2014
جامعةآلالبيت
دائرةالعطاءاتالمركزية Central Committee for Tender
مواصفات العطاء رقم (14/2014)
تطوير البنية التحتية للشبكة الحاسوبية (المرحلة الأولى)
Hardware requirements & performance Specifications needed in network infrastructure’s development solution at Al Albayt University.
- Core Switches (QTY: 2):
The two Core Switches should work as one Virtual Switch:
Ports required in each switch
48 x 10/100/1000 Base T Ports
8 x 10G SFP+ Ports (2 x LR SFP+ transceivers should be installed)
Each Switch should have EightI/O modules at least
All I/O modules shall be Non-blocking
Performance
Switching Capacity:5.0 Tbps minimum
Forwarding Capacity: 720 Mpps minimum
Modular Architecture (Software and Hardware)
Features
Layer 3 routing (Static, RIP, and OSPF)
Supports Spanning Tree Protocol (STP, RSTP, and MSTP)
IEEE 802.1Q VLAN
4,096 Active VLANs
Management: Web View, Telnet, SNMP, Console, RMON
802.1p prioritization
Shall be TACACS+ /RADIUS enabled
ACLs
IEEE 802.1s, IEEE 802.1w, IEEE 802.3ad
IEEE 802.1p prioritization, IEEE 802.1Q VLAN
Support MPLS
Physical Specifications
Rack mounted
Modular switch
Internal redundant power supply
- Aggregation Switches (QTY: 4):
Each two switches should work as one virtual switch
Each Switch shall provide a minimum of 16x 1G/10G Ports (SFP/SFP+) with the capability to be upgraded in the future
2x SFP+ Transceivers (LR) per switch
12 x SFP Transceivers (SX) per switch
Switch Throughout: 250 Mpps minimum
Switch Capacity: 640 Gbps at least
MAC Table Size: 32,000
Layer 3 routing (Static, RIP, and OSPF)
Internal redundant power supply
- Access Switches – 48 Port (QTY: 22):
Each Switch shall provide 48 x 100/1000 Mbps UTP Ports
Each Switch shall provide 2 x 1G/10G (SFP/SFP+) for uplink (Excluding the stacking ports)
1 x SFP Transceivers (SX) per switch
Should be stackable switch and support up to 8 switches at least in the stack group with stacking speed of 80Gbps at least.
Switch Capacity: 100 Gbps at least
Forwarding Rate: at least 100 Mpps
The switch should be hardware ready MAC sec
Support IEEE 802.1s, IEEE 802.1w, IEEE 802.3ad, IEEE 802.1p prioritization, and IEEE 802.1Q VLAN
- Access Switches – 24 Port PoE+ (QTY: 25):
Each Switch shall provide 24 x 100/1000 Mbps PoE+ Ports
Each Switch shall provide 2 x 1G/10G (SFP/SFP+) for uplink (Excluding the stacking ports)
1 x SFP Transceivers (SX) per switch
Should be stackable switch and support up to 8 switches at least in the stack group with stacking speed of 80Gbps at least
Switch Capacity: 88 Gbps at least
Forwarding Rate: at least 65 Mpps
The switch should be hardware ready MAC sec
Support IEEE 802.1s, IEEE 802.1w, IEEE 802.3ad, IEEE 802.1p prioritization, and IEEE 802.1Q VLAN
- Access Switches – 24 Port (QTY: 5):
Each Switch shall provide 24 x 100/1000 Mbps UTP Ports.
Each Switch shall provide 2 x 1G/10G (SFP/SFP+) for uplink (Excluding the stacking ports)
1 x SFP Transceivers (SX) per switch
Should be stackable switch and support up to 8 switches at least in the stack group with stacking speed of 80Gbps at least
Switch Capacity: 88 Gbps at least
Forwarding Rate: at least 65 Mpps
The switch should be hardware ready MAC sec
Support IEEE 802.1s, IEEE 802.1w, IEEE 802.3ad, IEEE 802.1p prioritization, and IEEE 802.1Q VLAN
Note: Items 3 and 4 switches and should be stack compatible since some of them will be installed in the same rack . and all proposed switches should have the same operating system (same command line) .
- Monitoring & Management Appliance (QTY: 1):
Shall be from the same vendor of the switching part
Support all hardware items that are mentioned in this tender
Licensed for 70 devices at least and the appliance should be upgradable to support 500 devices
Web based interface
Dashboards allow for real-time performance and event monitoring
Must provide Real-time Fault Detection, Analysis, and Reporting
Support Device Configuration.
- Free Certified Training ( in a certified training center ):
- Certified training for the Five Engineers in Associate Level with International certificate exams.
- Certified training for the Four Engineers in Professional Level in Routing and Switching with International certificate exams. (Outside Training)
- Certified training for the Four Engineers in Certified Information Systems Security Professional (CISSP ) with International certificate exam.
- Certified training for the Two Engineers in Certified Ethical Hacker ( CEH), with International certificate exam.
- Certified training for the One Engineers in Computer Hacking Forensic Investigator ( CHFI), with International certificate exam. (Outside Training)
- Specifications for Structured cabling system :
8.1Design Overview:
The Backbone fiber optic cable (FO) has been chosen for the subject projects. The cabling infrastructure shall be used to carry the Data and Telecommunications Network Communications across all levels and floors. The following information below shows the compliance and standard to be used in the design and building of this infrastructure.
All Backbone fiber optic cable components and installation have been certified by third party laboratories and are compliant to the latest International Standards and Regulations for cabling infrastructure: Backbone fiber optic cable components and installation comply with the following main recommendations of the Electronic Industries Association (EIA) and International Electro-technical Commission (IEC):
- ISO/IEC 11801 latest edition regarding Structured Cabling System performance levels and design rules.
- ISO/IEC TR 14763-2 regarding Structured Cabling System sizing in premises.
- EIA/TIA 568 Standard on Commercial Buildings for Telecommunication Wiring.
- EIA/TIA 569 Standard on Commercial Buildings for Telecommunication Cable Trays and Areas.
- EIA/TIA 606 Standard on Telecommunications Infrastructure. This document provides the document user with guidelines and choices for administration classes for maintaining telecommunications infrastructures.
- EIA/TIA 607 Standard on Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications (ANSI/J-STD-607-A-2002).
- IEC 60754-1 & 2 Standard on Tests on gases evolved during combustion of materials from cables and Tests on gases evolved during combustion of electric cables.
- IEC 61034-1 & 2 Standard on Tests and Measurement of smoke density of cables burning under defined conditions.
- IEC 60331 Standard, parts 11 & 12, on Tests for electric cables under fire conditions.
- IEC 60332 Standard on Tests on electric cables under fire conditions.
- IEC 60364-1 Standard on Electrical installations in Buildings, Fundamental principles, Assessment of general characteristics, definitions.
- IEC 60794, 60874, 61073 and 61300 Standards on fiber-optical connecting hardware.
- IEC 60603 Standard on wired connecting hardware used with balanced cabling.
- ISO 8877 Standard (sockets, RJ45-type plugs).
ISO: International Standardization Organization. Promotes the development of international standardization for scientific, technological and economic activities. The Technical Committee97 (Information Processing) has developed a seven-layer communications reference model that allows multiple-protocol and multiple-vendor environments to interconnect and interoperate.
CCITT: International Telegraph and Telephone Consultative Committee. CCITT recommendations have the status of law in most European countries, and the USA follow CCITT recommendations. Study groups are responsible for data communications interfaces, services and transmission.
NEC: National Electrical Code. Many local building codes are based on NEC practices, which must be followed by those responsible for providing safe communication-system implementation. Articles 700-800 of the NEC handbook address communications cabling issues.
BICSI: Building Industry Consulting Service International. This organization publishes the Telecommunications Distribution Methods Manuel (TDM), which is a comprehensive collection of accepted practices in communications-system design and methodology. BICSI provides a competency examination for the professional designation of registered Communications Distribution Designers. This manual should be used as a reference only.
The above list, originating from standard organizations, is incomplete. Additional considerations may have to be taken into account for protecting communications equipment and data-processing equipment and for the protection of data from intrusion, induced noise or other events that may disrupt vital operation.
Structured Cabling System components and installation shall also be compliant with Jordanian standards and TRC regulations.
8.2Warranty
There are two types of warranty:
- 3 years warranty shall be provided on the installation.
- 20 years on Materials and products warranty from the manufacture.
System Architecture
Item No. / Description / QtyFiber Optic Cabling
Zone C
Supply, install, test and commission Fiber optic cabling solution, price to include all required fiber cables and accessories to complete the job.
As described in Specifications
1 / Aggregation Sites
1.1 / Building (30) - مركز الحاسوب
a. 12 Port fiber patch panel SM SC type with Pigtails. / 2
b. SC-LC 3M Single Mode Patch Cord / 4
c. SC-LC 15M Single Mode Patch Cord / 2
d. 42U Data Cabinet 800*1000. / 1
1.2 / Building (34) –كلية التمريض
- 12 Port fiber patch panel SM SC type with Pigtails.
- 24 Port fiber patch panel MM SC type with Pigtails
- SC-LC 3M Single Mode (OS2) Patch Cord
d. SC-LC 3M Multimode (OM3) Patch Cord / 20
e. Wall mounted 12U Data Cabinet. / 1
1.3 / Building (12) مجمع قاعات قريش -
a. 12 Port fiber patch panel SM SC typewith Pigtails. / 2
b. 24 Port fiber patch panel MM SC typewith Pigtails. / 3
c. SC-LC 3M Single Mode (OS2) Patch Cord / 4
d. SC-LC 3M Multimode (OM3) Patch Cord / 20
e. Wall mounted 12U Data Cabinet. / 1
2 / Access Sites
2.1 / Building (3) المتحف -
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.2 / Building (5) مبنى الرئاسة -
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.3 / Building (7) دار الندوة-
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.4 / Building (8) مبنى الرفادة والسقاية -
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.5 / Building (10) المكتبة الهاشمية-
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.6 / Building (32) شؤون العاملين -
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.7 / Building (33) – مالك بن انس
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.8 / Building (35)عمادة كلية تكنولوجيا المعلومات -
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.9 / Building (36) مبنى جعفر الصادق
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.10 / Building (9)دائرة التسجيل -
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.11 / Building (11) الإمام مسلم -
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.12 / Building (13) معهد العمارة -
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.13 / Building (14) علوم الأرض -
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.14 / Building (15) - الفلك
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.15 / Building (16) كلية الهندسة -
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.16 / Building (17) عمادة شؤون الطلبة -
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
2.17 / Building (84) مبنى المستشار الثقافي-
a. 8 Port fiber patch panel MM SC type with Pigtails. / 1
b. SC-LC 3M Multimode Patch Cord / 2
c. Wall mounted 12U Data Cabinet. / 1
3 / Aggregation Fiber Optic Cabling
Supply,install, test and commission 12 coreOS2 fiber optic ring, price to include FO cables, pulling, termination, 50mm PVC conduits inside buildings
as stated in specifications.
1. From Building (30) to Building (34) / 380m
2. From Building (30) to Building (12) / 1025m
3. From Building (34) to Building (12) / 825m
4 / Fiber Optic Cabling
Supply,install, test and commission8 core OM3 fiber optic backbone cable, price to include cables, pulling, termination, 50mm PVC conduits inside buildingsas stated in specifications
1. From Building (34) to Building (4) / 685m
2. From Building (34) to Building (5) / 285m
3. From Building (34) to Building (7) / 465m
4. From Building (34) to Building (8) / 585m
5. From Building (34) to Building (10) / 475m
6. From Building (34) to Building (32) / 130m
7. From Building (34) to Building (33) / 130m
8. From Building (34) to Building (35) / 185m
9. From Building (34) to Building (36) / 185m
10. From Building (12) to Building (9) / 160m
11. From Building (12) to Building (11) / 250m
12. From Building (12) to Building (13) / 60m
13. From Building (12) to Building (14) / 325m
14. From Building (12) to Building (15) / 140m
15. From Building (12) to Building (16) / 380m
16. From Building (12) to Building (17) / 380m
17. From Building (12) to Building (84) / 295m
8.3Materials Specifications
8.4.1multi- mode fiber optic cable
The OM3 multimode fiber cable shall have the following specifications:
Characteristics / ValueCore diameter / 50 ± 3 µm
Coating diameter / 125 ± 2 µm
Attenuation: = 850nm
= 1300nm / ≤ 3,0 dB/Km
≤ 1,0 dB/Km
Bandwidth: = 850nm
= 1300nm / ≥ 1500 MHz.km
≥ 500 MHz.km
Support 1000 base SX / Up to 600 m
Support 1000 base LX / Up to 2000 m
Support 10G base S / Up to 300 m
Support 10G base LX4 / Up to 300 m
The color code of the fiber cable as follows:
Core / Color / Core / Color / Core / Color / Core / Color1 / Blue / 7 / Red / 13 / Blue + 1ring / 19 / Blue + 2rings
2 / Orange / 8 / Black / 14 / Orange + 1ring / 20 / Orange + 2rings
3 / Green / 9 / Yellow / 15 / Green + 1ring / 21 / Green + 2rings
4 / Brown / 10 / Violet / 16 / Brown + 1ring / 22 / Brown + 2rings
5 / Grey / 11 / Pink / 17 / Grey + 1ring / 23 / Grey + 2rings
6 / White / 12 / Turquoise / 18 / White + 1ring / 24 / White + 2rings
8.4.2single-mode fiber optic cable
The OS1 or OS2 Single mode fiber cable shall have the following specifications:
Characteristics / ValueCore diameter / 9.2 ± 0.5 µm
Coating diameter / 125 ± 2 µm
Attenuation: = 1300nm
= 1550nm / ≤ 0.42 dB/Km
≤ 0.28 dB/Km
Dispersion range: = 1300nm
= 1550nm / ≤ 3.5 ps/nm.km
≤ 18 ps/nm.km
Support 1000 base LX / Up to 5000 m
Support 10G base LR / Up to 10000 m
The color code of the fiber cable as follows:
Core / Color / Core / Color / Core / Color / Core / Color1 / Blue / 7 / Red / 13 / Blue + 1ring / 19 / Blue + 2rings
2 / Orange / 8 / Black / 14 / Orange + 1ring / 20 / Orange + 2rings
3 / Green / 9 / Yellow / 15 / Green + 1ring / 21 / Green + 2rings
4 / Brown / 10 / Violet / 16 / Brown + 1ring / 22 / Brown + 2rings
5 / Grey / 11 / Pink / 17 / Grey + 1ring / 23 / Grey + 2rings
6 / White / 12 / Turquoise / 18 / White + 1ring / 24 / White + 2rings
8.4.3 Patch Panel Fiber Optic
There are two types of patch panel:
Multi- mode patch panel
The OM3 fiber optic patch panel shall have the following items:
- Mount to standard 19” racks.
- 1 rack unit height.
- Sliding tray removes completely from enclosure to facilitate field terminations and splicing.
- Sliding tray glides forward and backward providing accessibility to front and rear of bulkhead after installation.
- Removable transparent hinged doors and slide-away covers allow easy access during install and visibility of interior after install.
- Patch cord bend radius guides minimize macro bending.
- Pack plates loaded with duplex SC adapters.
Single- mode patch panel
The OS1 or OS2 fiber optic patch panel shall have the following items:
- Mount to standard 19” racks.
- 1 rack unit height.
- Sliding tray removes completely from enclosure to facilitate field terminations and splicing.
- Sliding tray glides forward and backward providing accessibility to front and rear of bulkhead after installation.
- Removable transparent hinged doors and slide-away covers allow easy access during install and visibility of interior after install.
- Patch cord bend radius guides minimize macro bending.
- Pack plates loaded with duplex SC adapters.
8.4.4 Fiber optic pigtials
Multi- mode & Single-mode pigtail:
- Fiber-optical pigtails shall be complied with ISO 11801 and they shall be directly integrated in the SC couplers of an optical patch-panel.
Characteristic
Connector style / SC
Fiber connector type / Single-mode / Multimode
Material / Ceramic end-fitting
Max. attenuation of 0.15 dB / 850 nm for Multimode
1310 for Single-mode
8.4.5 fiber optic patch cord
Multi- mode & Single-mode fiber patch cord:
a.2 core multimode OM3 fiber-optical 50/125 or 2 core single-mode fiber-optical 9/125.
b.The fiber-optical type shall be visually recognizable according to the connectors' color.
c.Low-Smoke Zero-Halogen outer sheath.
d.Metric marking indicating type of cable, year, ref., number.
e.SC-LC duplex connectors.
f.Lengths of 3 meter.
g.Protection by a sleeve at each end.
8.4.6 Rack Cabinet
The cabinet required for computer center subcabinets should as a minimum comply with the following:
- Computer center cabinet to have a size (800*1000mm).
- Sub cabinet to have a minimum size (600*600mm).
- The computer center cabinet doors shall be perforated two front door, and two rear doors.
- The cabinets shall be sized to provide space for the installed patch panels, wire management, and active equipment plus 25% for future expansion.
- The cabinet shall support both passive and active equipment.
- Vertical cable channels for cable organization (42U cabinets 800*1000)
- Can accommodate both ''19'' and ETSI equipment.
- Lockable side panels.
- Low noise, top mounted fan trays.
- Subcabinet shall include 2 fans, and main cabinet 4 fans.
- The cabinet shall meet the following standards
- IEC297-2
- EN 60950
- DIN 41494, PART 7
- DIN41491 PART 1
- VDE 0100
- ETSI
9 . Notes:
The bidder should provide 3 years warranty , included any update or upgrade for OS firmware.
The bidder should provide prove of concept to solve Layer 2 Security issues like : ARP spoofing, MAC flooding, VLAN hopping, DHCP attacks, Port Security ,and Spanning Tree Protocol concerns.
The training must covering the original training materials with real hands-on lab , and should cover all core and important proposed Switching solution .
The Bidder should include in his offer the courses outline, prerequisites and duration
The bidder should cover the flight ticket, visa arrangement, hotel accommodation for outside training
The training items , 1 and 2 must be taken, before the beginning of implementation the project.
The Network Topology Between Data Center and Aggregation sites is shown in figure_1.
Figure_1 : The Network Topology Between Data Center And Aggregation Sites.
Each one of the aggregation sites should have two aggregation switches, which should work as one virtual switch.
The Network Topology Between Aggregation sites and Edges Sites shown in figure_2(a+b).
Figure_2(A) : The Network Topology Between Aggregation Site (1) and it’s Edge Sites.
Figure_2(B) : The Network Topology Between Aggregation Site (2) and it’s Edge Sites.
The bidder should comply with all civil works required for the implementation of this project.
The bidder should use the existing fiber-optic paths , in case there is needing to Drill new path, adding a new pipes , conducting maintenance or cleaning of the existing tracks and pipes , the bidder should do all civil works necessary (it is possible to do site survey for the current fiber-optic paths , to help putting the total cost of civil works).
The bidder should comply with all crisis reforms when he has any damage to assets, both in the existing network or any of the other University property.
The bidder should attach a CV for people who will do implementing ,configure and install of all equipments in this solution . Where they should be certified with experience and high efficiency.
The bidder should mention that the provision of any of the materials and equipment necessary for the implementation of this solution, in case they didn't mention in this document. Where he is obliged to implementation and operation of this solution.