EDEWG Change Request #017
This EDEWG Change Request can be found on the PUC website at Error! Bookmark not defined.
Requester’s Name: Bernedette Foisy / EDC/EGS Name: PECO Energy Company / Phone # : 215-841-4835Date of Request: 2-25-00 / Affected EDI Transaction Set #(s): 810 LDC Consolidated Bill / E-Mail Address:
Requested Priority (emergency/high/low): high / Requested Implementation Date:
ASAP / Status:
Closed/Rejected
Brief Explanation (This will be copied into the description in the Change Control Summary Spreadsheet):
Change the 810 PA Note on the DTM150/151 segments to:
Required – Must match the service period dates in PTD*SU loop from the 867 transaction. If submitting charges at the rate level must match the PTD*PM loop on the 867
Detail Explanation (Exactly what change is required? To which EDEWG Standards? Why?):
The PA Note in the 810 implementation guideline for the DTM 150/151 segments states: Required – Must match the service period dates in PTD*SU loop from the 867 transaction.
PECO has an exception to this rule if an EGS is sending charges at the rate level. The 810 DTM150 must match the PTD “PM” loop on the 867.
EXAMPLE:
SU loop has a service period to-from date of 19991105 - 19991203
PM loop has a service period to-from date of 19991106 - 19991203. First Rate
PM loop has a service period to-from date of 19991105 - 19991202. Second rate
Segment: DTM Date/Time Reference
Position: 150
Loop: IT1 Optional
Level: Detail
Usage: Optional
Max Use: 10
Purpose: To specify pertinent dates and times
Syntax Notes: 1 At least one of DTM02 DTM03 or DTM05 is required.
2 If DTM04 is present, then DTM03 is required.
3 If either DTM05 or DTM06 is present, then the other is required.
Semantic Notes:
Comments:
PA Use: / Required – Must match the service period dates in PTD*SU loop from the 867 transaction.NJ Use: / Same as PA
Example: / DTM*151*19990201
Discussion: Brandon and Kim expressed disagreement with this approach. The 867 has dates in the “SU” Loop and there does not seem to be added benefit to having suppliers modify their systems to change the dates to the PM loop. Originally the dates were there as a check to be sure you are sending an 810 for the appropriate 867. Today we have the cross reference number so the dates become less meaningful.
PECO agreed to deal directly with their trading partners who are using the RATE loop to provide the billing information.
1