Attachment#1
Blanket Contract#0000000938 Change Order#1
Effective 10/01/07 to 09/30/12
Federal Signal Corporation
2645 Federal Signal Drive
University Park IL 60466-3195
Phone #: 1-800-832-5908 or 1-800-446-6809 Ext. 4896
Fax #: 1-800-682-8022
VISTA LIGHTBARS FOR POLICE AND FIRE DEPARTMENTS
Scope of Work:
To provide Vista Lightbars to the City of Seattle for Amber and Police Vehicle Lightbars and related accessories.
Ordering Information: Account number: 1538
Vendor contact: Jenny Gutierrez, Customer Support
Contact phone: 708-534-4883
Contact fax: 1-800-682-8022\
Contact Email:
Vendor Hours: M-F, 7:00-5:00 CST
F.O.B: Destination, Prepaid & Allowed
Warranty: Five (5) Years
Minimum Order: None
Delivery expectation: Not to exceed Forty-five (45) days.
Vendor Contract Contacts:
Primary: Kathy Moore, District Manager, Phone: 971-409-0578, Fax: 503-747-2846 or Email
Secondary: Don Cash, Regional Manager, Phone: 801-557-1940, Fax: 801-943-2778, Email
Contract Term:
This contract shall be for five (5) years, with a five (5) year extension allowed at the option of the City. Such extensions shall be automatic, and shall go into effect with or without written confirmation from the City to the Vendor, unless the City provides the Vendor advance notice of the intention to not renew. Such notice shall be given prior to the otherwise automatic renewal date.
Rates and Prices: Pricing shall be prepared with the following contract terms considered. The Buyer may exempt these requirements for extraordinary conditions that could not have been known by either party at the time of bid or for other circumstances beyond the control of both parties, as determined in the opinion of the Buyer. .
1. Parts Discount below Manufacturer List Pricing: For all contract items that are priced as a discount below Manufacturer List prices, there shall be not changes to the discount rate throughout the life of the contract including all extensions. As manufacturer list prices change, the net cost to the City will automatically change.
2. Fixed Offer and Hourly Rates (if any): For contracts where service is for on-going, multiple year supply, and for hourly rates. Requests for pricing or rate increases shall be considered only immediately prior to a contract anniversary period, as follows: Pricing shall be fixed and firm for the first two years of the contract. Forty-five days prior to the two-year anniversary, the Vendor may submit a written request for a price increase to the City Buyer. Thereafter, written request for price increases shall only be considered when provided at least 45-days prior to the contract anniversary date, and shall take effect on the contract anniversary date.
Such requests shall demonstrate the following:
§ Price request shall be no greater than the total of changes to the CPI Index for King County or other pricing index appropriate to the particular product herein;
§ Not produce a higher profit margin than that on the original contract;
§ Clearly identify the items impacted by the increase;
§ Be accompanied by documentation acceptable to the Buyer sufficient to warrant the increase;
§ And remain firm for a minimum of 365 days.
The request shall be considered by the Buyer and may be accepted or rejected. Failure to submit a price request at least 45-days prior to the contract anniversary date, shall result in a continuation of all existing pricing on the contract until the next contract anniversary date. The decision to accept any price increase will be at the sole discretion of the Buyer.
Cost Reductions: Any cost reductions to the Contractor, such as rebates or “specials”, shall be reflected in a reduction of the contract price effective immediately. Seattle will not be bound by prices contained in an invoice that are higher than those in the contract. Unless the higher price has been accepted by the City and the contract amended, the invoice may be rejected and returned to the Contractor for corrections.
Expansion Clause: Any resultant contract may be further expanded to include related products normally offered by the vendor, as long as the price of such additional products is based on the same cost/profit formula as the listed item.
Pricing
Seattle Vista® Light Bar
VISTA® Strobe LightBar (Upper Level for all Bars listed below)
(4 ) Strobe Heads – Amber Filters
Quad Flash
72 Flash Per Minute
16-joule per Head
Vista® Dual-Traffic Control
1. Model # X212FS99-001 (New Model# 581016-00061) Contract Price: $998
53" Vista® Amber upper, Clear lower, 30’ Cable, Perm
Mount, (2) Halogen Amber Signal Masters™
(Front & Rear Facing)
Note 1 Includes (2) 330104 Controllers.
NOTE 2 Above unit comes w/ Permanent Mount Feet.
2. Model # X112PS00-001 (New Model# 581014-00164) Contract Price: $968
44” Vista- Same as Item#1 except 44” Bar w/ 30’ Cable, and Permanent Mount Included.
Vista® Single-Traffic Control, REAR MOUNT
3. Model # X212P799 (New Model# 581016-00056) Contract Price: $788
53" Vista® Amber upper, Clear lower, 30’ Cable, Perm
Mount, (1)Halogen Amber Signal Master™
(Rear Facing)
NOTE: 1 Includes (1) 330104 Controller
NOTE: 2 Above Unit comes w/ Permanent Mount Feet.
Vista® Single-Traffic Control, FRONT MOUNT
4. Model # X212F700-001 (New Model# 581016-00062) Contract Price: $788
53" Vista® - Amber upper, Clear lower, 30’ Cable,
Perm Mount , w/ (1) Halogen Amber Signal Master™
(Front Facing)
NOTE 1 Includes (1) 330104 Controller
NOTE 2 Above Unit comes w/ Permanent Mount Feet.
Vista® – All Strobe ( No Signal Master )
5. Model # X212F100 (New Model# 581016-00063) Contract Price: $566
53" Vista® - Amber upper, Clear lower, 30’ Cable, Perm Mount Feet w/ Hardware.
6. Model # X112H100 (New Model # 581014-00186) Contract Price: $527
44” Vista –Same as above but, 44” Bar w/ 30’ Cable, and Hook Mount .
7. New Strobe/LED Model # 581016-00145
53” w/ 4 Strobe Pkg. upper level, and 2-(8 pod) Gen 1 LED Signalmasters, Lower Level
NOTE 1 Includes (2) 330104 Controllers.
NOTE 2 Above unit comes with Hook Mount and 30’ Cable. Contract Price: $1,096
.
8. New All LED Vista Model # 581034-Seattle
53” Vista with 8-6pk Solaris modules Upper Level, and 2-(8 pod) Gen 3 Solaris Signalmasters
Lower Level
Contract Price: $1,794
NOTE 1 Includes (2) 330104 Controllers.
NOTE 2 Above unit comes w/ Hook Mount, and 30’ Cable.
Specifications – Amp Draw-Halogen 8 head SignalMasters:
Standard Arrow 17.1 amp
Low Power Arrow 5.7 amp
4 Strobe Power Supply Only: 6.6 amps
· Amp draw measured by Bob Rottinghause, City of Seattle, on Nov. 27th, 2001
Specifications- Amp Draw-Gen 1 LED: 8 head SignalMaster:
Quad Flash/ Standard Arrow 2.4 amp (peak)
1.2 amp (avg.)
Specifications-Amp Draw-Gen 3/S2 LED: 8 head SignalMaster
Quad Flash/Standard Arrow 8.0 amp (peak)
4.0 amp (avg.)
Specifications – Dimensions:
· 53” Vista® 53.7 in × 18.3 in × 5.8 in
· 44” Vista® 44.9 in × 18.3 in × 5.8 in
NOTE: Two Model # 330102 included with lightbars w/ Front Rear Signal Masters. One Model# 330102 w/ lightbars with only one Signal Master (Front or Rear)
NOTE: All Hardware & Feet are included in the Box for Permanent Mount & Hook-Mount Applications.
NOTE: For Hook Mount Applications, the Make & Model Vehicle needs to be included w/ Order, so proper Hook Mount Hardware can be included in the box.
Lightbars
Amber models (see attached for specifics) / 581016-00061 / $ 998.00
581014-00164 / $ 968.00
581016-00056 / $ 788.00
581016-00062 / $ 788.00
581016-00063 / $ 566.00
581014-00186 / $ 527.00
New strobe/LED Models - Amber / 581016-00145 / $ 1,096.00
581034-Seattle / $ 1,794.00
Police Model / 581004-SPD / $ 609.00
New Police Model / TBD / TBD
Led Highlighter; permanent mount models:
Amber with Amber dome / 454201-02 / $ 268.60
Blue with Blue dome / 454201-03 / $ 268.60
Red with Red dome / 454201-04 / $ 268.60
Amber with Clear dome / 454201-25 / $ 268.60
Blue with Clear dome / 454201-35 / $ 268.60
Red with Clear dome / 454201-45 / $ 268.60
Red with Red dome, no rear facing LED's / 454216-04 / $ 262.65
Red with Clear dome, no rear facing LED's / 454216-45 / $ 262.65
Led Highlighter mounting accessories:
Riser Mount / 454217 / $ 25.73
Flat Mount kit / 454218 / $ 15.44
Self-leveling bracket / 210883 / $ 27.57
Quadraflare LED lights w/built in flashers
Warning lights with color lens and built-in flasher
Amber -A Red -R Blue -B / QL64XF- (color) / $ 85.75
Warning lights with clear lens and built-in flasher
Amber -A Red -R Blue -B / QL64XFC- (color) / $ 85.75
Split LED warning lights w/color lens and built in flasher
Description / Fed Signal Product # / Contract Price
Amber/Amber / QL64SF-AA / $ 104.86
Blue/Blue / QL64SF-BB / $ 104.86
Red/Red / QL64SF-RR / $ 104.86
Split LED warning lights w/clear lens and built in flasher
Red/Amber / QL64SFC-RA / $ 104.86
Red/Blue / QL64SFC-RB / $ 104.86
Combinations of Amber/Blue/Red / QL64SFC- (color) / $ 104.86
Bezel Mounts for Quadraflares:
Trim bezel, chrome with gasket / QL64MC / $ 6.13
Trim bezel, black with gasket / QL64MB / $ 6.13
Headlight Mount Kit / QL64MHL / $ 22.05
New 3600 Series LED Wide Angle lens w/built in flasher:
Amber/Amber lens / 360601-02 / $ 66.30
Blue/Blue lens / 360601-03 / $ 76.50
Red/Red lens / 360601-04 / $ 66.30
Amber/Clear lens / 360600-02 / $ 66.30
Blue/Clear lens / 360600-03 / $ 76.50
Red/Clear lens / 360600-04 / $ 66.30
3600 Bezel Mounts
Plastic surface mount (pair) / 330501 / $ 3.70
Flush mount (pair) / 330502 / $ 3.70
Side mirror mount, with rubber grommet (pair) / 330503 / $ 4.08
Dash/deck mount, plastic bezel sold individually / 330504 / $ 5.22
Cast surface mount, sold individually / 330505 / $ 12.75
Siren / TBD / TBD
Speaker and Brackets
MS100 Speakers / MS100 / $ 120.18
MS100 Speaker brackets / 8567079B-09 / $ 12.50
Signalmaster Controller / 330104 / $ 114.88
Maplite- FS Littlite / LF12TSB-LED / $ 71.05
Description / Fed Signal Product # / Contract Price
Cuda Lights (to be discontinued by 12/31/07) / Vendor to Quote per order
Solaris technology directional bars. / TBD / TBD
All other Catalog Items including replacement parts not listed / 47% off list price
Page 9 of 10
