PROPOSED ODOR ELIMINATION SYSTEM FOR 260 RAILROAD HILL STREET, WATERBURY, CONNECTICUT
AiReactor, Inc. of Maspeth, New York, is to design,build,andinstallamultiplezonesystemtocontrolodorsanddustatthetransferstationlocatedat260RailroadHillStreet,Waterbury,CT.Themultiplezonesystemwillbedivided into3individualzones.Eachzonewillbeservicedbyahighwaterpressurepumpandmotor,vaporizingwater@l000 G.P.M.
Scopeofwork:
(Zone1)-An estimated 10,000sq.feetofthetransferstationwillreceivepaperandcorrugated.Thismaterialwilldevelopfinedustgeneratedbythehandlingandprocessing.Includedinthe10,000sq.feetsectionofthebuildingarethe(3)overhead20'Wx20'Hrollupdoorswhichrecyclingvehicleenterandexitfrom,Dustcontrolwillbeachievedbysecuring(2)100 footestimatednozzlesspanningthetippingfloorfromentranceoverheaddoorstoelevatedpickingline.Atotalof56 estimatednozzleassemblieswillbefittedonbothlinesalternatinginaleftrightpattern.Nozzleswillbeplaced4footoncenterformaximumcoverage.The(3)entranceoverheaddoorswillbefittedwitha"horseshoe"nozzlelinearoundtheframeofeachdoorvaporizingfromsidesandtop,totalof36nozzleassemblies.
(Zone2)-Theestimated20,525feetinteriorofthetransferstationwillbededicatedtoreceivingmunicipalsolidwasteandconstructiondemolition.Thisareawillrequireasystemcapableofcontrollingairborneodorsgeneratedbythereceivingandhandlingofmunicipalsolidwasteandairbornedustgeneratedbythereceivingandprocessingofconstructionanddemolitionmaterial.Sixnozzlelinessecuredtosixroofsteel"I"beamsupportswillspanthe entirereceivingandprocessingandhandlingofthemunicipalsolidwasteandconstructiondemolitionfromthefrontentranceoverheaddoortotherearwallofthebuilding.Estimated 125’feet,a totalestimated 150nozzleassembliesplaced5footoncenteralternatinginaleft/rightpatternwillbeinstalledformaximumeffectonbothodorsanddust.
(Zone3)- The(3)truckaccessoverheaddoorstothetippingfloorofthemunicipalsolidwaste andconstructiondemolitionareasandtheoverheaddoortothetrailerloadareawillbefittedwithnozzleassemblies.A"horseshoe"typenozzlelinewillbeplacedintheoverheaddoorframes,vaporizingfrombothsidesoftheoverheaddoorsandthetopcontrollingodorsanddustfromleavingthebuilding.
Allthreezoneswillbecontrolledbya wirelesshandheldtransmitter;eachzonecanbestarted andstoppedbysimplypressingabuttononthetransmitter(nobiggerthanakeychain ornament).Themaincontrolpanelwallmountedinthe"bunkerbuilding"willhaveamasteron/offswitchtoshutdownallthreezones.
The following is to be supplied by AiReactor, Inc.:
-(3) ZoneelectroniccontrolwallmountedpanelinNEMAEnclosureincludes:
•Masteron/offswitch
•HourMeter
•Pushbutton
•Lightedzonecontrolon/offswitchesforeach3 zones
•Cycletimeronall3zones
- (1)10GPMPumpandMotormodulemountedonaluminumdiamondplatebase,@220-230VAC,3phases@30amps.
-(1)4GPMPumpandMotormodule,mountedonaluminumdiamondplatebase
@220-230VAC,3Phase@20amps.
- (1)3GPMPumpandMotormodule,mountedonaluminumdiamondplatebase
@220-230VAC,3Phase
-Wirelesshandheld3zonetransmitterandreceiver.
- (9)WaterFilterBowls1O"Hx4"WSolidblueplastic.
- (9)WaterFilters,5,20,and30Micron
-Estimated1500'feetof"flextube",doublewalled
-Estimated1500' feetofcoatedAircraftcable.
-Estimated260SolidBrassNozzleTees.
-Estimated260SolidBrassNozzleBodies.
-Estimated26ffStainlesssteelnozzletipswithfilters.
-Estimated520Hydraulicfittingsets.
·- (3)36x30steeladjustablesuppo11tables
- (1)125 foot long plasticcurtain.Curtainwillbesuppliedin10'foot heightx12"Incheswide.The curtainwilldividethefiberreceivingandprocessingany areafromthemunicipalsolidwasteandconstructiondemolition.Thecurtainwillbeheldupbyagalvanizedsteelcable,estimated3/8-5/8inchdiameter.Theplastic1O'Hx12"Wplasticstripswillbeof aheavydutygauge.
-Allhardwaretofinishinstallation.
-4manteamofAiReactortechnicians.
The following is to be suppliedBy F&G, LLC:
-Electricpowersupply220-230V.A.C,3Phase,multipleampcircuitstobunkerbuildingwherepumpandmotorshoused.
-1” Waterlinew/ballvalveshut-offtobunkerbuilding,topumpsandmotors.
-40"Extensionboomwith2menplatform(gasoperated).