GREET PROJECT PROPOSAL TEMPLATE

Project title
Project description / Details of existing system[1]
-  Specify nos. & size of equipment in the existing system and the equipment schedule (if applicable)
-  Specify the age of the existing equipment/system
-  Specify the plant demand (e.g. cooling load, lux level requirements), and the efficiency of the existing system
-  Explain how existing system works
-  Provide schematic of the existing system
Details of the proposed system
-  Specify nos. & size of equipment in the proposed system and the proposed equipment schedule (if applicable)
-  Specify the estimated life-span of the proposed equipment/system
-  Explain how the proposed system works, and why it is more efficient than the existing system
-  Explain rationale for the equipment sizing selection, and provide study report if feasibility study was carried out on the proposed project
-  Specify the targeted efficiency of the proposed system, including breakdown of efficiency at component level (if applicable)
-  Provide schematic of the proposed system
Project energy savings / Provide estimated annual energy savings associated with the project
-  Provide step-by-step calculations on the energy savings and state assumptions (if any)
-  The energy price that is used to compute the energy cost savings should be average of past 12 months energy cost (excluding GST) divided by the energy consumption. [Note: this energy price will also be used to compute the post-implementation cost savings.]
Project costs / Provide detailed cost breakdown of the following including supporting quotations for all cost components:-
-  Manpower costs
-  Equipment and materials
-  Professional services (including details of professional’s designation, experiences, manhours and unit costs) [2]
Payback period / Payback = Project costs/ annual projected energy savings

[1] For projects from new developments, existing system refers to the baseline system selected/proposed by the company. Company must provide supporting documents to justify the selection of the proposed baseline system.

[2]

Designation / Experiences / Manhours (hours) / Unit cost ($/hour) / Total cost ($)
e.g. Professional Engineer / e.g. 10 years / e.g. 50 / e.g. 100 / e.g. 5,000