithintheyard,
thereisnopracticablealternativetodevelopmentwithintheyardandthatthedevelopmentislocatedasfarfromtheCoastalMarineArea,orstreamaspossible
locatingdevelopmentwithintheyardisrequiredforthereasonableuseanddevelopmentofthesite,includingfortheprovisionofpublicaccessorinfrastructuresuchasrecreationaltrails,bridges/culverts,undergroundutilities,wastewaterorstormwaterinfrastructure
theadverseeffectsofdevelopmentwithintheyardaremitigatedbyplantingwithnativeplantsand/orprovidingawidersetbackelsewherethatwillenhancethefunctionoftheyard.
3.Newandredevelopmentofexistingimperviousareaforahighusepublicroadunabletomeetrules,permittedactivityandcontrolledactivitycontrols
a.thenatureofthedischarge;
b.thesensitivityofthereceivingenvironment,includingcoastalwaters,anditssusceptibilitytotheadverseeffectsofstormwatercontaminants
c.theextenttowhichincrementalandcumulativeadverseeffectsofstormwatercontaminantson
receivingenvironmentsincludingonnaturalcharacter,biodiversity,communityandManaWhenuausesandvaluescanbeavoided,orifnotavoidedthenotherwiseadequatelymitigated;
d.theabilitytoreduceexistingadverseeffects;
e.theextenttowhichthewaterqualitymattersforstormwaternetworksandroadsinAucklandwidewaterqualityandintegratedmanagementpolicy10andTable1.
f.theeffectsonmarinesedimentquality,inaccordancewithCoastalZonesdischargespolicy10
andTable1.
g.hepracticalityandlimitationsofapplyingstormwaterqualitymanagement,particularlytoexistinghighuseroadnetworks.
Table3:Stormwaterqualitymanagementrequirements
Symbol / Name / Designeffluentqualityrequirementforstormwaterrunofffrom90%oftheannualrainfall
M / Metals / Totalzinc30µg/L,Totalcopper
10µg/L
S / Sediment / Totalsuspendedsolids20mg/L
T / Temperature / Temperature25°C
Table4:Stormwatercontaminantsofconcern
Receivingenvironment / LanduseactivityHighuseroads,carpark / Roofingmetal / Industrialsitesactivityarea
RiverorStream / M,S,T / M,T / Appropriatetonatureofactivities,contaminantsandreceiving
environments
Allotherreceivingenvironments / M,S / M
S=sedimentM=metals
T=temperature