SYED ALI MURTAZA
Profession
Civil Engineer
Position
Structural Inspector
Nationality
Pakistani
Qualifications
2007– DAECivil Engineering,Government College of Technology, Pakistan
2004 – Intermediate School, Board of Intermediate & Secondary Education, Gujranwala, Pakistan
2014 - Fire Marshal Training,
Hyder Consulting Middle East Limited UAE
2013 - Osha safety certificate, Presidential palace project, UAE
2012– Doka Formwork certificate, presidential palace project UAE
Memberships
2007 – DAE, GCT Rasul, Pakistan
Areas of Expertise
Civil Engineering / Key Experience and Background
To work in a prestigious corporation, where I can distinctively contribute towards achieving mutual goals and excel my competence. While employing my capabilities and educational qualification at full as an Engineer.
  • Well versed in Inspector related Finishing works inspection, to check and testing.
  • Knowledge of preparing concrete mix design prior to trial mix and testing.
  • Knowledge in AutoCAD.
  • Could operate effectively with Microsoft office tools namely word, excel, power point, and outlook.
  • Open minded to work in complex environment and projects.
  • Safety certificate for safe Work.

Professional History
Year / Position / Company / Country
2014 – Date / Structural Inspector / Hyder Consulting Middle East Limited / Dubai, UAE
2013 – 2014 / Civil Inspector / AL SALAAM Consulting Architects, Engineers & Planners / Al Ain, UAE
2010 – 2013 / QA/QC Engineer / Ghantoot Contracting Company / Abu Dhabi, UAE
Professional History (continued)
Year / Position / Company / Country
2008 – 2010 / Site Engineer / AL BADI Contracting Company Oman / Oman
2007 – 2008 / Site Engineer / ALIYA Building Contracting Company / Ajman, UAE
2007 – 2007 / Site Engineer / KKP Contracting company / Pakistan

Project Summary

2014 – Date / Hyder Consulting Middle East Limited – Structural Inspector
W Hotel Project Palm Jumeirah Dubai:This luxury resort, situated on the Crescent of the Palm Jumeirah, is a world class hotel resort and residential complex with a spa, pool areas, water features and other amenities comprising of approximately 100,000 m² of accommodation including 300 hotel rooms and 45 super luxury duplex, triplex apartments and penthouses.
Responsibilities:
  • Checking the setting out such as excavation , Pile caps, starter rebar’s Footing nick column column , ‘shearing retaining core’ wall slab
  • Rebar and Formwork checking for all kinds of structural. such as excavation ,Pile caps, starter rebar’s Footing nick column column , ‘shearing retaining core’ wall slab
  • Checked waterproofing activates system vertical and horizontal.
  • Checked the setting out of block work as per approved architecture drawing and completion of block work such as, approved mortar, grooves, alignment, English joints, cavity wall, curing.
  • Checked the plaster application and completion of plaster mash, Rush, right angle, thickness of plaster.
  • Checked walls surface preparation, primer, stoko, paint (before paint To check of humidity).
  • Checked wet area water proofing.
  • Checked wet and dry floor area surface, setting out of tiles and completion of tiles (grooves, spacers, alignment & level).
  • Checked cartan wall system & partition wall system.
  • Checked False ceiling (panel or grid ceiling, gypsum ceiling, suspended ceiling, tray ceiling) application system such as surfaces preparation anti fungus or dust resistant paint level, line, right angle and material as per approved method statement, drawing and specifications.
  • Checked doors, window frame and fixing of door and window
  • Checked light weight screed for finishing work (vinyl floor and raise floor).
2014, Burjuman Mall extension, Dubai, UAE:Burjuman Centre LLC has commissioned the part demolition and refurbishment of the existing 35,000 square meter Mall, located in the busy Bur Dubai area of Dubai. The refurbishment includes the incorporation of a new Carrefour supermarket, new Cinema Complex and a new Family Entertainment Centre and the total refurbishment of the common areas, services along with the retails

Project Summary (continued)

2013 – 2014 / AL SALAAM Consulting Architects, Engineers & Planers
2013-2014, Ain Al Fayda 2000 National villas, Al Ain, UAE:
Ain Al Fayda has 2000 National villas, 81000 square meter Area, located in the , Al Ain, UAE there we build 2000 villas, National school , Masjid
Responsibilities:
  • Checked the setting out of block work as per approved architecture drawing and completion of block work such as, approved mortar, grooves, alignment, English joints, cavity wall, curing.
  • Checked the plaster application and completion of plaster mash, Rush, right angle, thickness of plaster.
  • Checked of walls surface preparation, primer, stoko, paint (before paint to check of humidity).
  • Checked wet area water proofing.
  • Checked wet and dry floor area surface, setting out of tiles and completion of tiles (grooves, spacers, alignment & level).
  • Checked cartan wall system & partition wall system.
  • Checked false ceiling (panel or grid ceiling, gypsum ceiling, suspended ceiling, tray ceiling) application system such as surfaces preparation anti fungus or dust resistant paint level, line, right angle and material as per approved method statement, drawing and specifications.
  • Checked doors, window frame and fixing of door and window
  • Checked light weight screed for finishing work (vinyl floor and raise floor).
  • Checked rebar & Formwork for columns, core wall, retaining wall, slab application system, Raft application system.
  • Checked pile cap, pile cap treatment.
  • Checked waterproofing work system.
  • Checked concrete work on the check point and @ site.

2010 – 2013 / Ghantoot Contracting Company - QA/QC Engineer/(section Engineer)
2010 – 2013, Presidential Palace, Abu Dhabi, UAE
The development encompasses approximately 150 hectares, and includes the Palace and the required ancillary buildings. The Palace will exceeds 160000m2 of built area and contains several VIP wings, a Ministers wing, and several Majlis and Dining Halls. The Common Areas of the Palace utilizes an additional 5,614 square meters and includes a Main Entrance Hall, Main Hall, Fountain Courtyard, Media Hall, and a Press Centre. The ancillary buildings, which incorporate over 23000m2, includes a Public Majlis, Mosque, Staff & Military Accommodations, a Services Compound, and various Gatehouses and Watchtowers.
Responsibilities:
  • Inspect site conditions prior to start construction activities. Verify the compatibility of the site with the designed permanent works.
  • Maintaining quality control for all the material delivered to site as per Contract specification & conformance with approved samples.
  • Supervising sampling and testing of concrete, steel and other construction material.
  • Review of material submittals & methods of statements as per contact specification.
  • Review of mix designs for concrete and reporting to the resident engineer

  • Preparing the daily logs & reports. Maintain records of inspections made, test performed & work executed with photographs.
  • To oversee day to day activities pertaining to all civil construction works in accordance to project specification and standard, this includes review of IFC drawing revisions and field marked-up.
  • Responsible for geodetic surveying inspection and lay- out of horizontal control, vertical alignment and elevations and to ensure it conforms to the approved site development plan.
  • Daily coordination and meeting with the clients, consultants and site engineers, regarding the field changes prior to work execution and implementation.
  • Preparation of materials take – off, bar and concrete pouring schedule, work schedule, execution & implementation.
  • Ensuring the proper implementation of personnel quality systems and maintain overall quality of the work on day to day basis.
  • To check compatibility between production processes, test procedure and the applicable documentation through review of documents related to the various activities.
  • Ensuring appropriate supervision control of all work activities enabling quality related operations to be effectively covered.
  • Conduct inspection of deliverable material, in accordance to material standards and project specifications.
  • To finalize / prepare contract program in conjunction with planning department and to commit oneself to its achievement.
  • To formulate long term labor / plant resource schedules and to evaluate on bi-weekly basis.
  • To be able to substantiate any requests for additional resources through productivity related formulae.
  • To ensure that all members of the project team have a clear understanding of what is required to them.
  • To communicate by verbal / written means with the client’s representative to ensure contract requirements are being met.
  • To have a sound knowledge of contract costs with respect to resource allowances and to be able to demonstrate controls.
  • To authorize / review both temporary / permanent material requisitions.
  • Approve overtime, leave, labour and plant returns.
  • Prepare long term forecasts for any overseas major material

2008 – 2010 / AL BADI Contracting Company – Project Engineer
2008 - 2010, Armed Force Hospital (V.I.P & V.V.I.P Wards), Muscat, Oman:Armed Forces Hospital builds 2 wards located in the Al seeb in Oman Muscat. We complete structural and architectural and infrastructural. Its total area is 40000 square meters
Responsibilities:
  • Arranged BBS and give the details steel Forman for steel working
  • Tasked a long time planning and give weekly program for work
  • In-charged on daily report for daily activities and send PM
  • Completed all surveyor work with level and the do light
  • Arranged quantity for civil work

  • Checked MEP clearance before shutter
  • Oversee day to day activities pertaining to all civil construction works in accordance to project specification and standard, this includes review of IFC drawing revisions and field marked-up
  • Daily coordination and meeting with the clients, consultants and project engineers, regarding the field changes prior to work execution and implementation.
  • Preparation of materials take – off, bar and concrete pouring schedule, work schedule, execution & implementation.
  • Ensuring the proper implementation of personnel quality systems and maintain overall quality of the work on day to day basis.
  • Checking compatibility between production processes, test procedure and the applicable documentation through review of documents related to the various activities.
  • Ensuring appropriate supervision control of all work activities enabling quality related operations to be effectively covered.
  • Conduct inspection of deliverable material, in accordance to material standards and project specifications.
  • Ensure any subcontractors are appointed on time and be fully aware of any main contractor attendance required.

2007 – 2008 / Aliya Contracting Company – Site Engineer
2007-2008, G+6 16 Building Jerf Garden, Ajman , UAE:
Responsibilities
  • Prepare contract programme in conjunction with planning department.
  • Have sound working knowledge of specification, contract programme and drawings.
  • Assist in the short term programming of labour / plant resources.
  • Adopt a proactive role with respect to site safety and know company’s safety policy.
  • Raise requisitions for temporary works / miscellaneous works.
  • Assist in preparation of permanent material schedule.
  • Communicate instructions to site foremen / surveyors.
  • Be aware of wastage allowances.

2007 / K.K.P Contracting Company – Site Engineer
2007, Eden Villas Project, Lahore, Pakistan
Responsibilities:
To study the drawings, BOQ of the project.
To inspect the sites condition and compare it with the received drawings.
To prepare detailed work schedule to meet the agreed completion date.
To program the site work individually to meet the agreed schedule.
To arrange for all required submittals, samples, and shop drawings for consultant’s approval.
Site activities supervision and control.
To arrange for a regular site meeting for with the main contractor.
To attend all meetings with client and consultants.
Co-ordinate with the administration for daily correspondence.
Quality control and quality assurance with coordination with the HSE Manager.
Monitoring both related cost and time of the project.
Reporting to the management on a regular base, about work progress.
To follow up with all required permissions and certificates from local authorities.
To prepare progress payments on time as per the agreement.
To control the filling and recording all related documents in a proper and clear way
With coordination with the document controller.
To attend a proper handing over of the project to the main contractor through the consultant.
To carry out all snags required by the main contractor / consultant after the preliminary handing over.
Final payment submittal and collection, includes any deletion, additional or variation settlements..
To keep a high standard level of safety at site for all workers.
To keep all materials, tools and any other related items in a secured and safe place.
To program the working hours to meet the project requirements (to be approved by the management).

.

Trainings & Seminars

Date / Details
2014 / Fire Marshal Training Hyder Consulting Middle East Limited UAE
2013 / Osha safety certificate - presidential palace project UAE
2012 / Doka Formwork certificate - presidential palace project UAE

Contact:00971555188052 UAE

00971551311807 UAE

00923037005521 PAK