Corrigendum

Ref: Tender Enquiry no. S-2/108-P(BBS-DAS) WIHG/2017-18 Dated 24.12.2017 due on 29.01.2018.

Sr. no 8 of “Terms and conditions”

For

80% payment to the overseas suppliers will be made by us through Wire transfer after receipt of supply at Wadia Institute of Himalayan Geology, Dehradun and remaining 20% will be made by us through Wire transfer after satisfactory installation/commissioning and acceptance of supply.

Read

80% payment to the suppliers will be made by us through Wire transfer/RTGS after receipt of supply at Wadia Institute of Himalayan Geology, Dehradun and remaining 20% will be made by us through Wire transfer/RTGS after satisfactory installation/commissioning and acceptance of supply at different sites.

Sr. no 11 of “Terms and conditions”

For

“Installation/Commissioning of the system will have to be arranged by you/your principals/Indian Agents. Demonstration & working of the complete functionality /features of the supplied unit shall be done after supply at WIHG, Dehra Dun. In case, Installation/Commissioning/training charges are to be paid extra, the same MUST be specified in the offer, failing which the offered rates will be treated as inclusive of installation/commissioning/training charges. Name and postal address of the agency who will provide after sales service MUST be clearly mentioned in your offer. Installation/ Commissioning/Training clauses MUST be clearly mentioned in your offer (both in technical and commercial bids).”

Read

“Installation & Commissioning of the system will have to be arranged by you/your Principals/Indian Agents at different sites {(From Passighat to Tuting in Arunachal Pradesh, North-East India) (Elevation 200-3000 m} Details of these sites will be provided by this Institute. * The consignment is first required to be sent to Wadia Institute of Himalayan Geology, Dehradun for physical checking/segregation/testing & demonstration. The expenditure towards the transportation of these consignment from WIHG to the respective sites will be borne by our Institute. In case, Installation/Commissioning charges are to be paid extra, the same MUST be specified in the offer, failing which the offered rates will be treated as inclusive of installation/commissioning charges. Name and postal address of the agency who will provide after sales service MUST be clearly mentioned in your offer. Installation/ Commissioning clauses MUST be clearly mentioned in your offer (both in technical and commercial bids).”

*Note: Information regarding the readiness of consignment/shipment may be sent to WIHG one month in advance to enable us to do the site preparation.

Addendum:-

50 / DC power supply for Sensors, DAS, GPS for each BBS (08) equipment. / a)  All these equipment will be powered through SMF batteries charged through Solar Panel.
b)  Bidders should provide power calculations for each BBS equipment for power back up for at least 5 days and supply solar panels, Solar Charge controllers and SMF batteries (08 Nos each).

Note: Tender enquiry no. S-2/108-P(BBS-DAS) WIHG/2017-18 Dated 24.12.2017 which was due on 29.01.2018 is being extended upto 12.02.2018 (1.00pm) The bids will be opened on 12.02.2018 at 3.00pm.